Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹4,233
Closing Date
6 Oct 2026, 5:00 pm
Assistant Executive Engineer
KIP O and M Sub Division No 1 Adoor
GENERAL ACTION PLAN 2026 2027 KIP O and M Annual Maintenance of Enathu III distributory between ch 0m to 2824m during Water Distribution General Civil Work
2026_Irrig_873345_1
IRR/PII/TR/2205/2026_5_4_1/1 The
Open Tender
Civil Works - Canal
Item Rate
240 days
Enath III
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,233
Yes
26 Sept 2026
26 Sept 2026
8 Oct 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Enath III distributary | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 3,600 | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 230.4 | cum | - | - |
| 1.003 | OD1429/2026-2027:Engaging coolie for removing floating bodies and other vegetations from canals and deposited silt from canal bed , construction of temporary bunds across canals for control and regulate the flow of water and for greasing of shutters etc complete during water distribution period as per the direction of departmental officers at site. | 26 | 1 nos | - | - |
| 2Syphon maintenance work- Field booth 3 | |||||
| 2.001 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.56 | cum | - | - |
| 2.002 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 7.82 | sqm | - | - |
| 2.003 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 8.52 | sqm | - | - |
| 2.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | - | - |
| 2.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 21.84 | kilogram | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1481548.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 2.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .