Tender ID
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
13 Mar 2026, 6:00 pmClosed
Executive Engineer, SBC Dn. 2/1, Dhrangadhra
Maintanance and repairing work of Distributories MD-1 to MD-5 and its minors of Maliya branch canal for year 2026-27
279412
08/2025-26
Open
Civil Works - Canal
Works
Surendranagar
7 documents required · 7 mandatory
₹4,248
Yes
Executive Engineer, S B C Dn No 2/1-Dhrangadhra
₹1.7 L
Yes
21 Feb 2026
21 Feb 2026
21 Feb 2026
13 Mar 2026
21 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 KW with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Work :-Maintanance and repairing work of Distributories
MD-1 to MD-5 and it's minors of Maliya branch canal for year 2026-27.
No. Description of Item Qty. Unit Rate in Rs. Amount in Rs.
Jungle Clearance of Specified category and
bushes for canal/dam work as directed with
depositing material etc complete (excluding
1 tree of girth above 0.5 mt)
(B) more than 2 year old (c) For heavy
Clearing the silt from canal /drain bed by
digging the same to the required bed level and
gradient including depositing the excavated
earth regularly on spoil bank for 1 utilizing the
2 same for preparing the bund after bracking the
clods as and where directed for lead upto
mt and lift as under.(Excluding weed cutting)
( A ) Depth 0.00 to 3.00 mt.
Dismantalling the C.C.lining including
disposing off the dismentalled materials as
3 directed etc. complete. 24423.77 Sqmt 87.00
(a)7.5 cm thick
Providing and Laying HDPE Geomembrane in
bed and slopes of canal at required level below
lining as per drawing and as directed etc.
(a) 200microna) Type-I For smooth
Providing and fixing welded wiremesh 1.8 mm
x 65mm x 65 mm with 30 gsm galvanized
5 coating confirming to IS 280 -2006 as per
Providing and Laying in position Nominal Mix
Plain/Reinforced Cement Concrete Lining of
1:2:4 using cement, sand and crushed
aggregate in Bed, Side Slopes and Curvature
including batching, mixing, transporting,
placing, vibrating, smooth finishing,
membrane curing (By Curing Compound Only)
6 as directed with all lead & lift etc. complete 24423.77 Sqmt 372.43
including dressing the bed and trimming the
canal section and minor filling with murrum /
earth as per site condition to correct profile
incl. providing bitumen joints at specified
interval. (Without Using Paver Machineries &
without sleepers) For 7.50 cm thick canal
lining in Bed / Slope
..................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
In words In words
(B) ForItemRateTender (ForaboveINR50Cr.):
Item Description of Quantity Unit Rate Amount
No Item(with brief
specification and In In
reference to book of figures Words
specifications)
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)
(C)Net Tendered Amount (A-B) (in
1 The Contractor shall exhibit aboard with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1 % of the workdone.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer,
Quality Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is
a change as per Nominal mix the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for
OPC) mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
MD 1 to 5 R2_DTP_Package-5_19.02.26.pdf
BOQ 1 to 5.pdf
TENDER NOTICE distryminor.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .