| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Lower rate |
| 2 | L2₹1.7 Cr+₹30.6 L (22.6%)Rejected-Finance 0 NGG POWER TECH INDIA PRIVATE LIMITED VILLAGE JHOLAN MAJRA PO POLIAN BEET TEHSIL HAROLI UNA HIMACHAL PRADESH 174503 UDYAM HP 12 0000141 02AAFCN4843C1ZX B M R MII STATUS AS VERIFIED | UNA | HIMACHAL PRADESH | 174503 | ₹1.7 Cr+₹30.6 L (22.6%) | L2 | Rejected-Finance Higher Bid |
| 3 | Rejected-Technical VILLAGE KARU KALAN PO KATHOG TEHSIL JWALAMUKHI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | - | - | Rejected-Technical Document not found in order |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
24 Jul 2024, 11:00 amClosed
O/o CE Operation M. Zone HPSEBL Mandi.
O/o CE Operation M. Zone HPSEBL Mandi.
Tender for Repair, testing and safe delivery of 3-phase, Aluminum Wound Dtr. of capacity 63KVA and 100kVA with voltage ratio 11/0.433 KV of various makes lying damaged at MnT workshops of HPSEBL at Sunder Nagar,Una, Kangra, Hamirpur and Solan.
2024_HPSEB_90021_1
HPSEBL/CEOMZ/MM/NIT-1/2024-25
Open Tender
Electrical Works
Tender cum Auction
240 days
sundernagar
Please refer NIT Documents
6 documents required · 6 mandatory
₹2,360
₹1.5 L
Yes
21 Feb 2025
3 Jul 2024
26 Jul 2024
3 Jul 2024
24 Jul 2024
3 Jul 2024
Amount
Description
Dismantling and inspection of 100 KVA DTR at M&T workshop Yard (Aluminium Wound) including extraction of old transformer oil, dismantling of main tank cover, extraction of Core and winding, dismantling of HV&LV windings, bushings etc. inspection of core and re-assembling of core and Tank at M&T workshop Yard.
Dismantling and inspection of 63 KVA DTR at M&T workshop Yard (Aluminium Wound) including extraction of old transformer oil, dismantling of main tank cover, extraction of Core and winding, dismantling of HV&LV windings, bushings etc. inspection of core and re-assembling of core and Tank at M&T workshop Yard.
Repair of 100 KVA Transformer at contractors workshop including all material & T&P and guarantee up to Two (2) years complete in all respect.
Supply of material as required for repair of damged 100 KVA DTR as per the following:
HT Leg Coils with DPC Wire/SE wire
LT Leg Coils with DPC Strip
Transformer Oil including filtration/ centrifuging.
Other petty items such as gasket sheet, elephantite sheet, leatherized insulating paper, thinner, pure tin, srb tube, cotton tape, craft paper, empire sleeves, washers etc
Grey paint
HT Bushings (3 nos.), complete including metal part
LT Bushings (4 nos.), complete incuding metal part
Oil Level Gauge complete
Oil Drain Filter valve
Air Release Plug
Set of Bimetallic Connectors
Plain Breather
Labour Charges for repair and testing of 100 KVA DTR including dismantling of main tank cover, extraction and cleaning of core,cleaning of DTR Tank, re-assembly of core, HV and LV coil winding, assembly of complete core and winding,leads, tank cover, bushing etc. complete in all respect i/c machinery and equipment charges.
Carriage charges of damaged /repaired 100 KVA DTR (2 X 120 KM i.e to & fro distance X 100 DTRs =24000)
Loading and Unloading charges of damaged 100 KVA DTR through hydra/crane(loading at M&T workshop and unloading at Contractor's workshop and vice a versa after repair i.e. Loading at contractor's workshop and unloading at M&T workshop)
Repair of 63 KVA Transformer at contractors workshop including all material & T&P and guarantee up to Two (2) years complete in all respect.
Supply of material as required for repair of damged 63 KVA DTR as per the following:
HT Leg Coils with DPC Wire/SE wire
LT Leg Coils with DPC Strip
Transformer Oil including filtration/ centrifuging.
Other petty items such as gasket sheet, elephantite sheet, leatherized insulating paper, thinner, pure tin, srb tube, cotton tape, craft paper, empire sleeves, washers etc
Grey paint
HT Bushings (3 nos.), complete including metal part
LT Bushings (4 nos.), complete incuding metal part
Oil Level Gauge complete
Oil Drain Filter valve
Air Release Plug
Set of Bimetallic Connectors
Plain Breather
Labour Charges for repair and testing of 63 KVA DTR including dismantling of main tank cover, extraction and cleaning of core,cleaning of DTR Tank, re-assembly of core, HV and LV coil winding, assembly of complete core and winding,leads, tank cover, bushing etc. complete in all respect i/c machinery and equipment charges.
Carriage charges of damaged /repaired 63 KVA DTR (2 X 120 KM i.e to & fro distance X 100 DTRs =24000)
Loading and Unloading charges of damaged 63 KVA DTR through hydra/crane(loading at M&T workshop and unloading at Contractor's workshop and vice a versa after repair i.e. Loading at contractor's workshop and unloading at M&T workshop)
Bidder Name
Amount in Words
NGG Power Tech India private Limited (BID ID -425964)
J.P ELECTRICAL INDUSTRIES (BID ID -425483)
NGG Power Tech India private Limited (BID ID -425964)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .