Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹3,892
Closing Date
2 Jun 2026, 4:30 pmClosed
DHONE MUNICIPALITY
Dhone
Construction of CC Drain from E.Pole no.SR-VII/4 to E.Pole no.SR-III/A.10.1(Super chicken center) in ward no.22 ,Dhone Municipality.
937022
32/2025-26/General Fund/E1
OPEN - NCB
Public Health Engineering Works
NANDYAL
7 documents required · 6 mandatory · 1 optional
₹138
₹3,892
25 May 2026
25 May 2026
25 May 2026
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 as directed by the Engineer in charge of the work
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30, 20mm Graded metal un-reinforced, at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade cement or any other type as per Clause 1501.2.2 and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scared and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant,near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Note: Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS Code
Carting of excavated Earthwork with a lead of 1 km, including loading & unloading and conveyance charges for machines per kilometer for transporting materials by tippers and tractors etc., complete as directed by the Engineer-in-charge of work.
Asst. Engineer Dhone Municipality
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 / MORTH
Earth work excavation in soil as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305/ 304 MORTH Manual Means and as directed by the Engineer-in-Charge
Collection,Supply, and filling of Crusher stone dust from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Providing Vibrated Cement Concrete M15 using 20mm metal and using concrete mixer as approved by the department including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational chrages etc., complete as per sepcifications, drawings and as directed by the engineer in charge (Bed & Side wall)
Carting of excavated Earthwork with a lead of 1 km, including loading & unloading and conveyance charges for machines per kilometer for transporting materials by tippers and tractors etc., complete as directed by the Engineer-in-charge of work. (80% of earth work qty)
Asst. Engineer Dhone Municipality
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
ACCOMPANY REPORT 14.20 Road.doc
TENDER_DOCUMENT • 0.04 MB
BOQ.....xlsx
TENDER_DOCUMENT • 1.69 MB
CC Road from(Goragandla shanker goud) house to Tr nagar Strom water drain.xls
TENDER_DOCUMENT • 0.82 MB
LOGO.doc
TENDER_DOCUMENT • 0.09 MB
NIT...doc
TENDER_DOCUMENT • 0.13 MB
Revised Dhone DATA 2025-26 (04-11-25) (2).xlsx
TENDER_DOCUMENT • 1.34 MB
TS Letter.doc
TENDER_DOCUMENT • 0.04 MB
BOQ.xlsx
TENDER_DOCUMENT • 1.69 MB
NIT.._1.doc
TENDER_DOCUMENT • 0.13 MB
SR NAGAR 22WARD Super Chiken Center.xlsx
TENDER_DOCUMENT • 0.43 MB
Download all tender documents and submit your bid