Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹2.5 L+₹13,608 (5.68%)Accepted-Finance | L2 | Accepted-Finance Second lowest |
| Sl No | Description | Qty | Unit | Benny O.M. L1 | S M CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4.9 | cum | 2,100 ₹10,290 Lowest | 2,400 ₹11,760 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 46.98 | cum | 250 ₹11,743.75 Lowest | 250 ₹11,743.75 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.38 | cum | 7,600 ₹48,450 Lowest | 8,000 ₹51,000 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 80 | sqm | 600 ₹48,000 Lowest | 625 ₹50,000 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | cum | 8,700 ₹87,000 Lowest | 9,000 ₹90,000 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.36 | cum | 9,200 ₹12,512 Lowest | 10,000 ₹13,600 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 50 | sqm | 430 ₹21,500 Lowest | 500 ₹25,000 |
Tender Value
₹2.2 L
EMD Value
₹5,500
Closing Date
7 Oct 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Subdivision Muvattupuzha
GENERAL-Pre Monsoon Preparedness -Side Protection Works to the Breached portion of kayanad lift Irrigation Canal of Muvattupuzha Constituency-General Civil Work-General Civil Work
2026_Irrig_874460_1
IRR/IA/TR/3224/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Kayanadu
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹5,500
Yes
9 Oct 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4.9 | cum | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 46.98 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.38 | cum | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 80 | sqm | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | cum | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.36 | cum | - | - |
| 1.007 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 50 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1484269.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1484269.xls
BOQ • 0.30 MB
AFFIPREMONSOONKAYANAD.pdf
Tender Documents • 0.56 MB
epaymentformPREMONSOONKAYANAD.pdf
Tender Documents • 0.01 MB
FOTPREMONSOONKAYANAD.pdf
Tender Documents • 0.54 MB
IntegritypactCERTIFICATEPREMONSOONKAYANAD.pdf
Tender Documents • 0.01 MB
PRELIPREMONSOONKAYANAD.pdf
Tender Documents • 0.83 MB
SBDPREMONSOONKAYANAD.pdf
Tender Documents • 3.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .