| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.8 L+₹1.1 L (8.34%)Admitted-Fee/PreQual/Technical/Finance | ₹14.8 L+₹1.1 L (8.34%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹15.4 L+₹1.8 L (12.9%)Admitted-Fee/PreQual/Technical/Finance | ₹15.4 L+₹1.8 L (12.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JITHIN VARGHESE L2 | HAREESH M P L1 | ANIRUDHAN S L3 |
|---|---|---|---|---|---|---|
| 1.00MCF Construction | ||||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 969 | sqm | 35.29 ₹34,196.01 | 33 ₹31,977 Lowest | 99 ₹95,931 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 4 | each | 550.8 ₹2,203.2 | 520 ₹2,080 Lowest | 550.8 ₹2,203.2 |
| 1.00 | OD300940/2025-2026:Filling with Quarry muck-Filling up lowlyingand water logged area with lockalmaterial/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming,etc complete for improving the CBRvaiue of sub grade(DSR 2o21)( QM With roller) | 45 | cum | 1,137.94 ₹51,207.3 | 1,100 ₹49,500 Lowest | 1,137.94 ₹51,207.3 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21.03 | cum | 7,932.89 ₹1,66,828.68 | 7,289 ₹1,53,287.67 Lowest | 7,932.89 ₹1,66,828.68 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 20.44 | cum | 9,963.93 ₹2,03,672.69 | 9,155 ₹1,87,137.36 Lowest | 9,963.93 ₹2,03,672.69 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 37.63 | sqm | 386.16 ₹14,533.13 | 355 ₹13,360.43 Lowest | 386.16 ₹14,533.13 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 113.03 | sqm | 762.88 ₹86,228.33 | 700 ₹79,121 Lowest | 762.88 ₹86,228.33 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 43.2 | sqm | 1,008.55 ₹43,569.36 | 925 ₹39,960 Lowest | 1,008.55 ₹43,569.36 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.24 | cum | 12,772.13 ₹41,381.7 | 11,732 ₹38,011.68 Lowest | 12,772.13 ₹41,381.7 |
Tender Value
₹14.8 L
EMD Value
₹36,933
Closing Date
7 Jul 2026, 6:00 pmClosed
Assistant Engineer
LID EW Section Muttar GP
Pro.No. 152/26 Construction of MCF in Muttar GP
2026_LSGD_858106_1
1/AE/LIDEW/MTR/2026-27
Open Tender
Civil Works - Buildings
Item Rate
90 days
Muttar GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹36,933
Yes
17 Sept 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MCF Construction | |||||
| 1.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 1.002 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 1.003 | OD300940/2025-2026:Filling with Quarry muck-Filling up lowlyingand water logged area with lockalmaterial/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming,etc complete for improving the CBRvaiue of sub grade(DSR 2o21)( QM With roller) | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.009 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1450595.xls
BOQ • 0.31 MB
mcfsbd.pdf
Tender Documents • 1.84 MB
PAMCF.pdf
Tender Documents • 0.28 MB
FOTmcf.pdf
Tender Documents • 0.25 MB
Affimcf.pdf
Tender Documents • 0.24 MB
Pactedathua.pdf
Other Document • 0.24 MB
epay.pdf
Other Document • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .