Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 CrAccepted-Finance VILLAGE SAWARA POST AURAI DISTRICT BHADOHI | AURAI | BHADOHI | UTTAR PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹13.2 Cr+₹2.3 L (0.17%)Rejected-Finance G T ROAD MADHAULI CHURAMANPUR BHULLANPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | L2 | Rejected-Finance L2 | |
| 3 | L2₹13.2 Cr+₹2.3 L (0.17%)Rejected-Finance 580 SHREE DAMUPRIYA SHIVPURI MARG ALAPUR PRAYAGRAJ UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211001 | L2 | Rejected-Finance L2 | |
| 4 | L2₹13.2 Cr+₹2.3 L (0.17%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 5 | L3₹14.3 Cr+₹1.1 Cr (8.42%)Rejected-Finance MIRZAPUR UTTAR PRADESH | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ASHTBHUJA CONSTRUCTION L2 | M/S MAHENDRA KUMAR SINGH L1 | M/S SATYA PRAKASH SINGH CONSTRUCTION CO L2 | MS RAKESH KUMAR PANDEY L3 | M/s Mishra Construction Company Pro. Ratnesh Kumar Mishra L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 8,342.1 | Cum | 51 ₹4,25,447.1 | 40 ₹3,33,684 Lowest | 51 ₹4,25,447.1 | 55.2 ₹4,60,483.92 | 51 ₹4,25,447.1 |
| 2.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 303.1 | 21,383.1 | Cum | 170 ₹36,35,127 | 100 ₹21,38,310 Lowest | 170 ₹36,35,127 | 184 ₹39,34,490.4 | 170 ₹36,35,127 |
| 3.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 8,342.1 | Cum | 1,572.5 ₹1,31,17,952.25 Lowest | 1,650 ₹1,37,64,465 | 1,572.5 ₹1,31,17,952.25 Lowest | 1,702 ₹1,41,98,254.2 | 1,572.5 ₹1,31,17,952.25 Lowest |
| 4.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 31,050 | Sqm. | 2.98 ₹92,373.75 | 2 ₹62,100 Lowest | 2.98 ₹92,373.75 | 3.22 ₹99,981 | 2.98 ₹92,373.75 |
| 5.00 | Providing, laying and spreading wet mix mecadam Material on prepared sub base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 13,765.5 | Cum | 2,465 ₹3,39,31,957.5 Lowest | 2,700 ₹3,71,66,850 | 2,465 ₹3,39,31,957.5 Lowest | 2,668 ₹3,67,26,354 | 2,465 ₹3,39,31,957.5 Lowest |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 7,590 | Cum | 2,082.5 ₹1,58,06,175 Lowest | 2,150 ₹1,63,18,500 | 2,082.5 ₹1,58,06,175 Lowest | 2,254 ₹1,71,07,860 | 2,082.5 ₹1,58,06,175 Lowest |
| 7.00 | Providing and applying primer coat with bitumen emulsion SS-2 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MoRTH Specification 5.1 (502). | 75,900 | Sqm. | 62.9 ₹47,74,110 Lowest | 70.54 ₹53,53,986 | 62.9 ₹47,74,110 Lowest | 68.08 ₹51,67,272 | 62.9 ₹47,74,110 Lowest |
| 8.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 3,036 | cum | 13,600 ₹4,12,89,600 Lowest | 14,155 ₹4,29,74,580 | 13,600 ₹4,12,89,600 Lowest | 14,720 ₹4,46,89,920 | 13,600 ₹4,12,89,600 Lowest |
| 9.00 | Drain Earth work In excation in foundation (SI. No. 251) | 867 | cum | 93.5 ₹81,064.5 | 80 ₹69,360 Lowest | 93.5 ₹81,064.5 | 101.2 ₹87,740.4 | 93.5 ₹81,064.5 |
| 10.00 | Drain Cement concrete 1:4:8 (SI. No. 281) | 144.5 | cum | 4,165 ₹6,01,842.5 | 3,000 ₹4,33,500 Lowest | 4,165 ₹6,01,842.5 | 4,508 ₹6,51,406 | 4,165 ₹6,01,842.5 |
Tender Value
₹15.9 Cr
EMD Value
₹30 L
Closing Date
30 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
Widening and Strengthening of Madhosingh Mahathua Asnaav Mushilatpur road
2026_CEMRZ_1193606_1
4493/53M-MZP/2026-27 Date- 30.09.2026
Open Tender
Civil Works
Item Rate
270 days
Bhadohi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,720
Yes
₹30 L
Yes
SE MZP CIRCLE PWD MIRZAPUR
13 Nov 2026
9 Oct 2026
30 Oct 2026
9 Oct 2026
30 Oct 2026
9 Oct 2026
27 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 8,342.1 | Cum | 1 | ₹8,342.1 |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 303.1 | 21,383.1 | Cum | 1 | ₹21,383.1 |
| - | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 8,342.1 | Cum | 100 | ₹8,34,210 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 31,050 | Sqm. | 100 | ₹31,05,000 |
| - | Providing, laying and spreading wet mix mecadam Material on prepared sub base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 13,765.5 | Cum | 100 | ₹13,76,550 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 7,590 | Cum | 100 | ₹7,59,000 |
| - | Providing and applying primer coat with bitumen emulsion SS-2 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MoRTH Specification 5.1 (502). | 75,900 | Sqm. | 100 | ₹75,90,000 |
| - | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 3,036 | cum | 100 | ₹3,03,600 |
| - | Drain Earth work In excation in foundation (SI. No. 251) | 867 | cum | 100 | ₹86,700 |
| - | Drain Cement concrete 1:4:8 (SI. No. 281) | 144.5 | cum | 100 | ₹14,450 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.74 MB
Tendernotice_3.pdf
PDF • 1.13 MB
Tendernotice_4.pdf
PDF • 0.76 MB
BOQ_2252792.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .