| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.3 CrAccepted-AOC 150 VILLARASAMPATTI NAAL ROAD NASIYANUR ROAD VILLARASAMPATTI POST ERODE 638 107 | ERODE | TAMIL NADU | 638107 | ₹11.3 Cr | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹14.1 CrRejected-AOC A 20 21 SECTOR 59 NOIDA 201301 U P INDIA | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹14.1 Cr | 2 | Rejected-AOC Second Lowest Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical PQ condition not complied |
| 4 | Rejected-Technical | - | - | Rejected-Technical PQ condition not complied |
| Sl No | Description | Qty | Unit | Coral Rewinding India Private Limited L1 | Voith Hydro Private Limited L2 |
|---|---|---|---|---|---|
| 1.00Part A- Supply. | |||||
| 1.01 | Design, manufacture and supply of 180Nos.new class ‘F’ insulated VPI diamond type coils with existing coil dimensions and profile in all respect suitable for 55MW (with 10% COL at 0.9PF) loading capability. The following tests shall be carried out during the manufacturing process.
i) Dimensional check
ii) Coil Resistance Measurement
iii) Inter strand IR value test at110VAC for 3sec as ESI Standard 44-7, June 1978
iv) Inter-turn insulation test as per IEEE522:2004 using HVHF test set
v) IR value at 5KV before and after HV AC test for1minute
vi) HV AC test at 27 kVfor1minute as per BS4999:
Part60:1976
vii) Tan delta test at 2.2 KV, 4.4 KV, 6.6 KV, 8.8 kV and 11 KV as per ESI Std 44-7, June 1978 and IEEE Std 286-2000
viii) Partial Discharge Test as per IEEE Std 1434
ix) Voltage Endurance Test on a random sample as per IEEE Std 1043
x) Thermal Cycling Test on a random sample as per IEEEStd1310 | 180 | Nos | 5,13,00,000 ₹6.1 Cr | 6,42,35,880 ₹7.6 Cr |
| 1.02 | Supply of spare 20Nos new Class-F insulated VPI diamond-type coils with dimensions and profile as mentioned in item 1.01 | 20 | Nos | 57,00,000 ₹67.3 L | 71,37,320 ₹84.2 L |
| 1.03 | Packing the spare 20Nos. coils in standard packing with wooden boxes | 1 | LS | 2,00,000 ₹2.4 L | 10,00,000 ₹11.8 L |
| 1.04 | Transporting the 180 Nos new VPI Insulated coils + 20 Nos. Spare VPI Insulated coils from contractor works to Power House using suitable transporting stand-200 coils | 1 | LS | 8,00,000 ₹9.4 L | 40,00,000 ₹47.2 L |
| 1.05 | Supply complete winding kit (Class-F) for stator winding like insulation materials, wedges, packing under the wedges, mouth blocks, insulating tapes, varnish, slot side and bottom side packing, separators and brazing rods | 1 | LS | 66,00,000 ₹77.9 L | 1,57,79,100 ₹1.9 Cr |
| 1.06 | Supply of complete winding kit (Class-F) for 20nos. Spare stator winding like insulation materials, wedges, packing under the wedges, mouth blocks, insulating tapes, varnish, slot side and bottom side packing, separators and brazing rods. | 1 | LS | 19,50,000 ₹23.0 L | 17,53,233 ₹20.7 L |
| 1.07 | Supply and installation of PT-100 RTDs for temperature measurements @stator winding and core. (12+12). | 24 | Nos | 50,400 ₹59,472 | 2,27,880 ₹2.7 L |
Tender Value
₹9.7 Cr
EMD Value
₹5 L
Closing Date
25 Apr 2025, 3:00 pmClosed
Chief Engineer Generation
Chief Engineer Generation Moolamattom
Design, Manufacturing, Supply, Erection , Supervision of erection, Testing and commissioning of new VPI insulated stator winding and dismantling, re varnishing and re stacking of the existing stator core of 55 MW unit No2 Generator at SGHEP
2025_KSEB_755632_1
CEG/AE2/SBG/06/2024-25 dated 27.03.2025
Open Tender
Electrical and Maintenance Works
Sabarigiri HEP
Please refer Tender Documents
10 documents required · 10 mandatory
₹17,700
Yes
₹5 L
Yes
16 Aug 2025
27 Mar 2025
26 Apr 2025
27 Mar 2025
25 Apr 2025
2 Apr 2025
Part A- Supply.
Design, manufacture and supply of 180Nos.new class ‘F’ insulated VPI diamond type coils with existing coil dimensions and profile in all respect suitable for 55MW (with 10% COL at 0.9PF) loading capability. The following tests shall be carried out during the manufacturing process. i) Dimensional check ii) Coil Resistance Measurement iii) Inter strand IR value test at110VAC for 3sec as ESI Standard 44-7, June 1978 iv) Inter-turn insulation test as per IEEE522:2004 using HVHF test set v) IR value at 5KV before and after HV AC test for1minute vi) HV AC test at 27 kVfor1minute as per BS4999: Part60:1976 vii) Tan delta test at 2.2 KV, 4.4 KV, 6.6 KV, 8.8 kV and 11 KV as per ESI Std 44-7, June 1978 and IEEE Std 286-2000 viii) Partial Discharge Test as per IEEE Std 1434 ix) Voltage Endurance Test on a random sample as per IEEE Std 1043 x) Thermal Cycling Test on a random sample as per IEEEStd1310
Supply of spare 20Nos new Class-F insulated VPI diamond-type coils with dimensions and profile as mentioned in item 1.01
Packing the spare 20Nos. coils in standard packing with wooden boxes
Transporting the 180 Nos new VPI Insulated coils + 20 Nos. Spare VPI Insulated coils from contractor works to Power House using suitable transporting stand-200 coils
Supply complete winding kit (Class-F) for stator winding like insulation materials, wedges, packing under the wedges, mouth blocks, insulating tapes, varnish, slot side and bottom side packing, separators and brazing rods
Supply of complete winding kit (Class-F) for 20nos. Spare stator winding like insulation materials, wedges, packing under the wedges, mouth blocks, insulating tapes, varnish, slot side and bottom side packing, separators and brazing rods.
Supply and installation of PT-100 RTDs for temperature measurements @stator winding and core. (12+12).
Description of Work / Item(s)
Part B- Labour.
Debrazing, de-wedging, removal of end banding and removal of old 180 Nos. Coils and handing over the old removed coils and transporting the removed coils to the store as per the direction of departmental officers.
Re-insulation, refixing and testing the existing stator overhang surge rings with class ‘F’ insulation.
Re-insulating refixing and testing refixing and testing existing main busbar with class ‘F’ insulation.
Dismantling the entire core, chemical washing, drying @180℃, varnishing the core with F-class insulation of superior grade (Subject to approval from KSEB Ltd) by maintaining uniform thickness, drying out the core@200℃, once more re-varnishing and drying, checking the IR value of the core, assembling the core, re-staggering & re-stacking, maintaining the core pack thickness, locking the core by insulating core bolts & checking the IR value of core bolts. The following tests are carried out in the re-varnished core before staggering. a. Xylol Test–as per IS648:2006–7.2.8 b. Mandrel Test–as per ASTM-D522 c. 7H pencil Hardness Test–as per IS101 (part-5 sec-1) –1998Class4 d. Insulation Resistance Test by applying 110 V AC between 10 Nos. Stampings clamped together with a lamp series. The lamp should not glow. As per ESI standard 44-7 June 1978
Conducting ELCID test on the core to ascertain the healthiness of the core during core re-lamination and restacking work.
Conducting flux loop test on the core to ensure the healthiness of the core after restacking before rewinding
Rewinding the stator is complete as per the existing design and testing. Test after installing the stator coils in the slots and wedging before connection i) IR value at 5kV before HV AC test ii) HV AC test at 25KV iii) IR value at 5kV after HV AC test The final test of the stator i) DC resistance measurement ii) IR value at 5kV before HV AC test iii) PI value at 5kV iv) HV AC test at 23kV as per IS4722:1992 v) IR value at 5kV after HV AC test vi) Tan delta test at 2kV, 4kV& 6.3kV as per ESI Std 44- 7 June 1978 and IEEE Std 286-2000 vii) Partial Discharge Test as per IEEE Std1434 viii) Electronic stator wedge tightness detection test shall be used for wedge mapping ix) Testing brazing healthiness using an ultrasonic inspection tool
Drying out, final testing and commissioning the Generator, including a successful trial run (72 hours) of the generator. Final testing includes the following. i.) HVAC test as per relevant IS ii.) IR& PI Tests. (IR test before and after HVAC test) iii.) Tan Delta test. iv.) Winding resistance test. v.) Surge comparison test. vi.) Partial discharge test.
Performance tests to be conducted by reputed agencies to find overall efficiency of the generating unit
Description of Work / Item(s)
Total
Total of BoQ 1 i.e. Part A - Supply
Total of BoQ 2 i.e. Part B - Labour
Voith Hydro Private Limited (BID ID -2199947)
Coral Rewinding India Private Limited (BID ID -2185441)
Voith Hydro Private Limited (BID ID -2199947)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf