| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | ₹2.4 L | L1 | Accepted-Finance Due to lowest rate |
| 2 | L2₹2.4 L+₹3,923.48 (1.67%)Rejected-Finance | ₹2.4 L+₹3,923.48 (1.67%) | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹2.4 L+₹5,962.20 (2.53%)Rejected-Finance | ₹2.4 L+₹5,962.20 (2.53%) | L3 | Rejected-Finance Due to highest rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-The contractor has submit an applicaton on dated 06/08/2026 vide which he has requested to do not open his tender due to quoted some wrong rates. Hence the above bidder is not eligible. |
| Sl No | Description | Qty | Unit | Vakil Singh Govt Contractor L1 | AMAN JAMWAL L2 | RANJIT SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kind of soil such as pick work jumper work, blasting soft and hard rock, conglomirate, upto all leads and lifts stacked the excavated soil not more then 3 meters. clear from the edge of the excavation and then returning the stacked soil consolidating each depossited layer by ramming and watering and then disposing of all surplus excavated earth as per the direction of Engineer-In-Charge with in all leads and Lifts. | 6.16 | cum | 300 ₹1,848 Lowest | 310 ₹1,909.6 | 315 ₹1,940.4 |
| 2.00 | Providing stone/boulder filling under floors/behind retaining walls & florring complete in all leads and lifts. | 48.9 | cum | 1,800 ₹88,020 Lowest | 1,800 ₹88,020 Lowest | 1,810 ₹88,509 |
| 3.00 | Providing and laying cement concrete 1:4:8(1 cement: 4sand:8graded stone agg. 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts. | 1.43 | cum | 5,000 ₹7,150 Lowest | 5,000 ₹7,150 Lowest | 5,000 ₹7,150 Lowest |
| 4.00 | providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering,strutting and propping etc. with wooden batten and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:- | 57.3 | Sqm | 280 ₹16,044 Lowest | 280 ₹16,044 Lowest | 282 ₹16,158.6 |
| 5.00 | Providing and laying cement concrete 1:2:4(1 cement: 2sand: 4graded stone agg.20mm nominal size)and curing complete excluding cost of form work in reinforcement for reinforced cement concrete work in foundation footing basis of columns and like mess concrete. | 8.96 | cum | 8,000 ₹71,680 Lowest | 8,000 ₹71,680 Lowest | 8,000 ₹71,680 Lowest |
| 6.00 | Providing and laying Cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering in Foundations and plinth. Within all leads and lifts. | 2.6 | cum | 6,000 ₹15,600 Lowest | 6,000 ₹15,600 Lowest | 6,000 ₹15,600 Lowest |
| 7.00 | Prov.Laying Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) as per the direction of Engineer-in-Charge with in all leads and lifts. | 351.08 | Kg | 100 ₹35,108 Lowest | 111 ₹38,969.88 | 115 ₹40,374.2 |
Tender Value
₹2.0 L
EMD Value
₹4,017
Closing Date
3 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
SH-C/O RCC Linning in pump house and C/O UGSR Tank in flooring and floor Path Prei Parsel).
2026_HPIPH_139851_1
SHP/KNG15-754/EA-I/NIT/2026- 3736-85 dt 22/07/2026
Open Tender
Civil Works
Item Rate
90 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Executive Engineer
₹4,017
24 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
24 Jul 2026 - 3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work in all kind of soil such as pick work jumper work, blasting soft and hard rock, conglomirate, upto all leads and lifts stacked the excavated soil not more then 3 meters. clear from the edge of the excavation and then returning the stacked soil consolidating each depossited layer by ramming and watering and then disposing of all surplus excavated earth as per the direction of Engineer-In-Charge with in all leads and Lifts. | 6.16 | cum | - | - |
| 2 | Providing stone/boulder filling under floors/behind retaining walls & florring complete in all leads and lifts. | 48.9 | cum | - | - |
| 3 | Providing and laying cement concrete 1:4:8(1 cement: 4sand:8graded stone agg. 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts. | 1.43 | cum | - | - |
| 4 | providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering,strutting and propping etc. with wooden batten and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:- | 57.3 | Sqm | - | - |
| 5 | Providing and laying cement concrete 1:2:4(1 cement: 2sand: 4graded stone agg.20mm nominal size)and curing complete excluding cost of form work in reinforcement for reinforced cement concrete work in foundation footing basis of columns and like mess concrete. | 8.96 | cum | - | - |
| 6 | Providing and laying Cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering in Foundations and plinth. Within all leads and lifts. | 2.6 | cum | - | - |
| 7 | Prov.Laying Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) as per the direction of Engineer-in-Charge with in all leads and lifts. | 351.08 | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
6and8form.pdf
Tender Documents • 0.80 MB
termsandcondtions.pdf
Tender Documents • 0.34 MB
BOQ_207299.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .