Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC The bidder AXTEL SOLUTION has stood lowest (L1) in the e-Tendering Process. | |
| 2 | L2₹9.0 L+₹10,526.58 (1.18%)Rejected-Finance | L2 | Rejected-Finance Quoted rate found 2nd Lowest (L2). | |
| 3 | L3₹9.1 L+₹18,828.72 (2.12%)Rejected-Finance NORTH CHAKHABANI BALURGHAT DAKSHIN DINAJPUR WEST BENGAL 733101 | BALURGHAT | DAKSHIN DINAJPUR | WEST BENGAL | 733101 | L3 | Rejected-Finance Quoted rate found 3rd Lowest (L3). |
Tender Value
Refer Docs
EMD Value
₹17,900
Closing Date
10 Apr 2021, 12:00 pmClosed
EXECUTIVE ENGG (P.W.D), D/DINAJPUR ELEC DIVN
OFFICE OF THE EXECUTIVE ENGINEER (P.W.D), DAKSHIN DINAJPUR ELECTRICAL DIVISION, BALURGHAT Dakshin Dinajpur - 733101
Construction of Temporary Electrification of Accommodation Centre for CAPF and State Police Force wrt ensuing West Bengal Assembly Election 2021 - for 9 (Nine) Nos Schools under Patiram P.S. in the District of Dakshin Dinajpur as per Annexure-A.
2021_WBPWD_330379_1
WBPWD/EE/DDED/e-NIQ-26/2020-21 (2nd Call)
Open Tender
ELECTRICAL WORKS ORG
Item Rate
5 days
Patiram
Please refer tender documents
6 documents required · 6 mandatory
₹17,900
17 Apr 2021
6 Apr 2021
12 Apr 2021
6 Apr 2021
10 Apr 2021
7 Apr 2021
Amount
(i) Up to 3 days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 9 Nos x 13 No of Days = 117 Nos)
S & providing on hire basis 500V/220V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).
(i) Up to 3 days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 27 Nos x 13 No of Days = 351 Nos)
S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in trench / wall with shadding arrangement dismantling the same & mending good the damage at the end of the program (With PWD approve materials).
(a) 4 core 16 sq. mm. PVC / A cable.
(i) Up to 3 days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 180 Mtrs x 13 No of Days = 2340 Mtrs)
(b) 2 core 4 to10 sq. mm. PVC / A cable.
(i) Up to 3 days -
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1080 Mtrs x 13 No of Days = 14040 Nos)
S & drawing on hire basis 2x1.5 sq. mm. / 4 sq. mm PVC Cu. wire incl. dismantling the same at the end of function.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1800 Mtrs x 13 No of Days = 23400 Mtrs)
S & providing on hire basis 4 Ft. 40 watt Single Tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 360 Nos x 13 No of Days = 4680 Nos)
S & providing on hire basis LED Bulb with necessary accessories.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 360 Nos x 13 No of Days = 4680 Nos)
Supplying & Providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 450 Nos x 13 No of Days = 5850 Nos)
Distribution wiring with 2 x 1.5 sq.mm. PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same at the end of the program. (Without individual control switch).
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1170 Pts x 13 No of Days = 15210 Pts)
Supplying & Providing on 600 mm sweep Air Circulator.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 18 Nos x 13 No of Days = 234 Nos)
Supplying & Providing on hire basis ( 3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan).
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 162 Pcs x 13 No of Days = 2106 Pcs.)
S & providing on hire basis 250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on existing wooden / bamboo or on wall incl. gear box & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 90 Nos x 13 No of Days = 1170 Nos)
Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same at the end of the program.
(i) Upto 3 Days.
(ii) Next 13 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 27 Nos x 13 No of Days = 351 Nos)
Hiring & Installation charges for the following capacity DG Sets. incl. All accessories.
(i) 5 KVA DG (Single phase) for 9 Nos School for 16 days. (No of Days 16 x no. of DG 2 x No. of school = 9) = 288 Nos.
To and fro Transportation charges incl. loading & unloading.
(i) 5 KVA DG sets and electrical equipments for 9 Nos of School.
Charge of Electrical Supervisor 01 No. for each shift x 3 shift per day for 16 days for each of 9 Nos School. (Qty. = No of shift 3 x No of days 16 x no of School 9 = 432 Shifts)
Fuel consumption for DG Set with during consumption.
(i) For 5 KVA DG Set. @ 2 Ltr./DG/Hr. (Qty. = No. of DG 18 x no of days 16 x no of working hours 4 = 1152 Hrs.).
N.B.: 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 15.00). 2) Bidders are requested to quote Rate for the Items Sl. Nos. 01.01, 02.01, 03.02, 3.05, 04.01, 05.01, 06.01, 07.01, 08.01, 09.01, 10.01, 11.01, 12.01, 13.01, 14.01, 15.00 & 16.01 as spelt out in the BOQ . The rate for the items Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02 & 12.02 will be calculated automatically. 3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.
MS MAATRI ELECTRICAL AND CO
CHOUDHURY ELECTRICAL.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .