Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹137.6 CrAccepted-AOC | ₹137.6 Cr | L1 | Accepted-AOC being L1 |
| 2 | L2₹165.0 CrRejected-Finance | ₹165.0 Cr | L2 | Rejected-Finance Being not L1 |
| 3 | L3₹168.3 CrRejected-Finance BU S S F S FLATS NEAR INCOME TAX COLONY OUTER RING ROAD PITAMPURA DELHI 110034 | DELHI | NORTH WEST DELHI | DELHI | 110034 | ₹168.3 Cr | L3 | Rejected-Finance Being not L1 |
| 4 | L4₹176.8 CrRejected-Finance | ₹176.8 Cr | L4 | Rejected-Finance Being not L1 |
| 5 | L5₹181.6 CrRejected-Finance | ₹181.6 Cr | L5 | Rejected-Finance Being not L1 |
Tender Value
₹212.3 Cr
EMD Value
₹2.1 Cr
Closing Date
1 May 2023, 5:00 pmClosed
Chief Engineer Project Swastik
Chief Engineer Project Swastik, C/O 99 APO, Pin 931717, Upper Burtuk, Gangtok Sikkim
Construction improvement of road Singtham Dikchu from Cl 9 to NHDL specifications through EPC mode
2023_BRO_583169_1
80444R/S-D/EPC
Open Tender
Civil Works - Roads
731 days
Between km 10.00 to km 32.700
As per RFP
2 documents required · 2 mandatory
₹30,000
Chief Engineer Project Swastik
₹2.1 Cr
O/o Chief Engineer Project Swastik
14 Nov 2023
27 Feb 2023
2 May 2023
27 Feb 2023
1 May 2023
29 Mar 2023
27 Feb 2023 - 24 Mar 2023
24 Mar 2023
Amount
CONSTRUCTION/IMPROVEMENT OF ROAD SINGTHAM-DIKCHU FROM CL-9 TO NHDL SPECIFICATIONS THROUGH EPC MODE BETWEEN KM 10.00 (KM 0.00) TO KM 32.700 (EXISTING) (KM 32.110 PROPOSED) NET DESIGN LENGTH-22.110 KM) UNDER 87 RCC/764 BRTF UNDER PROJECT SWASTIK IN SIKKIM STATE.
BHAVYA CONSTRUCTION
KCC Buildcon Private Limited
M/s Vinod Kumar Jain
HES INFRA PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid