| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC | ₹19.9 L Quoted ₹20.0 L | L1 | Accepted-AOC Lowest 1st |
| 2 | L2₹20.5 LRejected-AOC NEAR BAZID BEG OFFICE 99 G FARIDAPUR CHAUDHARY IZZATNAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹20.5 L | L2 | Rejected-AOC Lowest 2nd |
| 3 | L3₹20.6 LRejected-AOC MOHALLA DESHNAGAR PILIBHIT | PILIBHIT | PILIBHIT | UTTAR PRADESH | ₹20.6 L | L3 | Rejected-AOC Lowest 3rd |
| Sl No | Description | Qty | Unit | BARKATI ASSOCIATES L1 | M/S BEG ENTERPRISES L2 | POWER AND POWER CONSULTANTS L3 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following material from store center Pilibhit to site including loading unloading at both end distance upto 60 km under EDD Puranpur. | ||||||
| 1.01 | PCC 8.5/9 mtr.Pole | 175 | Nos. | 645 ₹1.1 L | 650 ₹1.1 L | 650 ₹1.1 L |
| 1.02 | ST Pole 11 mtr. | 40 | Nos. | 705 ₹28,200 | 650 ₹26,000 | 650 ₹26,000 |
| 1.03 | 25 KVA T/F | 12 | Nos. | 2,097 ₹25,164 | 2,100 ₹25,200 | 2,100 ₹25,200 |
| 1.04 | 63 KVA T/F | 6 | Nos. | 2,500 ₹15,000 | 2,200 ₹13,200 | 2,200 ₹13,200 |
| 1.05 | 100 KVA T/F | 2 | Nos. | 2,499 ₹4,998 | 2,500 ₹5,000 | 2,500 ₹5,000 |
| 1.06 | 250 KVA T/F | 1 | No. | 3,500 ₹3,500 | 3,100 ₹3,100 | 3,100 ₹3,100 |
| 1.07 | 400 KVA T/F | 1 | No. | 3,900 ₹3,900 | 3,500 ₹3,500 | 3,500 ₹3,500 |
| 1.08 | ACSR weasel/Raccon | 30.5 | Km. | 2,490 ₹75,945 | 2,450 ₹74,725 | 2,450 ₹74,725 |
| 1.09 | ACSR Dog conductor | 6.1 | Km. | 3,100 ₹18,910 | 2,450 ₹14,945 | 2,450 ₹14,945 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
21 Jul 2025, 11:30 amClosed
SE EDC PILIBHIT
NEAR ROADWAYS PILIBHIT
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related works through running contract in fully deposit scheme under Electricity Distribution Division-Puranpur
2025_MVVNL_1052658_1
T-16/EDCP/2025-26
Open Tender
Miscellaneous Works
365 days
Puranpur
As per tender form
3 documents required · 3 mandatory
₹3,540
SE EDC
₹20,000
24 Jan 2026
28 Jun 2025
21 Jul 2025
28 Jun 2025
21 Jul 2025
28 Jun 2025
Amount
Carriage of following material from store center Pilibhit to site including loading unloading at both end distance upto 60 km under EDD Puranpur.
PCC 8.5/9 mtr.Pole
ST Pole 11 mtr.
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
ACSR weasel/Raccon
ACSR Dog conductor
11 KV XLPE Cable
33 KV XLPE Cable
Other line material (as AB Cable, cross arm, T-off, Top Channel, GI, Stay wire earthing rod, LT Distribution box, 11 KV Pin, Disc. Insulator etc.
Erection of single pole HT/LT PCC 8.5 mtr. Including fitting of all accessories. (All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. As per RESSPO schedule.
Erection of single pole HT/LT STP 11 mtr. Including fitting of all accessories. (All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. As per RESSPO schedule.
Erection of D/P structure of 8.5 Mtr. PCC fitting of all accessories,(All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. Complete in all respect. As per RESSPO schedule.
Erection of D/P structure of STP 11 Mtr. fitting of all accessories,(All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. Complete in all respect. As per RESSPO schedule.
Grouting of PCC / STP pole with ration 1:4:8 CC ratio cement sand and stone grid as per RESSPO drawing all required material will be provided by contractor.
Digging of pit and fixing with grouting of stay (all type clamps, T&P and nut bols of various size etc. provided by firm
Earthing of HT/L/T pole in the ground and properly connected to each support. As per RESSPO schedule (earthing rod provided by department and other required nut and bolts etc. provided by firm by at his on cost)
Laying and sagging of 3 Phase ACSR weasel/raccon conductors for 11 KV line including jumpering, hosting, fixing of all type of insulator, binding, jointing and its clamping etc. in all respect. (conductor provided by department)
Laying and sagging of 3 Phase ACSR dog conductors for 33 KV line including jumpering, hosting, fixing of all type of insulator, binding, jointing and its clamping etc. in all respect. (conductor provided by department)
Laying of AB cable 3x50/3x95/3x120
Laying of AB cable 1x16
Mounting of following T/F on D/P and making all LT/HT connection.
25 KVA T/F
63 KVA T/F
100 KVA T/F
Laying of 11 KV XLPE cable on STP/PCC pole complete in all respect (all required clamps with MS-angle of size 50*50*6 mm 14 inches long and required size nut, bolt and washer provided by firm on his cost etc.)
Laying of 11 KV XLPE Cable by drill method with GI pipe of size 4" dia. As per norms (Pipe will be provided by contractor) complete work in all respect.
Laying of 11 KV XLPE Cable by drill method with HDPE pipe of size 4" dia. As per norms (Pipe will be provided by contractor) complete work in all respect.
Laying of 11 KV single circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 11 KV XLPE cable)
Laying of 11 KV double circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. The two cables should be seprated by a partition of single bricks. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 11 KV XLPE cable)
Laying of 33 KV single circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 33 KV XLPE cable)
Laying of 33 KV double circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. The two cables should be seprated by a partition of single bricks. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 33 KV XLPE cable)
Carriage of new CT/PT from store center Pilibhit to site and mounting/installation on double pole, making all connections distance upto 30 km. (All T & P and required size Nut Bolt and washer etc. provided by firm) Complete work in all respect.
Carriage of new 11/33 KV Cubical metering from store center Pilibhit to site with installation and making all connections distance upto 30 km. (All T & P and required size Nut Bolt and washer etc. provided by firm) Complete work in all respect.
Termination of Jointing kits (11/33 kv) jointing kit provided by department (All T & P and Nutt Bolt of various size etc. provided by firm)
Carriage from store center pilibhit to site and Hoisting of 33 & 11 KV XLPE cable on pole by providing GI Pipe including cost of GI Pipe and required clamps. (Only 33 & 11 KV XLPE cable provided by department) complete work in all respect.
Construction of T/Fs plinth of size 5 fit x5 fit x5 fit with the help of first class bricks, cement & coarse sand as per norms. Filling the structure completely by brick blast & plastering work of walls Including CC work on top in ratio 1:2:4 by cement, stone grit & sand and grouting of 2 nos. M.S. channel of size 50x50x5 mm on the top of T/Fs plinth whole work should be done as per RESSPO norms complete in all respect. (All Material will be provided by Contractor own his cost) For 250 KVA T/F & 400 KVA T/F.
Mounting of 250 KVA T/F on newly constructed plinth, laying of cable jumpering and making all HT/LT connections complete work in all respect.
Mounting of 400 KVA T/F on newly constructed plinth, laying of cable jumpering and making all HT/LT connections complete work in all respect.
Earthing of 250/400 KVA T/F (Body and neutral) by boaring type upto 40 feet depth water level by providing GI Pipe and making connection from boaring site to T/F.
Fixing of LT distribution box single Phase with providing IP connector and required nut, bolt and washer.
Fixing of LT distribution box three Phase with providing four nos.IP connector and required nut, bolt and washer.
M/S BEG ENTERPRISES (BID ID -5360010)
POWER AND POWER CONSULTANTS (BID ID -5360341)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid