Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.6 Cr+₹9.7 L (6.66%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.6 Cr+₹13.6 L (9.32%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.7 Cr+₹19.9 L (13.6%)Admitted-Finance A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | L4 | Admitted-Finance | ||
| 5 | L5₹1.7 Cr+₹23.4 L (16.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Civil Division-X
L. M. BUND OFFICE COMPLEX, KRISHNA KUNJ
Dry stone pitching on side slopes and restoration of banks from RD 350m to RD 1190m at Tehkhand drain.
2026_IFC_300562_1
EE/CD-X/2026-27/78
Open Tender
Civil Works
Works
270 days
Tehkhand Village
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹5.2 L
12 Nov 2026
27 Oct 2026
10 Nov 2026
27 Oct 2026
10 Nov 2026
27 Oct 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 10,400 | Cum | 264.53 | ₹27,51,112 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 15,600 | Sqm | 17.64 | ₹2,75,184 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 5,700 | Cum | 177.89 | ₹10,13,973 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 848 | Cum | 260.87 | ₹2,21,217.76 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. | 3,109 | Sqm | 393.01 | ₹12,21,868.09 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 325 | Cum | 6,826.92 | ₹22,18,749 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 1,163 | Cum | 7,895.75 | ₹91,82,757.25 |
| 8 | Supplying screened soil/RCA including royalty and carriage to the site of work with all lead &lift including loading, unloading and stacking at site complete or as per direction of Engineer In Charge. | 179 | Cum | 1,906.7 | ₹3,41,299.3 |
| 9 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with Stone aggregate 20 mm nominal size | 2,831 | Sqm | 175.38 | ₹4,96,500.78 |
| 10 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with Stone aggregate 40 mm nominal size | 2,831 | Sqm | 172.73 | ₹4,88,998.63 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
NIT78.pdf
Tender Documents • 0.92 MB
BOQ_401195.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .