Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
13 Jul 2026, 2:00 pm4d left
S.E. B.S.C.C.C.-1, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Rain Water Harvesting Work in Irrigation Colony Govindpur, Prayagraj
2026_UPIDC_1166161_1
03/SE/2026-27
Open Tender
Civil Works
180 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.1 L
4 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- charge | 361.68 | Sqm | - | - |
| 2 | E/W in Excavation for boring Pit, recharge pit in ordinary soil lift up to 1.5 m and Lead up to 50 m. | 826.43 | Cum | - | - |
| 3 | P.C.C. work in 1:3:6 (cement:coarse sand: 20 mm to 40 mm Stone Agg.) including all cost of Material, labour,T&P etc. complete. | 52.79 | Cum | - | - |
| 4 | Class M-150 Brick work in 1:4 (cement:coarse sand) cement mortar including all cost of Material, labour,T&P etc. complete. | 59.76 | Cum | - | - |
| 5 | 12 mm thick cement plaster work in 1:3 (cement: coarse sand) cement mortar and finished coat 3 mm thick neat cement including all cost of Material, labour, T&P etc. complete. | 382.24 | Sqm | - | - |
| 6 | Cetering and Shuttering for R.C.C. work including all cost of materials, labour etc. complete. | 87.96 | Sqm | - | - |
| 7 | R.C.C. work M-20 in 1:1.5:3 (cement:coarse sand: stone gritt) including all cost of Material, labour,T&P etc. complete. | 69.61 | Cum | - | - |
| 8 | Reinforcement Steel work including Cutting, bending, binding with steel wire and all cost of Material, labour,T&P etc. complete. | 1,094.84 | Kg | - | - |
| 9 | Supplying and Laying 40 mm size Brick Ballast for filter including all cost of Material, labour, T&P etc. complete. | 32.6 | Cum | - | - |
| 10 | Supplying and Laying M-150 Half Brick Soling including all cost of Material, labour,T&P etc. complete. | 22.5 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tender_Document_03-SE_2026_27_Lot_1.pdf
Tender Documents • 2.95 MB
BOQ_2187362.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid