| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC Work awarded, Agreement executed |
| 2 | L2₹8.8 LRejected-Finance | ₹8.8 L | L2 | Rejected-Finance Second Highest |
| 3 | L3₹9.0 LRejected-Finance | ₹9.0 L | L3 | Rejected-Finance Highest BID |
| Sl No | Description | Qty | Unit | ATHITHYA BUILDERS L1 | ASHRAF L2 | SUBODH PK L3 |
|---|---|---|---|---|---|---|
| 1.00Desilting Well and Leading Chanel | ||||||
| 1.00 | 100.54.5.10:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 18.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 52.78 | cum | 2,552.98 ₹1,34,753.94 Lowest | 2,842.81 ₹1,50,052.04 | 2,901 ₹1,53,123.48 |
| 1.00 | 100.54.5.11:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 19.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 79.17 | cum | 2,710.74 ₹2,14,622.84 Lowest | 3,018.47 ₹2,38,987.36 | 3,080 ₹2,43,859 |
| 1.00 | 100.54.5.12:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 21.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 79.17 | cum | 2,868.53 ₹2,27,115.86 Lowest | 3,194.18 ₹2,52,899.2 | 3,259 ₹2,58,031.33 |
| 1.00 | OD287211/2025-2026:Desilting Desilting Leading Chanel of Size 8.00*4.00*3.00 by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the Leading Chanel by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the leading Chenel , without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 48 | cum | 2,552.98 ₹1,22,543.04 Lowest | 2,842.81 ₹1,36,454.88 | 2,901 ₹1,39,248 |
| 2.00Construction of Temperory Bund | ||||||
| 2.00 | OD280893/2025-2026:Construction of temporary bund using earth filled cement bags including cutting of the earth, filling, conveying and placing in position, , Placing of polyethene sheets on the bund, placing bamboos poles at regular intervals, dismantling the sand/ earth filled cement bag from the foundation site of bund apron on both side, removing the sand/ earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost and labour chargers and hire for tools and plants etc., complete. | 10 | metre | 9,243.28 ₹92,432.8 Lowest | 10,292.61 ₹1,02,926.1 | 10,503 ₹1,05,030 |
Tender Value
₹9.0 L
EMD Value
₹22,485
Closing Date
17 Apr 2026, 3:00 pmClosed
Executive Engineer
PH DIVISION SULTHAN BATHERY
O M - Water Supply Schemes-DRW-2026-ARWSS to Krishnagiri Purakkady and Ambalavayal Villages - Desilting of the intake well and leading channel at RWPS Karapuzha-General Civil Work
2026_KWA_847422_2
WRD/KWA-CE(NR)/TR54/29748/2025
Open Tender
Civil Works - Water Works
Item Rate
Karappuzha Dam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,350
Yes
₹22,485
Yes
3 Jun 2026
7 Apr 2026
18 Apr 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Desilting Well and Leading Chanel | |||||
| 1.001 | 100.54.5.10:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 18.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | - | cum | - | - |
| 1.002 | 100.54.5.11:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 19.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 1 | cum | - | - |
| 1.003 | 100.54.5.12:Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 21.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 1 | cum | - | - |
| 1.004 | OD287211/2025-2026:Desilting Desilting Leading Chanel of Size 8.00*4.00*3.00 by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the Leading Chanel by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the leading Chenel , without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | - | cum | - | - |
| 2Construction of Temperory Bund | |||||
| 2.001 | OD280893/2025-2026:Construction of temporary bund using earth filled cement bags including cutting of the earth, filling, conveying and placing in position, , Placing of polyethene sheets on the bund, placing bamboos poles at regular intervals, dismantling the sand/ earth filled cement bag from the foundation site of bund apron on both side, removing the sand/ earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost and labour chargers and hire for tools and plants etc., complete. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1433629.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BIDDOC1.pdf
Tender Documents • 0.86 MB
Integritypact.pdf
Additional Documents • 0.23 MB
Affidavit.pdf
Additional Documents • 0.24 MB
BOQ_1433629.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].