Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹6.7 LRejected-Finance | ₹6.7 L | L2 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | YUGA & JANA CONSTRUCTIONS L2 | M.S.ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00BOQ | |||||
| 1.01 | THROUGHLY CLEANING THE EXISTING PAINTED SURFACES OF WALLS USING BUFFERING MACHINE. SCRAP THE EXISTING PAINTED SURFACE AND DISPOSE THE SAME AS DIRECTED. RATE INCLUDES LABOUR CHARGES AND ALL OTHER INCIDENTIAL CHARGES ETC., COMPLETE AT ALL LEVELS. | 1,500 | SQM | 30 ₹45,000 | 24 ₹36,000 Lowest |
| 1.02 | SUPPLY AND APPLICATION OF ONE COAT OF WEATHER PROOF EXTERIOR PRIMER AND TWO COATS OF EXTERIOR EMULSION OF APPROVED COLOUR SHADE INCLUDING SCAFFOLDING, LABOUR ETC., COMPLETE AT ALL LEVELS. (ASIAN OR BERGER). | 1,500 | SQM | 180 ₹2,70,000 | 168 ₹2,52,000 Lowest |
| 1.03 | THROUGHLY PREPARE THE SURFACES AND APPLY ONE COAT OF WALL PRIMER OF APPROVED MAKE OVER WALL PUTTY SURFACES AND APPLY TWO COATS OF ACRYLIC EMULSION FIRST QUALITY OF APPROVED COLOUR AND MAKE INCLUDING MATERIAL COST AND ALL CONSUMABLES LABOUR CHARGES, SCAFFOLDING ETC. COMPLETE AT ALL LEVELS. | 500 | SQM | 170 ₹85,000 | 156 ₹78,000 Lowest |
| 1.04 | PROVIDING TEMPORARY PLATFORM BY USING PIPES / SCAFFOLDING MATERIAL AND LAYING OF WOODEN PLANKS TO REQUIRED HEIGHT PROVIDE TARPAULIN OVER THE PLATFORM TO AVOID FALLING OBJECT ABOVE THE MACHINERY, ALSO REMOVE THE TEMPORARY PLATFORM AFTER COMPLETION OF THE WORK AS PER ENGINEER INSTRUCTION AT ALL LEVELS. | 900 | SQM | 280 ₹2,52,000 | 270 ₹2,43,000 Lowest |
| 1.05 | THOROUGHLY PREPARE THE SURFACES OF WALLS AND APPLY TWO COATS OF FIRST QUALITY WALL PUTTY INCLUDING FINISHING SMOOTHLY WITHOUT ANY WAVINESS, ETC., AT ALL LEVELS. | 100 | SQM | 150 ₹15,000 | 135 ₹13,500 Lowest |
| Sl.NoBidder Name | |||||
| 1 | YUGA & JANA CONSTRUCTIONS (BID ID -1681617) | 6,22,500 | Not Quoted | - | - |
| 2 | M.S.ENTERPRISES (BID ID -1680259) | 6,22,500 | Not Quoted | - | - |
Tender Value
Refer Docs
Closing Date
29 Jun 2026, 3:00 pmClosed
Chief General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Painting works for interior and exterior walls in Hardwood Fibre Line (HWFL) Building at TNPL Unit I
2026_TNPL_682245_1
TNPL/PMD/CIV/UNIT I/262713001939
Open Tender
Civil Works
Tender cum Auction
60 days
TNPL Unit I, Kagithapuram, Karur district
As per Invitation for Bids of Bid Document
4 documents required · 4 mandatory
₹0
Exempted
15 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | THROUGHLY CLEANING THE EXISTING PAINTED SURFACES OF WALLS USING BUFFERING MACHINE. SCRAP THE EXISTING PAINTED SURFACE AND DISPOSE THE SAME AS DIRECTED. RATE INCLUDES LABOUR CHARGES AND ALL OTHER INCIDENTIAL CHARGES ETC., COMPLETE AT ALL LEVELS. | 1,500 | SQM | - | - |
| 1.02 | SUPPLY AND APPLICATION OF ONE COAT OF WEATHER PROOF EXTERIOR PRIMER AND TWO COATS OF EXTERIOR EMULSION OF APPROVED COLOUR SHADE INCLUDING SCAFFOLDING, LABOUR ETC., COMPLETE AT ALL LEVELS. (ASIAN OR BERGER). | 1,500 | SQM | - | - |
| 1.03 | THROUGHLY PREPARE THE SURFACES AND APPLY ONE COAT OF WALL PRIMER OF APPROVED MAKE OVER WALL PUTTY SURFACES AND APPLY TWO COATS OF ACRYLIC EMULSION FIRST QUALITY OF APPROVED COLOUR AND MAKE INCLUDING MATERIAL COST AND ALL CONSUMABLES LABOUR CHARGES, SCAFFOLDING ETC. COMPLETE AT ALL LEVELS. | 500 | SQM | - | - |
| 1.04 | PROVIDING TEMPORARY PLATFORM BY USING PIPES / SCAFFOLDING MATERIAL AND LAYING OF WOODEN PLANKS TO REQUIRED HEIGHT PROVIDE TARPAULIN OVER THE PLATFORM TO AVOID FALLING OBJECT ABOVE THE MACHINERY, ALSO REMOVE THE TEMPORARY PLATFORM AFTER COMPLETION OF THE WORK AS PER ENGINEER INSTRUCTION AT ALL LEVELS. | 900 | SQM | - | - |
| 1.05 | THOROUGHLY PREPARE THE SURFACES OF WALLS AND APPLY TWO COATS OF FIRST QUALITY WALL PUTTY INCLUDING FINISHING SMOOTHLY WITHOUT ANY WAVINESS, ETC., AT ALL LEVELS. | 100 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
biddocument_262713001939.pdf
Tender Documents • 28.99 MB
BOQ_820022.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].