Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | EUROTEC ENGINEERING CORPORATION PRIVATE LIMITED | 11 | - |
| 2 | Schedule 2 | EUROTEC ENGINEERING CORPORATION PRIVATE LIMITED | 11 | - |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
27 Jun 2023, 4:00 pmClosed
400 SCMH ELECTRIC DRIVEN
4861916
GEM/2023/B/3535015
Two Packet Bid
400 SCMH BOOSTER COMPRESSOR for schedule 1,Erection and Commissioning with PAT,Operation charges of
112 days
Uttar Pradesh; Bareilly
Group wise evaluation
BOQ
11 documents required · 11 mandatory
3 yrs
₹31
80%
Exempted
18 Jul 2023
6 Jun 2023
27 Jun 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | 400 SCMH BOOSTER COMPRESSOR for schedule 1 | Design, Engineering, Manufacture, Shop testing, loading, unloading , transportation and supply of Electric motor driven CNG hydraulic booster compressor package of min. average flow capacity of 400 SCMH | 36 | nos | chetansharma | 112 |
| 2 | Erection and Commissioning with PAT | Installation, Erection & Commissioning of Complete package along with Performance Acceptance Test as per tender document | 36 | nos | chetansharma | 112 |
| 3 | Operation charges of 1st shift for 1st year after warranty period | Operation and Comprehensive Maintenance | 32,400 | each | chetansharma | 112 |
| 4 | Operation charges of 1st shift for 2nd year after warranty period | Operation and Comprehensive Maintenance | 32,400 | each | chetansharma | 112 |
| 5 | Comprehensive Maintenance charges for 1st year after warranty period | Comprehensive Maintenance of compressor package | 432 | each | chetansharma | 112 |
| 6 | Comprehensive Maintenance charges for 2nd year after warranty period | Comprehensive Maintenance of compressor package | 432 | each | chetansharma | 112 |
| 7 | Comprehensive Maintenance charges for 3rd year after warranty period | Comprehensive Maintenance of compressor package | 432 | each | chetansharma | 112 |
| 8 | Comprehensive Maintenance charges for 4th year after warranty period | Comprehensive Maintenance of compressor package | 432 | each | chetansharma | 112 |
| 9 | Comprehensive Maintenance charges for 5th year after warranty period | Comprehensive Maintenance of compressor package | 432 | each | chetansharma | 112 |
| 11 | 400 SCMH BOOSTER COMPRESSOR for schedule 2 | Design, Engineering, Manufacture, Shop testing, loading, unloading , transportation and supply of Electric motor driven CNG hydraulic booster compressor package of min. average flow capacity of 400 SCMH | 4 | nos | chetansharma | 154 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4861916.pdf
GEM_BID
te_2023-06-06-14-32-28_39f403bff29be3471923b8536f567894.pdf
BOQ
boq_item_sample_file_2023-06-06-14-32-28_2aa992208b1abadfeeb9a87686a8b61a.csv
BOQ
Commecial_9f807671-bb6d-4c01-938a1686046222737_nikitasethi.doc
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .