| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L4₹49.9 L+₹11.2 L (29.0%)Accepted-AOC FLAT NO 101 2ND FLOOR RAGHAVENDRA RESIDENCY PLOT NO 1 2 3 SURVEY NO 27 PICKET SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | L4 | Accepted-AOC L1 bonafide bid | |
| 2 | L1₹38.7 LRejected-Finance | L1 | Rejected-Finance Rejected due to non-bonafide bid | |
| 3 | L2₹44.5 L+₹5.9 L (15.2%)Rejected-Finance | L2 | Rejected-Finance Rejected due to non-bonafide bid | |
| 4 | L3₹46.5 L+₹7.9 L (20.3%)Rejected-Finance | L3 | Rejected-Finance Rejected due to non-bonafide bid | |
| 5 | L5₹52.2 L+₹13.5 L (34.9%)Rejected-Finance | L5 | Rejected-Finance Rejected due to not being L1 amongst bonafide bids |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
15 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE UTILITY SECUNDERBAD
GE UTILITY , MUD FORT,SECUNDERBAD- 500003
MANNING AND OPERATION BY OUT SOURCING OF SERVICES OF EXTERNAL ELECTRIC SUPPLY FOR MD OTM ACCN OF OFFRs JCOs ORs AT CERTAIN UNITS OF ZONE IC UNDER AGE EM NO-I OF GE U SECUNDERABAD
2020_MES_370393_1
GE(U)/SEC/TOKEN/ 35 OF 2020-21
Open Tender
Manpower Supply
Item Rate
335 days
secunderbad
as per nit
6 documents required · 6 mandatory
₹500
GE UTILITY SECUNDERBAD
₹94,000
Yes
28 Oct 2020
19 Aug 2020
17 Sept 2020
19 Aug 2020
15 Sept 2020
3 Sept 2020
60 days
Amount
Manning and operation by out sourcing of services for electric supply system in three shifts, each shift of 08 (eight) hours including Sundays and holidays by deploying the manpower as mentioned below for entire system comprising of HT and LT, OH switch gear, panel board, UG cables, street lights, transformer, GODs/Drop out fuse assembly, HT/LT OH lines, stringing OH lines, laying of cables etc including maintenance of necessary records and documents, complaints including cleaning the E/M installations and transformer yards complete all as specified and directed for the units 22 Med Regt, 54 Arty Bde, Md offers accn of Napier lines, Md JCOs/OR accn of Plassey lines, OTM Md accn of 40 Fd Regt of Bowenpally and OTM Accn of Amn Magazine kompally area complete all as specified and directed. a) Shift Timings are as under :- (i) 1st shift : 0600 hrs to 1400 hrs (ii) 2nd shift 1400 hrs to 2200 hrs (iii) 3 rd shift 2200 hrs to 0600 hrs (b) Man power to be employed :- (i) Electrian -03 Nos, 01 No for each shift (ii) Mate -03 Nos, 01 No for each shift
Manning and operation by out sourcing of services electric supply distribution system in three shifts, each shift of 08 (eight) hours including Sunday & holidays by deploying the manpower as mentioned below for entire system comprising of HT and LT, OH switch gear, panel board, UG cables, street lights, transformer, GODs/Drop out fuse assembly, HT/LT OH lines, stringing OH lines, laying of cables etc including maintenance of necessary records and documents at Navy house, Ammuguda, church lines, Arcot lines, 76 Inf Bde sig coy, 76 Inf Bde Camp, Trishul Line area, SF Qtrs, MES Key personal Qtrs, TLPH HT / LT feeders, HQ T&ASA, TASA Signal Centre, CTW, 96 Hav Md Accn, Arcot lines, old Allenby line OTM & Md Accn, Map Bipta, Map Kowkoor line JCO Md Accn and MAP area including cleaning the E/M installations and Transformer yards complete all as specified and directed:- (a) Shift Timings are as under :- (i) 1st shift : 0600 hrs to 1400 hrs (ii) 2nd shift 1400 hrs to 2200 hrs (iii) 3 rd shift 2200 hrs to 0600 hrs (b) Man power to be employed :- (i) Electrian -03 Nos, 01 No for each shift (ii) Mate -03 Nos, 01 No for each shift
Manning and operation by out sourcing of services electric supply distribution system in three shifts, each shift of 08 (eight) hours including Sunday & holidays by employing the manpower as mentioned below for entire system comprising of HT and LT, OH switch gear, panel board, UG cables, street lights, transformers, GODs/Drop out fuse assembly, HT/LT OH lines, stringing OH lines, laying of cables etc including maintenance of necessary records and documents, complaints including cleaning the E/M installations and transformer yards in respect of MAP Bownoally Offrs/JCO/ORs MD Accn, Sarvatra lines, 2 Lanchar/11 Armd Regt, 174 Med Regt, 690 TATRA Unit, Recovery Camp and Battle Range area complete all as specified and directed. (a) Shift Timings are as under :- (i) 1st shift : 0600 hrs to 1400 hrs (ii) 2nd shift 1400 hrs to 2200 hrs (iii) 3 rd shift 2200 hrs to 0600 hrs (b) Man power to be employed :- (i) Electrian -03 Nos, 01 No for each shift (ii) Mate -03 Nos, 01 No for each shift
Notes for Sl item No1 to 3 :- (a) Submission of proof of crediting the wages into the bank account / payment made to the employees by the Contractor shall be a pre-requisite to release subsequent payments to contractors. The contractor shall also provide the details of individual’s EPF and ESI account No to claim the RAR / FB payment from time to time. Register for wages, complaints and identity of workers will be maintained by the contractor and will be submitted to the department on monthly basis. (b) The rate quoted is deemed to be inclusive of the cost of complaint slips and registers, cost of T&P for maint work of all plants and minor consumables such as gland packing, grease, nut, bolts, PVC insulation tape, screws, fuse wire, clips etc for day to day maintenance including maintaining the records/registers such as Log Sheets, break down register, Plant Running Record Book including Fuel consumption records, area cleaning and maintenance of sub-stations including earth pits near sub-stations and prunning of tree branches near the eletric over head lines etc for day to day maintenance.
(c) The rate quoted is deemed to be inclusive of providing mobile communication system in the complaint cell so that the complaint can be lodged and feed back can be obtained. (d) Stores viz fitting/fixtures, cable etc shall be issued by the department for replacing unserviceable fittings/fixtures, cables etc where required at no extra cost to the Government. The stores to the extent available in the stores shall be issued. (e) The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform shall be in blue colour pant and shirt.The pattern of the uniform shall be as decided by the Engineer-in-Charge.
(f) Technician/employees employed by the contractor will not work contineously for 07 days. The employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of IAFW-2249. (g) The contractor is responsible for submitting the documents of qualification / experience certificate of employees before commencement of work. (h) The rate considered is deemed to include for 1st hour maintenance including cleaning and replacement of minor spare parts of unserviceable bolts, nuts and twin washers as and when required. (j) The rate considered is deemed to include the cost towards maintenance of hygienic condition and around the installations. The contractor is fully responsible towards the health of staff employed.
K LAKSHMAN SINGH AND CO
M/s Jai Ganesh Engineering Solutions
L and S ENTERPRISES
diesel power services (a.p)
The Deccan Engineering and Refrigeration Company
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .