Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹11.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.4 L+₹23,412.70 (2.10%)Admitted-Fee/PreQual/Technical/Finance | +2.10% | ₹11.4 L+₹23,412.70 (2.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.7 L+₹56,859.42 (5.10%)Admitted-Fee/PreQual/Technical/Finance | +5.10% | ₹11.7 L+₹56,859.42 (5.10%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.1 L
EMD Value
₹27,880
Closing Date
10 Sept 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
11KV LINE CONSTRUCTION USING HT ABC UNDER ELECTRICAL SECTION, THOLICODE OF ELECTRICAL DIVISION, NEDUMANGAD UNDER ELECTRICAL CIRCLE KATTAKADA
2026_KSEB_866898_1
EE/PMU(KTDA)/ET-17/2026-27 dated 31.08.2026
Open Tender
Electrical Works
Percentage
120 days
Tholicode
6 documents required · 6 mandatory
₹5,900
₹27,880
16 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
31 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 3 | No | 8,735.82 | ₹26,207.46 |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 24 | No | 564.55 | ₹13,549.2 |
| 3 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 80 | No | 1,373.73 | ₹1,09,898.4 |
| 4 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 3 | No | 2,795.55 | ₹8,386.65 |
| 5 | Drilling hole of various sizes on existing Channel/Cross Arm. | 27 | No | 16.73 | ₹451.71 |
| 6 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 3 | No | 4,245.59 | ₹12,736.77 |
| 7 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 120 | No | 3,274.36 | ₹3,92,923.2 |
| 8 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 126 | No | 762.14 | ₹96,029.64 |
| 9 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 92 | E | 164.67 | ₹15,149.64 |
| 10 | Erection of suspension clamp for 11KV ABC of any size | 90 | E | 164.67 | ₹14,820.3 |
stage.html
html • 0.02 MB
finance_1467646.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID17.pdf
Tender Documents • 0.35 MB
BOQ_1467646.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .