Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance OFFICE FLOOR ASHOKA PAVILLION A OPP KAPADIA HEALTH CLUB NEW CIVIL ROAD NEW CIVIL ROAD SURAT GUJARAT 395001 | SURAT | GUJARAT | 395001 | +3.00% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹17.5 L (4.61%)Admitted-Finance | +7.75% | ₹4.0 Cr+₹17.5 L (4.61%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
5 Jun 2026, 6:00 pmClosed
Office of the Executive Engineer PW(RnB) North Kmr
Office of the Ex. Eng. PW(RnB) Mech Div. North Kmr
Detailed Design, Drawing, Construction, Supply, Installation, Testing and Commissioning of 230 KLD Sewage Treatment Plant (STP) based on MBR Technology to be Installed at Transit Accommodation Fatehpora, Baramulla on Turnkey Basis
2026_PWDJK_310694_1
RnB/MDNK/2026-27/NIT/05
Open Tender
Solid Waste Management
Percentage
180 days
Baramulla
Detailed Design, Drawing, Construction, Supply, Installation, Testing and Commissioning of 230 KLD STP based on MBR Technology to be Installed at Transit Accommodation Fatehpora, Baramulla on Turnkey Basis.
15 documents required · 15 mandatory
₹5,500
Ex Engg. PWD (RnB) Mech. Div. North Kmr
₹7.4 L
Office of the Ex. Eng. PW(RnB) Mech Div. North Kmr
4 Aug 2026
22 May 2026
6 Jun 2026
22 May 2026
5 Jun 2026
29 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) based on MBR Technology as per the NIT for Transit Accommodation Fatehpora, Baramulla on Turnkey Basis with total sewage handling capacity of 230 KLD. STP shall include necessary chemical dosing as required by the manufacture’s design. Additionally, provision for optimum heating / thermal insulation (as per requirement) of the sewage water during winter to ensure that the STP remains operational at ambient temperatures as low as -10℃ shall be in the scope of the firm. | - | Job | 2,72,00,000 | - |
| 2Provision of Operation & Comprehensive Maintenance (O&M) of the STP Plant: | |||||
| 2.1 | Operation of the plant during 1st year of DLP as per NIT conditions. | - | Job | 13,03,000 | - |
| 2.2 | Operation of the plant during 2nd year of DLP as per NIT conditions. | - | Job | 15,64,000 | - |
| 2.3 | Operation and Comprehensive Maintenance of the plant for the 3rd year after successful testing and Commissioning of the plant as per the NIT conditions. | - | Job | 18,77,000 | - |
| 2.4 | Operation and Comprehensive Maintenance of the plant for the 4th year after successful testing and Commissioning of the plant as per the NIT conditions. | - | Job | 22,52,000 | - |
| 2.5 | Operation and Comprehensive Maintenance of the plant for the 5th year after successful testing and Commissioning of the plant as per the NIT conditions. | - | Job | 27,04,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1004920.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .