| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹73.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹79.1 L+₹6.0 L (8.26%)Rejected-AOC NAMBIYATH NAMBIYATH POMBRA 678595 | PALAKKAD | KERALA | 678595 | 2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | saleem L2 | HAMZA K K L1 | karthikeyan L3 |
|---|---|---|---|---|---|---|
| 1.00FIRST FLOOR CONSTRUCTION | ||||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4.08 | cum | 2,319.1 ₹9,461.93 | 2,169.95 ₹8,853.4 | 250 ₹1,020 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 184.64 | sqm | 929.28 ₹1,71,578.54 | 869.51 ₹1,60,542.85 Lowest | 1,000 ₹1,84,636 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 402.57 | sqm | 702.92 ₹2,82,977.32 | 657.71 ₹2,64,776.95 Lowest | 750 ₹3,01,930.5 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.65 | cum | 12,406.9 ₹1,56,922.47 | 11,011.41 ₹1,39,272.31 Lowest | 12,500 ₹1,58,100 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 36.58 | sqm | 773.61 ₹28,295.56 | 723.85 ₹26,475.54 Lowest | 825 ₹30,175.2 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 364.12 | sqm | 885.69 ₹3,22,501.87 | 828.72 ₹3,01,757.67 Lowest | 950 ₹3,45,918.75 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 35.99 | sqm | 759.98 ₹27,354.72 | 711.1 ₹25,595.33 Lowest | 820 ₹29,515.08 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 119.11 | cum | 13,057.69 ₹15,55,275.34 | 11,589.01 ₹13,80,343.8 Lowest | 13,100 ₹15,60,314.8 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 15,810.72 | kilogram | 103.59 ₹16,37,832.48 | 96.93 ₹15,32,533.09 Lowest | 105 ₹16,60,125.6 |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
29 Oct 2025, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER OFFICE DISTRICT PANCHAYATH PALAKKAD
DP-PKD-2024-25-FIRST FLOOR CONSTRUCTION OF BUILDING AT DIST AYURVEDHA HOSPITAL PALAKKAD
2025_LSGD_813245_32
08/AEE/2025-26 DT 21.10.2025
Open Tender
Civil Works - Buildings
Item Rate
300 days
DISTRICT PANCHAYATH PALAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
13 Oct 2026
23 Oct 2025
31 Oct 2025
23 Oct 2025
29 Oct 2025
23 Oct 2025
Work Name:Annual Plan-DP-PKD-2024-25-FIRST FLOOR CONSTRUCTION OF BUILDING AT DIST AYURVEDHA HOSPITAL PALAKKAD. - DP-PKD-2024-25-FIRST FLOOR CONSTRUCTION OF BUILDING AT DIST AYURVEDHA HOSPITAL PALAKKAD.-General Civil Work
畴敲琠楧敶愠癥湥猠慨敤吺潷漠潭敲挠慯獴漠敮⁷潷歲⸳㌴ㄮ䄺灰祬湩湯潣瑡漠慷整桴湩慮汢散敭瑮瀠楲敭景愠灰潲敶牢湡湡慭畮慦瑣牵湯眠污畳晲捡㩥慗整桴湩慮汢散敭瑮瀠楲敭칲㌱㐮⸶㨱楆楮桳湩慷汬楷桴䄠牣汹捩匠潭瑯硥整楲牯瀠楡瑮漠敲畱物摥猠慨敤为睥眠牯吨潷漠潭敲挠慯⁴灡汰敩⁀⸱㜶氠牴ㄯ‰煳癯牥愠摮椠据畬楤杮瀠楲業杮挠慯⁴景攠瑸牥潩牰浩牥愠灰楬摥䀠㈠㈮‰杫ㄯ‰煳⥭Ĵ㔀⸰㠱㜮㐮㈮债潲楶楤杮愠摮映硩湩噐ⱃ瀠灩獥映瑩楴杮湩汣摵湩楦楸杮琠敨瀠灩楷桴挠慬灭瑡ㄠ〮‰灳捡湩琠楨湩汣摵獥樠楯瑮湩景瀠灩獥☠映瑩楴杮楷桴漠敮猠整⁰噐⁃潳癬湥⁴散敭瑮愠摮琠獥楴杮漠潪湩獴挠浯汰瑥獡瀠牥搠物捥楴湯漠湅楧敮牥椭桃牡敧㌠′浭搠慩㘠䬠晧振㉭ⴠ椠瑮牥慮潷歲硅潰敳湯眠污㙬〵ㄮ⸸⸹㔱㈮债潲楶楤杮愠摮映硩湩噐⁃楰数ⱳ映瑩楴杮湩汣摵湩楦楸杮琠敨瀠灩楷桴挠慬灭瑡ㄠ〮‰灳捡湩吠楨湩汣摵獥樠楯瑮湩景瀠灩獥☠映瑩楴杮楷桴漠敮猠整⁰噐⁃潳癬湥⁴散敭瑮愠摮琠獥楴杮漠潪湩獴挠浯汰瑥獡瀠牥搠物捥楴湯漠湅楧敮牥椭桃牡敧㐠‰浭搠慩㘠䬠晧振㉭ⴠ䔠瑸牥慮潷歲ⴠ䔠灸獯摥漠慷汬Ķ㔀⸰㠱㜮㈮㈮债潲楶楤杮愠摮映硩湩噐⁃楰数ⱳ映瑩楴杮湩汣摵湩楦楸杮琠敨瀠灩楷桴挠慬灭瑡ㄠ〮‰灳捡湩吠楨湩汣摵獥樠楯瑮湩景瀠灩獥☠映瑩楴杮楷桴漠敮猠整⁰噐⁃潳癬湥⁴散敭瑮愠摮琠獥楴杮漠潪湩獴挠浯汰瑥獡瀠牥搠物捥楴湯漠湅楧敮牥ⴠ湩䌭慨杲〲洠楤〱䬠晧振㉭湉整湲污眠牯硅潰敳湯眠污靬ㄱ㌮㨸牐癯摩湩湡慬楹杮䌠牥浡捩朠慬敺汦潯楴敬景猠穩〳砰〳‰浭⠠桴捩湫獥潴戠灳捥晩敩祢琠敨洠湡晵捡畴敲⥲景䤠瑳焠慵楬祴挠湯潦浲湩潴䤠⁓›㔱㈶ⰲ漠灡牰癯摥洠歡ⱥ椠污潣潬牵ⱳ猠慨敤ⱳ攠捸灥⁴桗瑩ⱥ䤠潶祲片祥畆敭删摥䈠潲湷慬摩漠〲洠桴捩敢景挠浥湥⁴潭瑲牡ㄠ㐺⠠ㄠ挠浥湥⁴›‴潃牡敳猠湡⥤湩汣摵湩潰湩楴杮琠敨樠楯瑮楷桴眠楨整挠浥湥⁴湡慭捴楨杮瀠杩敭瑮瑥潣灭敬整霮ㄱ㐮⸱㨲牐癯摩湩湡慬楹杮瘠瑩楲楦摥映潬牯琠汩獥椠楤晦牥湥⁴楳敺琨楨正敮獳琠敢猠数楣楦摥戠⁹桴慭畮慦瑣牵牥 楷桴眠瑡牥愠獢牯瑰潩敬獳琠慨⸰㠰‥湡潣普牯業杮琠卉㨠ㄠ㘵㈲景愠灰潲敶慭敫湩愠汬挠汯畯獲愠摮猠慨敤ⱳ氠楡湯㈠‰浭琠楨正挠浥湥⁴潭瑲牡ㄠ㐺ㄨ挠浥湥⁴›‴潣牡敳猠湡⥤湩汣摵湩牧畯楴杮琠敨樠楯瑮楷桴眠楨整挠浥湥⁴湡慭捴楨杮瀠杩敭瑮瑥潣灭敬整匮穩景吠汩〶‰⁸〶‰浭༮㠱㐮㨸牐癯摩湩湡汰捡湩湯琠牥慲散⠠瑡愠汬映潬牯氠癥汥⥳瀠汯敹桴汹湥慷整瑳牯条慴歮㨠卉⁉㈱〷‱慭歲摥楷桴挠癯牥愠摮猠極慴汢潬正湩牡慲杮浥湥⁴湡慭楫杮渠捥獥慳祲栠汯獥映牯椠汮瑥畯汴瑥愠摮漠敶晲潬⁷楰数畢⁴楷桴畯⁴楦瑴湩獧愠摮琠敨戠獡畳灰牯⁴潦慴歮Ԯ楌牴䁥㜱㜮㌮债潲楶楤杮愠摮映硩湩慷桳戠獡湩眠瑩⹃⹉戠慲正瑥ⱳㄠ‵浭䌠倮牢獡楰汬牡琠灡ⱳ㌠′浭䌠倮牢獡慷瑳景猠慴摮牡慰瑴牥Ɱ椠据畬楤杮瀠楡瑮湩景映瑩楴杮湡牢捡敫獴畣瑴湩湡慭楫杮朠潯桴慷汬桷牥癥牥爠煥極敲场楨整嘠瑩敲畯桃湩慗桳戠獡湩猠穩㔵砰〴‰浭眠瑩慰物漠㔱洠⹃⹐戠慲獳瀠汩慬慴獰攀捡靨〱㈮㨸牐癯摩湩湡楦楸杮猠慴湩敬獳猠整汥⠠片摡〳⤴爠楡楬杮洠摡景䠠汯潬⁷畴敢ⱳ挠慨湮汥ⱳ瀠慬整瑥湩汣摵湩敷摬湩Ⱨ朠楲摮湩Ⱨ戠晵楦杮潰楬桳湩湡慭楫杮挠牵慶畴敲⠠桷牥癥牥爠煥極敲⥤愠摮映瑩楴杮琠敨猠浡楷桴渠捥獥慳祲猠慴湩敬獳猠整汥渠瑵湡潢瑬潣灭敬整⽩楦楸杮琠敨爠楡楬杮眠瑩敮散獳牡⁹捡散獳牯敩…瑳楡汮獥瑳敥慤桳映獡整敮獲瑳楡汮獥瑳敥潢瑬瑥景爠煥極敲楳敺漠桴潴⁰景琠敨映潬牯漠桴楳敤漠慷獩⁴汳扡眠瑩畳瑩扡敬愠牲湡敧敭瑮愠数灡牰癯污漠湅楧敮牥椭档牡敧昨牯瀠祡敭瑮瀠牵潰敳漠汮⁹敷杩瑨漠瑳楡汮獥瑳敥敭扭牥桳污敢挠湯楳敤敲硥汣摵湩楦楸杮愠捣獥潳楲獥猠捵獡渠瑵ⱳ戠汯獴慦瑳湥牥瑥됩㜱㈮ㄮ债潲楶楤杮愠摮映硩湩桷瑩楶牴潥獵挠楨慮瀠摥獥慴祴数眠瑡牥挠潬敳⁴䔨牵