| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC 233 CHUDUKATTIL VAZHAPPALLY P O CHANGANACHERRY KOTTAYAM 686 103 | CHANGANACHERRY | KOTTAYAM | KERALA | 686103 | ₹15.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.9 LRejected-AOC | ₹15.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹16.2 LRejected-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | ₹16.2 L | L3 | Rejected-AOC L3 |
| 4 | L4₹17.0 LRejected-AOC | ₹17.0 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | SWATHY CONSTRUCTIONS L4 | GEORGE JOSEPH L3 | GIMMY PAULOSE L2 | WE CARE TOTAL BUILDING SOLUTIONS L1 |
|---|---|---|---|---|---|---|---|
| 1.00Civil Work | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 50.4 | cum | 350 ₹17,640 | 260.21 ₹13,114.58 | 256.34 ₹12,919.54 | 400 ₹20,160 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 50.4 | cum | 350 ₹17,640 | 363.32 ₹18,311.33 | 357.92 ₹18,039.17 | 400 ₹20,160 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.29 | cum | 8,000 ₹50,304 | 8,012.22 ₹50,380.84 | 7,893.22 ₹49,632.57 | 7,500 ₹47,160 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 109.2 | cum | 8,500 ₹9.3 L | 8,426.92 ₹9.2 L | 8,301.77 ₹9.1 L | 8,200 ₹9.0 L |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.25 | cum | 10,500 ₹55,125 | 10,063.57 ₹52,833.74 | 9,914.11 ₹52,049.08 | 9,300 ₹48,825 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.01 | cum | 11,000 ₹11,154 | 10,593.66 ₹10,741.97 | 10,436.33 ₹10,582.44 | 10,400 ₹10,545.60 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 24.36 | sqm | 950 ₹23,142 | 390.02 ₹9,500.89 | 384.23 ₹9,359.84 | 350 ₹8,526 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 5.52 | sqm | 950 ₹5,244 | 1,018.64 ₹5,622.89 | 1,003.15 ₹5,537.39 | 950 ₹5,244 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 332.08 | kilogram | 114 ₹37,857.12 | 113.55 ₹37,707.68 | 111.87 ₹37,149.79 | 102 ₹33,872.16 |
Tender Value
₹16.0 L
EMD Value
₹40,003
Closing Date
16 Feb 2026, 3:00 pmClosed
Executive Engineer
O/O of Exe. Engineer, KSHB, Kattappana
The work includes RR masonry, retaining wall, compound wall, and gate works.
2026_KSHB_834582_1
03/KSHB/IDK/2025-26
Open Tender
Civil Works - Buildings
180 days
Vazhathoppu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹40,003
Yes
17 Apr 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
16 Feb 2026
7 Feb 2026
Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_1403897.pdf
finsummary_1403897.pdf
aoc.pdf
finance_1403897.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
doc.pdf
Tender Documents • 0.53 MB
BOQ_1403897.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid