Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹14.6 L+₹0.61 (<0.01%)Accepted-Finance | L2 | Accepted-Finance As per higher Authorities | |
| 2 | L1₹14.6 LRejected-Finance | L1 | Rejected-Finance As per higher Authorities |
| Sl No | Description | Qty | Unit | NARAYAN HARWALKAR L2 | M/S SURAJ S KATKAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varities shungles, pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted inclusive of chiselling, wedging etc. excluding blasting in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, includin setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete
a) All kinds of soil | 279.5 | cum | 228.96 ₹63,994.32 Lowest | 229.01 ₹64,008.3 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 20.4 | cum | 1,765.89 ₹36,024.16 Lowest | 1,768.63 ₹36,080.05 |
| 3.00 | Providing & Laying cement 1:2:4 (1 cement:2 coarse sand: 4 graded granitic or baseltic stone aggregate, 20mm, nominal size), excluding cost of centering & shuttering in
a) All Works upto plinth level | 219 | cum | 5,448.98 ₹11,93,326.62 | 5,448 ₹11,93,112 Lowest |
| 4.00 | Centering & Shuttering including Strutting, propping etc. and removal of formowk for
a) Foundation, footings, Bases for columns and mass concrete. | 384 | sqm | 325.02 ₹1,24,807.68 Lowest | 325.5 ₹1,24,992 |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth reatining structure complete as directed by the Engineer Incharge.
A) 110mm dia | 143.5 | RM | 290.56 ₹41,695.36 | 290.28 ₹41,655.18 Lowest |
Tender Value
₹21.5 L
EMD Value
₹43,066
Closing Date
3 Apr 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement to nallah bank near Open Type Bandhara near Sy No 5 11 and 5 12 at Sateri Wada Thane V.P. Dong Thane in Sattari Taluka.
2025_WRD_20896_1
WRD/WDVI/Accts/F.17/TN e 24 /2024-25/864 Line 7 Dated 20/03/2025
Open Tender
Civil Works - Water Works
Item Rate
90 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹43,066
29 Oct 2025
24 Mar 2025
4 Apr 2025
24 Mar 2025
3 Apr 2025
24 Mar 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .