Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.3 LAccepted-Finance | ₹90.3 L | L1 | Accepted-Finance As per TEC recommendations. |
| 2 | L2₹57.4 L−₹32.8 L (36.4%)Rejected-Finance | ₹57.4 L−₹32.8 L (36.4%) | L2 | Rejected-Finance As per TEC recommendations. |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TEC recommendations |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
9 Aug 2024, 3:00 pmClosed
CPM Mumbai
303 Godrej Two Pirojshanagar, Vikhroli E 400079
Partial demolition and strengthening of warehouse PEB structure on Survey No 57 78 33 and 34 in Dive Anjur Village Taluka Bhiwandi Dist Thane in connection with Mumbai Ahmedabad High Speed Rail Project
2024_NHSRC_201611_1
NHSRCL/MA/CPM/MUM/WRK/24-25/02
Open Tender
Civil Works - Others
Item Rate
60 days
Dive Anjur village
Any Civil Engineering Work carried out for Govt/ Semi Govt/ PSU
2 documents required · 2 mandatory
₹11,800
Yes
National High Speed Rail Corporation Limited
₹2.5 L
Yes
11 Sept 2024
18 Jul 2024
10 Aug 2024
18 Jul 2024
9 Aug 2024
29 Jul 2024
18 Jul 2024 - 26 Jul 2024
Amount
Schedule-A (Partial Dismantaling & Strengthening of PEB Structure)
Dismantling/Demolition partly of Existing Pucca PEB Shed(Indian Corporation Ware House) on land of Survey No 57/4,78/3, 78/4 , 30, and 34 in DiveAnjur Village, Bhiwandi Taluka by mechanical and manual method comprising of cement, concrete, masonry, structural steel work, Rolling Shutters, sheets etc. & with all contractor’s labours, materials, tools, plants and machineries including disposal of released / dismantled materials, etc. complete. With all lead and lift, cleaning of site by dispose of debries. The Contractor to ensure the safety of during dismantling and strengthening work to balance part demolished structure by providing cleat to column& rafter, stiffener to Jack beam , providing missing nut-bolt, fighting of nuts, wilding etc before & after as per direction of Engineer-in charge and consultant report. No extra payment will be made for the same, rate also included with removing and refixing the existing partition at Grid-11 of structures along with shifting column & bracing of Grid-1 with excavation for casting of RCC, column, pedestals/foundation & RCC tie beam, holding down bolt, brick masonry, cement plaster etc complete as per drawing & report, as per direction of Engineer-In-Charge and Structural Consultant with all labours, materials & machinery complete.
Schedule-B (Credit to NHSRCL)
Credit for taking away released materials steel etc after dismantling of warehouse (PEB structure) as per direction of Engineer. The dismantled steel will be property of Contractor. Credit to NHSRCL salvage value of released materials like reinforcement steel, structure steel, pipes, Rolling Shutters, fittings , roof/side cladding sheets, etc complete after dismantled of structures in the quoted price.
SHREE KRISHNA CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .