Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
15 Oct 2024, 3:00 pmClosed
PR & CC
HPCL is a fortune 500 and Govt. of India Maharatna Company, committed to providing quality energy
2400016233-HC-07370
5100016233
Open Tender
Jodhpur, Rajasthan
₹0
Exempted
15 Oct 2024
24 Sept 2024
15 Oct 2024
15 Oct 2024
24 Sept 2024 - 8 Oct 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HOT REPAIR OF 14.2 KG | HOT REPAIR OF 14.2 KG — SUAL INSPECTION AS PER IS-13258:1991 (LATEST),DEGASSING OF CYLINDERS BY FILLING WITH WATER,DE-DENTING OF CYLINDERS, REPLACEMENT FOOT RINGAND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING,SHOT BLASTING, METALLIZING, PAINTING, STENCILING,FIXING OF VALVE, P UMATIC TESTING ETC. COMPLETEHOT REPAIR OF CYLINDERS INCLUDING CUTTING ANDREMOVING FOOT RING AND VP RINGS, AND WELDING NEWFOOT NG AND VP RING, AS PER SPECIFICATION. | - | Each |
| 2 | HOT REPAIR OF 19 KG | HOT REPAIR OF 19 KG — SUAL INSPECTION AS PER IS-13258:1991 (LATEST),DEGASSING OF CYLINDERS BY FILLING WITH WATER,DE-DENTING OF CYLINDERS, REPLACEMENT FOOT RINGAND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING,SHOT BLASTING, METALLIZING, PAINTING, STENCILING,FIXING OF VALVE, P UMATIC TESTING ETC. COMPLETEHOT REPAIR OF CYLINDERS INCLUDING CUTTING ANDREMOVING FOOT RING AND VP RINGS, AND WELDING NEWFOOT NG AND VP RING, AS PER SPECIFICATION. | - | Each |
| 3 | HOT REPAIR OF 35 KG | HOT REPAIR OF 35 KG — SUAL INSPECTION AS PER IS-13258:1991 (LATEST),DEGASSING OF CYLINDERS BY FILLING WITH WATER,DE-DENTING OF CYLINDERS, REPLACEMENT FOOT RINGAND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING,SHOT BLASTING, METALLIZING, PAINTING, STENCILING,FIXING OF VALVE, P UMATIC TESTING ETC. COMPLETEHOT REPAIR OF CYLINDERS INCLUDINGLOADING/UNLOADING AND TO AND FRO TRANSPORTATIONCHARGES BETWEEN PL T AND REPAIRERS UNIT. JOBINCLUDES CUTTING AND REMOVING FOOT RING AND VPRINGS, AND WELDING NEW FOOT RING AND VP RING, ASPER SPE FICATION. THE RATE TO EXCLUDE SUPPLY OFCONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIREFOR METALIZING, PRIMER, PAINT (FOR CYLIND ANDSTENCILING) AND TEFLON TAPE FOR VALVE FIXING. | - | Each |
| 4 | HOT REPAIR OF 47.5 KG | HOT REPAIR OF 47.5 KG — SUAL INSPECTION AS PER IS-13258:1991 (LATEST),DEGASSING OF CYLINDERS BY FILLING WITH WATER,DE-DENTING OF CYLINDERS, REPLACEMENT FOOT RINGAND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING,SHOT BLASTING, METALLIZING, PAINTING, STENCILING,FIXING OF VALVE, P UMATIC TESTING ETC. COMPLETEHOT REPAIR OF CYLINDERS INCLUDINGLOADING/UNLOADING AND TO AND FRO TRANSPORTATIONCHARGES BETWEEN PL T AND REPAIRERS UNIT. JOBINCLUDES CUTTING AND REMOVING FOOT RING AND VPRINGS, AND WELDING NEW FOOT RING AND VP RING, ASPER SPE FICATION. THE RATE TO EXCLUDE SUPPLY OFCONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIREFOR METALIZING, PRIMER, PAINT (FOR CYLIND ANDSTENCILING) AND TEFLON TAPE FOR VALVE FIXING. | - | Each |
| 5 | HOT REPAIR OF 5 KG | HOT REPAIR OF 5 KG — T REPAIR OF 5 KG CYLINDER: HEAT TREATMENT,HYDRO TESTING, SHOT BLASTING, METALISING,CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AN PAINTING, VALVE FIXING, PNEUMATIC TESTING,MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETYMESSAGE ETC, CYLINDER RECONDITIONING NFIRMINGTO IS 13258-1991. THE TOTAL SCOPE OF WORKSINVOLVED IS STENCILING OF "MESSAGE FOR DOMESTICUSE ONLY" TO BE ADDED TO EXIS NG MESSAGES LIKE"SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILED INANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOT RINGAND MARKINGS PER SPECIFICATION GIVEN IN THEATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BEQUOTED BY CONSIDERING THE SCRAP VALUE OF FOOTRING. HIS INCLUDES CUTTING OF EXISTING FOOT RINGAND WELDING OF NEW FOOT RING ON LPG CYLINDERS INSUCH A MANNER SO THAT CYLINDERS CANNOT E DAMAGEDDUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OFNEW VP RING AND STAY PLATES. PUNCHING OF MARKINGSAS PER SPECIFICATION IVEN IN THE ATTACHMENT FORLPG CYLINDERS. RATES SHOULD BE QUOTED BYCONSIDERING THE SCRAP VALUE OF VP RING. THISINCLUDES CUTTING F EXISTING VP RING AND STAYPLATES AND WELDING OF NEW VP RING AND STAY PLATEON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERSCANN BE DAMAGED DUE TO POOR WORKMANSHIP. | - | Each |
| 6 | HOT REPAIR OF 2 KG | HOT REPAIR OF 2 KG — T REPAIR OF 2 KG CYLINDER: HEAT TREATMENT,HYDRO TESTING, SHOT BLASTING, METALISING,CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AN PAINTING, VALVE FIXING, PNEUMATIC TESTING,MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETYMESSAGE ETC, CYLINDER RECONDITIONING NFIRMINGTO IS 13258-1991. THE TOTAL SCOPE OF WORKSINVOLVED IS STENCILING OF "MESSAGE FOR DOMESTICUSE ONLY" TO BE ADDED TO EXIS NG MESSAGES LIKE"SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILEDIN ANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOTRING AND MARKINGS PER SPECIFICATION GIVEN INTHE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BEQUOTED BY CONSIDERING THE SCRAP VALUE OF FOOTRING. HIS INCLUDES CUTTING OF EXISTING FOOT RINGAND WELDING OF NEW FOOT RING ON LPG CYLINDERS INSUCH A MANNER SO THAT CYLINDERS CANNOT E DAMAGEDDUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OFNEW VP RING AND STAY PLATES. PUNCHING OF MARKINGSAS PER SPECIFICATION IVEN IN THE ATTACHMENT FORLPG CYLINDERS. RATES SHOULD BE QUOTED BYCONSIDERING THE SCRAP VALUE OF VP RING. THISINCLUDES CUTTING F EXISTING VP RING AND STAYPLATES AND WELDING OF NEW VP RING AND STAY PLATEON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERSCANN BE DAMAGED DUE TO POOR WORKMANSHIP. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400016233-HC-07370.pdf
TENDER_DOCUMENT • 10.88 MB
Download all tender documents and submit your bid