Loading…
Loading…
Tender Value
₹96.9 L
EMD Value
₹1.9 L
Closing Date
3 Jul 2026, 3:00 pm
Provision of 07 Nos. Electronic In-Motion Weighbridges(EIMWBs) over Chakradharpur Division.
ST-CKP-OT-26-27-38
ST-CKP-OT-26-27-38
Open
15 Months
Mayurbhanj, Odisha
₹0
₹1.9 L
11 Jun 2026
11 Jun 2026
19 Jun 2026
B-Material Supply-SOR (Telecom) 1045423.00 Below/P
D-Material Supply-SOR (Signalling) 121739.00 Below/P
B1-Material Supply-Non-SOR (Telecom) 1678086.93 Below/P
C1-Execution-Non-SOR (Signalling) 36105.00 Below/P
C2-Execution-EI Alteration Work (Signalling) 3656562.00 Below/P
Item Breakup - A-Execution-SOR (Telecom)
Excavation of trench in all kinds of soils Kilometre including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (a) Depth 1.2 meter, Width 0.5 meter. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Excavation of trenches including clearing of Metre roots of trees etc. in hard/rocky soil by chiselling up to a depth of 0.5 meter to 0.8 meter and width 0.3 meter at the bottom. Supply & placing split RCC pipes with collar (for jointing pipes) of 100 mm nominal diameter to Spec. No. IS: 10262-2019 or latest and IS-456-2000 as per SEM Drawing No. 15- D3 (Sheet-2) on sieved soil of 30 mm over cable and concreting(1:2:3) throughout the length upto a layer of 75mm approximately, then back filling the trench by digging and carrying earth from a distance of maximum 30 meters and then ramming of soil after cable laying. This also includes supply of collar and all the materials for concreting by the contractor.
Laying of S&T Cables (Signal/Quad/Power) in Kilometre the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Transportation including loading/unloading of Kilometre Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports.
Transportation of cables in rolls with or Drum-Km without wooden drums (S and T Cables) from concerned store to the site of works. Note: The unit Drum-KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Horizontal Drilling by using manual pushing Metre method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe.
HDD: In case of short stretches (less than 100 Metre m in single stretch). Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site in-charge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (a) 1 HDPE pipe. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Full Apparatus Case with earth Numbers excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%.
Execution of Straight joint on Quad cable/ jelly Numbers filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF-4). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released.
Supply, transportation and fixing of Galvanised Metre Iron Pipe (make: TATA/Jindal or better) with threaded collars (for jointing pipe) of 80 mm nominal bore Specification No. IS: 1239, Pt-1, 2004 thickness 3.2 mm medium grade, on bridges, culverts, drain or at places as per instruction of the site Engineer including supply and transportation of materials required for fixing the pipe as per SEM Drawing No.15-D7 on culverts and others including drawing of cables inside the pipe with masonry work at bridge entry and exit of the culvert and curing for 72 hours and pipes are to be clamped at max. 2 meter apart with drilling of holes on the pipe at 10 cm apart for S&T Cables. Note:- This also includes dismantling of released GI Pipe/Trough and released material should be returned at concerned store. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Installation, splicing and commissioning of Numbers Fibre Distribution Management System (FDMS) for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor.
Installation, splicing and commissioning of Numbers Fibre Distribution Management system (FDMS) for 12 Fiber complete with all accessories with patch cord & pigtail as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor.
Splicing of Optical Fiber Core and routing in CORE joint closure/FDMS as per instruction of site Engineer-in-charge.
Transportation and fixing of PVC Conduit Metre pipe/channel/casing caping on wall or structure with drawls of Telecom/Power/Data cable with proper finishing. This includes supply of fixing materials including flexible pipe/bend etc. as required during course of execution.
Transportation and fixing of following types of Numbers C.T. Box (Aluminium/Wago type) and termination of cable as per details of jointing schedule approved by the Railway Engineers. (a) 20 pair C.T. Box/Krone type DP Box.
Excavation of earth pit, placing & fixing of Numbers Earth electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties /relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway. Total 1673763.00
Item Breakup - B-Material Supply-SOR (Telecom)
Supply of 9U Rack with 19 inch standard Numbers dimension, wall mounting, front glass door with lock and two key, with rack fixing Multi point AC power strip, cable organiser with wall fixing screws. Make: CP Plus, D-Link, or better. (Inspection by representative of Sr. DSTE/CKP)
Supply, transportation and fixing of RCC Cable Numbers Route Marker as per Drawing SEM drawing No. 15-D1. (Inspection by representative of Sr. DSTE/CKP)
Supply of Thermo-shrink jointing (RTSF-4) kits Numbers for jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/condenser/Y- (Derivation)/Loading Coil/Transformer Joints as per Specification No. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest. (Inspection by RDSO) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of Fibre Distribution Management Numbers system (FDMS)/LIU for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. GR/FDM/01/02 April'2007 or latest. This includes supply of installation accessories as per technical specification. (Inspection by representative of Sr. DSTE/CKP)
Supply of 24 Fiber OFC Joint Closure as per Numbers Specification No. RDSO/SPN/TC/68/ 2014 Rev 1.0 or latest complete with all accessories including sealing with mechanical clamp facility. (Inspection by representative of Sr. DSTE/CKP)
Supply, transportation and installation of RCC Numbers joint chamber with two piece top cover and bottom cover with holes for drainage and cable entry, as per drawing No. RDSO/TCDO/COP-21 or latest. This includes trenching for jointing pit of size min 1.5 m X 1.5 m X 1.2m for all types of soils, back filling and ramming of the pit after placing the joint closure and cable loop in the chamber including dry sand upto 600mm height without causing any damage to same and consolidation of soil as well as disposal of excess soil. (Inspection by representative of Sr. DSTE/CKP)
Supply of HDPE pipe as per Specification No. Kilometre RDSO/SPN/TC/45/2013 Rev-2.0 or latest with OD/ID of size 40mm/33mm with suitable couplers, plugs, end caps, spacer, T band etc. as required during execution at the site. (Inspection by representative of Sr. DSTE/CKP)
Supply of Double walled corrugated ducts Metre (DWC) as per Specification No. RDSO/SPN/204/2011 Ver 1.1 Amd.1 or latest of diameter 120mm/103.5 mm (Outer/Inner Dia.) including supply of min. 1 coupler (end cap/spacer/T band etc.) as required during execution at the site for each 6 metre of length. (Inspection by representative of Sr. DSTE/CKP)
Supply of Steel Apparatus case Full height as Numbers per Drawing No. SK/Drg./OL/SER /198 or latest with E type lock . Etype lock & their key ward No. will be decided by site engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Supply of Hylam sheets is not covered under this scope. This includes supply of one key & handle for each four Apparatus Case or minimum one. (Inspection by representative of Sr. DSTE/CKP)
Supply of Fibre Distribution Management Numbers System (FDMS)/LIU for 12 Fiber complete with all accessories such as patch cord & pigtail as per TEC Spec. GR/FDM/01/02 April'2007 or latest. This includes supply of installation accessories as per technical specification. (Inspection by representative of Sr. DSTE/CKP)
Supply of PVC insulated 10 pair/0.5 mm Metre conductor dia. PVC Switch Board Cables as per TEC specification GR/WIR-06/03 of march 02 or latest. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of PVC insulated 3 Core 1.5 sq.mm Metre Single core Multi-strands Copper conductor with ISI marked conforming to IS:694/2010 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of UTP CAT - 6 cable, having bare Metre Copper Conductor of diameter 0.5 mm, Suitable for Gigabit Ethernet TEC Specification No. G/WIR 06/02 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of RJ-45 connector. Make: D-Link or Numbers better. (Inspection by representative of Sr. DSTE/CKP)
Supply of 20 Pair CT box made of 16 SWG CRC Numbers sheet with disconnection and reconnection (wago type). The CT Box should be grey colour powder coated with terminal, washer, nut & bolt should be of brass. There shall also be locking arrangement. (Inspection by representative of Sr. DSTE/CKP)
Supply of 25mm (1 inch) (PVC casing capping Metre in rectangular shape with separate Casing & Capping, double lock, heavy duty & ISI mark with IS:14927 or latest with minimum 1 mm thickness. (Inspection by representative of Sr. DSTE/CKP)
Supply of 25 mm (1 inch) PVC conduit pipe Metre rigid plain ended conduit size IS:9537 (part-3) or latest and 9537 (Part-1) 1980 with latest amendment ISI marked with minimum 1.2 mm wall thickness & minimum one socket at every 3 meter pipe. (Inspection by representative of Sr. DSTE/CKP)
Supply of 5m length LC to SC Single Mode Numbers Simplex/Duplex Fibre Optic Patch Cable. (Inspection by representative of Sr. DSTE/CKP)
Supply of 5m length SC to SC Single Mode Numbers Simplex/Duplex Fibre Optic Patch Cable. (Inspection by representative of Sr. DSTE/CKP)
Supply of Earth Electrode as per Drawing No. Set 19-D6 of SEM-2021 or latest. GI pipe confirming to IS:1239 or latest of 3.17 mm thickness, minimum 2.5 m long, 50.8 mm diameter, 4.76 mm diameter drilled holes staggered at distance of 152.4 mm. (Inspection by representative of Sr. DSTE/CKP)
Supply of 35 mm x 6 mm thick MS Flat Plate Metre Strip as per IS: 226-1975 or latest for earth connection to Signal post, L/Box etc. (Inspection by representative of Sr. DSTE/CKP)
Supply of Computer Table of size 1000 mm X Numbers 600 mm X 750 mm, Key Board pull out tray, drawer and top made of MDF. Model: C-13. Make: Godrej or better. (Inspection by representative of Sr. DSTE/CKP)
Supply of LAN/Network (RJ11 & RJ45) cable Numbers tester. Make-D-Link/PA 70025 or better. (Inspection by representative of Sr. DSTE/CKP)
Supply of Krone tool for inserting wire into Numbers insulation-displacement connectors. (Inspection by representative of Sr. DSTE/CKP) Total 1045423.00
Item Breakup - C-Execution-SOR (Signalling)
Excavation of trench in all kinds of soils Kilometre including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (a) Depth 1.0 meter, Width 0.3 meter.
Laying of S&T Cables (Signal/Quad/Power) in Kilometre the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Transportation of cables in rolls with or Drum-Km without wooden drums (S and T Cables) from concerned store to the site of works. Note: The unit Drum-KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Full Apparatus Case with earth Numbers excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%.
HDD: In case of short stretches (less than 100 Metre m in single stretch). Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site in-charge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (a) 1 HDPE pipe. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Excavation of earth pit, placing & fixing of Numbers Earth electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway.
Mechanised Drilling/Micro Tunnelling under Metre important/ busy metal/concrete road/Railway track and laying of GI pipe including supply (make: TATA/Jindal or better) of min. 75mm inner diameter Grade Medium with Spec. No. IS- 1239, Pt-1, 2004 including supply, Boring and pulling cable upto 110mm dia. at a depth of min. 1 meter as per site condition. This also includes reinstatement of the surface to the original state.
Cement Concrete of proportion 1:3:6 (Cement: cum Sand: Stone chips of 25mm nominal size) for miscellaneous works. It includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture (aggregate will not exceed beyond 3.8 cm). Note: All materials required for foundation are to be supplied by the contractor.
Execution of Straight joint on Quad cable/ jelly Numbers filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released.
Alteration/modification in existing location Numbers boxes, includes fixing/Removal or both the equipment, cable insertion, termination, wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagram. This includes filling with sand and plastering the same. Note: All the sundry materials such as paint, sand, cement, screws etc to be supplied by the contractor.
Installation, Testing & Commissioning of Single Set Section Digital Axle Counter phase reversal type as per Specification No. RDSO/SPN/177/ 2012, Ver.3 or latest without tool kit. This also includes supply & installation of maintenance free earth materials and exothermic bonding and other connecting Cable etc as per RDSO specification. No: RDSO/SPN/ 197/2008 or latest including foundation of Mushroom and/ or Location Box or both. Resetting equipment to be connected to the EI Ring earth. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Alterations/modifications works on existing Numbers relay rack (Q-series/ Composite Relay Racks)/Cable Termination Racks (CTR) including works of installation, wiring, termination, testing and commissioning. The work includes fixing of aluminium/steel/M. S ladder along with supply as per requirement to accommodate additional plug board, relays, terminals/blocks, terminals, tag blocks, fuses, transformers, bus bars, TW shelves/strips etc. in the existing relay racks/CTR's, 6 mm Hylam sheets of required length for writing terminal description etc. fixing and termination of cables on the relay racks, CTR's with number embossed ferrules, bunching of cables with PVC tapes, earthing of cable armours, covers including painting and lettering, making anti tilting arrangement. Note:- a) Relay rack (Q- series/ Composite Relay Racks) : Payments for alterations in existing relays upto 20 nos. relays & above 20 nos. shall be made 50% & 100% respectively. b) Cable Termination Racks (CTR):- Payments for alterations in existing CTR upto 120 cores & above 120 nos. cores shall be made 50% & 100% respectively.
Modification/Upgradation, wiring, validation & Set alteration of Data Logger/RTU of Digital & Analog Input including NMDL software etc. as per site engineer. The necessary wire from relay to tag block & from tag block to data logger, tag block, terminal, wiring material etc. required for this work to be supplied by contractor. Wire to be procured from RDSO approved firms. NOTE: This include modification in software, COA or Dashboard. (For Bimalgarh & Lathikata station)
Designing Interlocking Plan (SIP) in AUTOCAD. Two copies of prints with soft copy will be submitted to Railway for checking. If alterations are suggested/proposed by Railways then again two copies of prints will be submitted for advance approval after carrying out all the alterations as suggested /proposed by the Railways. Tracings will be submitted for all the diagrams mentioned above for the purpose of approval by Railway prior to commissioning of station.
Shifting/re-locating/opening & refitting during Per Engineering work, fixing, wiring, testing of Detection existing MSDAC DP as per direction of site Point engineer of Railway. This includes excavation (DP) of trenches for fixing of Tx/Rx cable, foundation etc. if required and re-erection of same DP. Note: Track device means 01 DP of MSDAC. Any Rail connect/Track device accessories like nut & bolt, insulation etc. and damage during shifting has to be supplied by the contractor instructions by SSE/Sig-in- charge. Total 1398597.00
Item Breakup - D-Material Supply-SOR (Signalling)
Supply of Thermo-shrink jointing (TSF) kits for Numbers jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/condenser/Y-(Derivation)/Loading Coil/Transformer Joints as per Specification No. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest. (Inspection by RDSO)
Supply of Steel Apparatus case Full height as Numbers per Drawing No. SK/Drg./OL/SER /198 or latest with E-type lock . E-type lock & their key ward No. will be decided by site Engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Supply of Hylam sheets is not covered under this scope. This includes supply of one key & handle for each four Apparatus Case or minimum one. (Inspection by representative of Sr. DSTE/CKP)
Supply of Earth Electrode as per Drawing No. Set 19-D6 of SEM-2021 or latest. GI pipe confirming to IS:1239 or latest of 3.17 mm thickness, minimum 2.5 m long, 50.8 mm diameter, 4.76 mm diameter drilled holes staggered at distance of 152.4 mm. (Inspection by representative of Sr. DSTE/CKP)
Supply of 25 mm 6 Way PBT Terminal block as Numbers per Specification No. IRS:S-75/2006 Rev. 2.0 or latest as per IRS Drg. No. SA-23756 Alt-3 or its latest amendments. (Inspection by RDSO)
Supply of Non-Deteriorating type of low Numbers voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (a) ND Fuse Cylindrical Type 2 Amp. (Inspection by RDSO)
Supply of Non-Deteriorating type of low Numbers voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (b) ND Fuse Cylindrical Type 4/6 Amp. (Inspection by RDSO)
Supply of Non-Deteriorating type of low Numbers voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (c) ND Fuse Cylindrical Type 16 Amp. (Inspection by RDSO)
Supply of PBT fuse block as per Specification Numbers No. IRS:S-75/2006 Rev. 2.0 or latest as per IRS drawing No. . SA: 23748 with alt 4 or its latest amendments. (Inspection by RDSO)
Supply of 35 mm x 6 mm thick MS Flat Plate Metre Strip as per IS: 226-1975 or latest for earth connection to Signal post, L/Box etc. (Inspection by representative of Sr. DSTE/CKP) Total 121739.00
Item Breakup - A1-Execution-Non-SOR (Telecom)
Cement concreting/preparation of cable duct Metre of cable route with graded stone chips with thickness /depth & width of 300mm x 150 mm. and grouting of both sides & refilling after cable laying. The standard ratio of cement, sand & 20 mm chips shall be 1:3:6 respectively. N.B: Contractor shall supply materials such as cement, sand, chips etc. & transport the same to the execution site. The contractor shall also execute the following. Approx. of 4.49 bags of cement/Cu.metres shall be used. Cement (OPC/Slag) should be of Gr. 53 and will be inspected by SSE/Tele-in- charge before use.
Installation, testing, and commissioning for Lot CCTV systems complete and system integration charges with 2 hours on site user training with user manual. NOTE: Banner, size 18"x18" with painting and lettering "You are under CCTV surveillance" in three language i.e. English, Hindi and regional language.
Installation of Rack 9U/42U. Total 78916.99
Item Breakup - B1-Material Supply-Non-SOR (Telecom)
Supply of 8 Channel NVR with Recording Numbers Resolution up to 8MP, 2 SATA interfaces for HDD connection (up to 10 TB capacity per HDD), Network Interface :1RJ- 4510/100/1000Mbps self-adaptive Ethernet interface, Working Temperature:-10 °C - +55 °C(+14 °F -+ 131 °F), Maximum Output Resolution: 4K (3840x2160) / 30Hz, Third Party Network Camera Compatible. Make: HIKVISION/CPPLUS/Dahua/AXIS or better. (Inspection by representative of Sr. DSTE/CKP)
Supply and Transportation of 6 TB Surveillance Numbers HDD, Make SEAGATE/WD or similar or better. (Inspection by representative of Sr. DSTE/CKP)
Supply and Transportation of Camera Housing Numbers (Protection for outdoor Camera). (Inspection by representative of Sr. DSTE/CKP)
Supply and transportation of IP Bullet Camera Numbers 2 MP, resolution:1920 x 1080(Full HD) @ 25FPS, as per RDSO specification No. RDSO/SPN/TC/65/2021 version 6.0 or latest. It should have STQC Certification. (Inspection by representative of Sr. DSTE/CKP)
Supply and transportation of IP DOME camera Numbers 2 MP Resolution: 1920 x 1080 Min (Full HD) @ 25 FPS. It should have STQC Certification. (Inspection by representative of Sr. DSTE/CKP)
22" LED Monitor, Make Dell/Samsung or Numbers better. This includes Key board and mouse. (Inspection by representative of Sr. DSTE/CKP)
Supply and transportation of HDMI Cable of 5 Numbers Meter length, Brand Akamgo, MX, Terabyte. (Inspection by representative of Sr. DSTE/CKP)
Supply of 1:4 module type PLC splitter, SC/UPC Numbers connector with 2 mm. to 1.5 meter cable. (Inspection by representative of Sr. DSTE/CKP)
Supply, Transportation and Installation of 1.1 Numbers KVA UPS, Brand: APC or better along with Battery. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply and transportation of 5 Amps (PVC) Numbers switch board with three sockets (5 pins, 3 switch piuano, 1 fuse, 1 indicator and surge protector, Make Anchore/Havells or similar or better. (Inspection by representative of Sr. DSTE/CKP)
Supply of Spike Buster make Anchor or similar Numbers or better. (Inspection by representative of Sr. DSTE/CKP)
Supply, transportation of CAT 6 UTP patch cord Numbers (RJ-45 type)- 2m length, D-Link/Digisol or similar. (Inspection by representative of Sr. DSTE/CKP)
Supply of flexible conduit pipe 1" dia. Metre (Inspection by representative of Sr. DSTE/CKP)
Supply of C series MCB Single POLE 6 AMP Numbers with metal enclosure. Make: Schneider/ Legrand/L&T/Havells or better (Inspection by representative of Sr. DSTE/CKP)
Supply of C series MCB Single POLE 16 AMP Numbers with metal enclosure. Make: Schneider/ Legrand/L&T/Havells or better. (Inspection by representative of Sr. DSTE/CKP)
Supply of Layer 2 LAN Switch (Minimum 8+2 Numbers ports manageable with 2 Nos. 1000 Mbps SM SFP port with optical module and 8 Nos. fast ethernet port, POE)., 8 Port Gigabit Managed Network POE Switch with 2 SFP ports, Uplink power Budget 150W, including 02 Nos compatible SM SFP Module with distance 20 KM or better. Warranty-36 Months from the date of Invoice. Make- CISCO/D-Link / TP-Link or better. Accepted offer-TP-Link TL- SG2210MP or better. (Inspection by representative of Sr. DSTE/CKP)
Supply, commissioning of 02 100/1000 Mbps LAN , 04X2 Mbps WAN( 4 Nos. G.703 interface). As per RDSO specification No. RDSO/SPN/TC/84/2008 Rev 0.0 or latest for tier 2 with free installation and 03 years on site warranty, Make: CISCO or HP or better. (Inspection by representative of Sr. DSTE/CKP) Total 1678086.93
Item Breakup - C1-Execution-Non-SOR (Signalling)
Modification of Control- cum-Indication-panel Job as per RDSO Specification No. RDSO/SPN/186/2004 and as per approved front plate diagram with supply of required No. of dominos and push button/switches are to be supplied additionally in the same cost by the contractor to the Railway. Total 36105.00
Item Breakup - C2-Execution-EI Alteration Work (Signalling)
Modification/Alteration (Electronic Interlocking) as per latest RDSO Alteration guidelines & TAN. It includes: Design and modification in existing Interface, Interlocking circuits and logic of EI system including modification in the VDU (Video Display Unit)/ LCP (Local Control panel), CCIP (Control cum Indication Panel) if any, Maintenance terminal (MTPC), Data Logger, Relay rack wiring etc. The complete work should comply with the latest RDSO specifications, guidelines and as per approved SIP & circuit diagrams. All the material (Interface cards/ relays/ wiring material/ connectors/ fuses /communication devices etc.) shall be provided by the contractor. The work includes the supply of modified Selection table, Interface Circuits, VDU/LCP, CCIP diagram if any etc. to suit the modified SIP. It also includes the carrying out of FAT, SAT or two rounds FAT (as applicable) jointly with Railways and satisfactory commissioning. All plans/drawings/circuits etc. should be prepared on Auto CAD. Soft copy including Auto CAD copy has to be supplied in pen drive and 06 sets of hard copies also to be supplied as a completion drawing. (a) Alteration involving modification in upto 10 routes. (For Bimalgarh, Lathikata EI Alteration) Bimalgarh & Lathikata- SIEMENS(Make). Total 3656562.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCAdvanceCorrectionSlipNo.11..pdf GCC Advance Correction Slip
ATTACHMENT
Annexure-1and2.pdf
ATTACHMENT
Annexure-L.pdf
ATTACHMENT
Annexure-MandN.pdf
ATTACHMENT
Anneure-V.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
Annexure-VI-B.pdf
ATTACHMENT
Annexure-Z.pdf
ATTACHMENT
TENDERFORMFirstSheet.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf
ATTACHMENT
SpecialConditionsofContract.pdf
ATTACHMENT
Download all tender documents and submit your bid