灯慥祴数圠䌮慰⥮眠瑩敳瑡愠摮氠摩〱氠瑩敲氠睯氠癥汥眠楨整倠嘮䌮汦獵楨杮挠獩整湲湩汣摵湩汦獵楰数楷桴洠湡慵汬⁹潣瑮潲汬摥搠癥捩栨湡汤敬敶⥲潣普牯業杮琠卉㨠㜠㌲ⰱ眠瑩污楦瑴湩獧愠摮映硩畴敲潣灭敬整湩汣摵湩畣瑴湩湡慭楫杮朠潯桴慷汬湡汦潯獲眠敨敲敶敲畱物摥场䌮慰楷桴䤠䥓洠牡敫桷瑩潳楬汰獡楴敳瑡愠摮氠摩Ú㔀⸰㠱㤮ㄮ⸰㨱牐癯摩湩湡楦楸杮倠䍖瀠灩獥椠据畬楤杮潪湩楴杮漠楰数楷桴漠敮猠整⁰癰潳癬湥⁴散敭瑮牴湥档湩敲楦汬湩…整瑳湩景樠楯瑮潣灭敬整愠数楤敲瑣潩景䔠杮湩敥湩䌠慨杲ㄠ〵洠楤‶杋⽦浣גּ⸸ㄳ债潲楶楤杮愠摮映硩湩獉⁴畱污瑩⁹散慲業汧穡摥眠污楴敬潣普牯業杮琠卉›㔱㈶′琨楨正敮獳琠敢猠数楣楦摥戠⁹桴慭畮慦瑣牵牥Ⱙ漠灡牰癯摥洠歡ⱥ椠污潣潬牵ⱳ猠慨敤硥散瑰戠牵畧摮ⱹ戠瑯汴牧敥Ɱ戠慬正漠湡⁹楳敺愠灡牰癯摥戠⁹湅楧敮牥椭䌠慨杲ⱥ椠歳物楴杮楲敳獲漠瑳灥湡慤潤ⱳ漠敶㈱洠桴捩敢景挠浥湥⁴潭瑲牡ㄠ㌺⠠‱散敭瑮㨠㌠挠慯獲慳摮 湡潪湩楴杮眠瑩牧祥挠浥湥⁴汳牵祲䀠㌠㌮杫瀠牥猠浱湩汣摵湩潰湩楴杮椠桷瑩散敭瑮洠硩摥眠瑩楰浧湥⁴景洠瑡档湩桳摡潣灭敬整ꨮ〵ㄮ⸷⸱㨴畓灰祬湩湡楦楸杮䌠⁐效污桴映畡散⁴潧摯焠慵楬祴椠据畬楤杮挠獯⁴景洠瑡牥慩獬愠摮氠扡畯档牡敧瑥挠浯汰瑥獡瀠牥琠敨搠物捥楴湯漠楳整攠杮湩敥湩挭慨杲渀㡯〵ㄮ⸸⸷⸳㨱牐癯摩湩湡楦楸杮倠䍖瀠灩獥楦瑴湩獧椠据畬楤杮映硩湩桴楰数眠瑩汣浡獰愠⁴⸱〰洠猠慰楣杮桔獩椠据畬敤潪湩楴杮漠楰数…楦瑴湩獧眠瑩湯瑳灥倠䍖猠汯敶瑮挠浥湥⁴湡整瑳湩景樠楯瑮潣灭敬整愠数楤敲瑣潩景䔠杮湩敥椠䌠慨杲㔲洠楤㈱䬠晧振㉭ⴠ䤠瑮牥慮潷歲ⴠ䔠灸獯摥漠慷汬㔀⸰㠱㤮㈮⸲㨳牐癯摩湩湡楦楸杮倠䍖洠畯摬摥映瑩楴杮⽳愠捣獥潳楲獥映牯删杩摩倠䍖瀠灩獥湩汣摵湩潪湩楴杮眠瑩噐⁃潳癬湥⁴散敭瑮ㄭ〱洠楤潄牯䔠扬睯㔀⸰㠱㤮㈮⸲㨴牐癯摩湩湡楦楸杮倠䍖洠畯摬摥映瑩楴杮⽳愠捣獥潳楲獥映牯删杩摩倠䍖瀠灩獥湩汣摵湩潪湩楴杮眠瑩噐⁃潳癬湥⁴散敭瑮ㄱ‰浭搠慩䈠湥饤〵ㄮ⸸⸹㈲㠮债潲楶楤杮愠摮映硩湩噐⁃潭汵敤楦瑴湩獧⼠捡散獳牯敩潦楒楧噐⁃楰数ⱳ椠据畬楤杮樠楯瑮湩楷桴倠䍖猠汯敶瑮挠浥湥⁴ㄭ〱洠楤敖瑮挠睯핬〵ㄮ⸸⸹⸴㨲牐癯摩湩湡楦楸杮倠䍖瀠灩獥椠据畬楤杮潪湩獴漠楰数楷桴漠敮猠整⁰噐⁃潳癬湥⁴散敭瑮牴湥档湩Ⱨ爠晥汩楬杮☠琠獥楴杮漠潪湩獴挠浯汰瑥獡瀠牥搠物捥楴湯漠湅楧敮牥椠桃牡敧㈳洠楤‶杋⽦浣
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1361150.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.04 MB
Tendernotice_4.pdf
PDF • 0.04 MB
Tendernotice_5.pdf
PDF • 0.06 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.55 MB
BOQ_1361150.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .