Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.0 L
EMD Value
₹10,061
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Chengal, Painkimala, Kannamkulam, Onamvely, Piraroor and Kodinjili LIS under Electrical Irrigation Section Kalady - Electrical General Electrical Work
2025_Irrig_811435_2
PWD/BLDG/10715/KLDY/2025-2026
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹890
₹10,061
17 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Work Name:GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Chengal, Painkimala, Kannamkulam, Onamvely, Piraroor and Kodinjili LIS under Electrical Irrigation Section Kalady - Electrical-General Electrical Work
ew industrial type ball bearing 6313 , SKF / FAG or equivalent, suitable for 30 HP motor / pump set, as per the direction of Departmental staff at site.ÜOD56994/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6307 , SKF / FAG or equivalent, suitable for 25 HP motor / pump set, as per the direction of Departmental staff at site.ËOD57005/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump as per the direction of Departmental staff at site.'OD56999/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 50 HP motor's fully automatic star delta starter'OD57006/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 40 HP motor's fully automatic star delta starter'OD56997/2025-2026:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 40 or equivalent suitable for 25 HP motor's fully automatic star delta startergOD56988/2025-2026:Supply and fixing of L&T MN5 Overloa
elay for 50 HP Squirrel cage motor starterZOD56989/2025-2026:Supply of electronic timer for FASD(L&T ST 80329000 ) or equivalent aOD57000/2025-2026:Supply , Conveyance and fitting 315/400 A, HRC Fuse Base with suitable HRC Fuseno Motor AMCOD57008/2025-2026:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 5 Motors, 12 months for Each Motor). DaylOD57007/2025-2026:Fully Comprehensive Annual Maintenance of 1 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed.øOD57011/2025-2026: Fully Comprehensive Annual Maintenance of 40 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .%OD57012/2025-2026:Fully Comprehensive Annual Maintenance of 25 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total two motors, 12 months for each motor) éOD57010/2025-2026:Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total six motors,12 months for each motor) »OD57009/2025-2026:Fully Comprehensive Annual Maintenance of 50 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged
parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . Motor Lifting WorksOD56981/2025-2026: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. ÔOD56982/2025-2026:Lifting the 25 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. WindingoOD127626/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power greater than 25 HP,leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance.including resetting, refitting, coupling with pump, giving connection, taking trial run with full load etc. complete ÖOD127634/2025-2026:Charges
摮湩桴畢湲⁴潲潴⽲瑳瑡牯ⴠ猠灥牡瑡瑳瑡牥愠摮爠瑯牯猯慴潴Ⱳ搠獩慭瑮楬杮琠敨搠浡条摥爠瑯牯猯慴潴楷摮湩牦浯琠敨爠瑯牯猯慴潴汳瑯ⱳ挠敬湡湩桴汳瑯敮瑡祬湩畳慬楴杮琠敨猠潬獴眠瑩潣牲捥⁴汣獡景椠獮汵瑡湩慰数Ⱳ眠湩楤杮琠敨爠瑯牯猯慴潴楷桴朠潯畱污瑩⁹潣牲捥⁴慧杵景猠灵牥攠慮敭汬摥挠灯数楷摮湩楷敲ⱳ挠潬楳杮琠敨爠瑯牯猯慴潴汳瑯楷桴映扩敲眠摥敧ⱳ瀠瑵楴杮瀠潲数湩整慬敹湩畳慬楴湯潣湮捥楴杮琠敨挠楯湥潣湮捥楴湯牰癯摩湩敮⁷潲潴⽲瑳瑡牯氠慥楷敲瑳敥楢摮湩桴癯牥慨杮眠瑩牰灯牥椠獮汵瑡潩瑡戠瑯湥獤敨瑡湩桴潣汩湡慶湲獩楨杮眠瑩潧摯焠慵楬祴椠獮汵瑡潩慶湲獩ⱨ欠敥⁰瑩映牯搠祲湩Ⱨ爠慥獳浥汢湩湡整瑳爠湵楮杮䰨獥捳慲⁰潣灰牥
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
SBD.pdf
Tender Documents • 1.63 MB
NIT.pdf
Tender Documents • 0.03 MB
MAKE.pdf
Tender Documents • 0.30 MB
BOQ_1354998.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .