Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
17 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer Rnb division Leh
Upgradation / Construction of School building at PS Skara yokma ( Under SSA )
2026_PWD_19693_1
E Tender 84 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
90 days
LEH
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,330
Office of the Executive Engineer Rnb division Leh
₹2.7 L
8 Oct 2026
8 Oct 2026
19 Oct 2026
8 Oct 2026
17 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of
steel bars and disposal of unserviceable material within 50 metres lead as per
direction of Engineer - in- charge. | 2.83 | cum | 2,440.73 | ₹6,907.27 |
| - | Demolishing brick work manually/ by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge. In cement mortar | 26.91 | cum | 1,414.18 | ₹38,055.58 |
| - | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 46.42 | cum | 445.85 | ₹20,696.36 |
| - | Hard rock (blasting prohibited) | 19.89 | cum | 2,012.46 | ₹40,027.83 |
| - | Dry Stone soiling ( any thickness ) on level including cost of stone | 8.06 | cum | 1,366.1 | ₹11,010.77 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 15.97 | cum | 6,606.08 | ₹1,05,499.1 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 208.67 | cum | 11,551.66 | ₹24,10,484.89 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 17,737.24 | kg | 109.33 | ₹19,39,212.45 |
| - | Centering and shuttering including strutting, propping etc. and removal of form
work for :
Foundations, footings, bases for columns | 48.33 | sqm | 306.15 | ₹14,796.23 |
| - | Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc. | 32.34 | sqm | 635.44 | ₹20,550.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_46520.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .