Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
7 Jul 2026, 6:00 pmClosed
Executive Engineer K B C Division No 1 1 Radhanpur 385340
Maintenance & Repairs work of Radhanpur Branch Canal ch 0 km to 11.469 km Slice-1 by Repairing of Lining Constructing of Dowel etc offtaking from NMC
314542
07 of 2026 2027
Open
Civil Works - Canal
Works
Patan
5 documents required · 5 mandatory
₹4,248
Executive Engineer, K.B.C Dn.No.1 1, Radhanpur
₹2.6 L
16 Jun 2026
16 Jun 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work: Maintenance & Repairs work of Radhanpur Branch Canal ch 0 km to 11.469 km (Slice-1) by
Repairing of Lining,Constructing of Dowel etc offtaking from NMC.
Sr.No. Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Dismantling the C.C. lining including
including disposing off the dismentalled Sqmt 914.85 115.50
materials as directed etc. complete. 7.50 cm
Trimming of the canal sectionmanually for
preparing sub grade for laying cement Sqmt
Cleaning the slope lining by removing all
3 3 dirt, dust, soil etc.deposited on slope lining
by providing labours with necessary
equipmet incluiding disposing the stuff
outside the canal with all lead and lift as
directed by engineer-In-charge
Clearing silt from canal /drain bed by digging
4 4 the same to the required bed level and
gradiant incl. depositing the excavated earth
regularly in spoil bank for utilising the same
lor preparing the bund after breaking clods as cum 4424.723 266.20
and where directed for lead up to 200 m &
lift up to 3 m as under (excluding weed
cutting). (d) For canal above 500 Cusecs (f)
Additional lift of 3.0 mt
proving & fixing MS welded mesh jali of
mm dia 65mm x 65mm including cutting in
required sizes, fixing in canal prism etc.
complited by Engineer in charge.
Providing and laying plain / reinforced cement
concrete lining with concrete of cement, sand
and metal in nominal mix 1:2:4(M-15) in bed,
side slopes and curvature including batching,
mixing, transporting, placing, vibrating,
smooth finishing, curing including dewatering
6 6 where required for maintance of canal Sqmt
Patches.5 cm thick lining in bed,side slopes -
with water curing. ( MACHINARY BASED
,WITH OUT PAVER )
Providing and laying plain/reinforced cement
concrete lining of M 15 (MSA 20 mm) in bed,
side slopes and curvature including batching,
mixing, transporting, placing, vibrating,
smooth finishing, curing including dewatering Sqmt
where required. (MACHINERY BASED by
"FLORI" - WITHOUT PAVER
MEMBRANE CURING) 10 cm thick lining
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including
depositing the excavated stuff in uniform 7.92
8 8 layers in banks or as and where directed etc. Cum
complete for lead up to 500m and all lift.
(BY MACHINERY) Excluding dewatering.
Providing and casting in situ concrete of M15
high grade for R.C.C.,kerb incl. Form work Cum
curing, finishing etc.complete ( MSA-20)
TOTAL COST IN RS.
I/We am/are willing to carry out the work at… ................... % above/belows percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my
/ourtender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
SECURITIES AND OTHER FORMS
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the
“The Bidder”) has submitted his bid Dated ------------------------ (Date) for the
construction of ------------- (Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We -------------------------------------------------
(name of Bank) of----------------------------------------------- (name of country) having our
registered office at -------------------------------------------------------( hereinafter called
“the bank”) are bound unto --------------------------------------------(name of Employer)
(hereinafter called “The Employer”) in the sum of ------------------------------------------ *
for which payment well and truly to be made to the said Employer the Bank itself, his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ---------------------- day of --------
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity
specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the Employer
during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with the
Instructions to Bidders, if required; or
A. Fails or refuse to furnish the Performance Security, in accordance with the
Instructions to Bidders; or
B. does not accept the correction of the Bid Price pursuant to Clause
(Correction of Errors)
We undertake to pay to the Employer up to the above amount upon
receipt of his first written demand, without the employer having to substantiate
his demand, provided that in his demand the Employer will note that the
amount claimed by him is due to him owing to the occurrence of one or any of
the three conditions, specifying the occurred conditions or conditions.
This Guarantee will remain in force up to and including the date ------------------- **
days after the deadline for submission of Bids as such the deadline is stated in the
Instructions to Bidders or as it may be extended by the Employer, notice of which
extension (s) to the Bank is hereby waived. Any demand in respect of this
guarantee should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in
Clause 16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should be
inserted by the Employer before the Bidding documents are issued.
PERFORMANCE SECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in pursuance of
--------- (name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
you on behalf of the Contractor, up to a total of ------------------------------------------
(amount of guarantee)* ----------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ----------------------------------------
(amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor
before presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of
the Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive notice of any
such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the
Defect Liabilities period.
Signature and Seal of the guarantor -----------------------------
*An amount shall be inserted by the Guarantor, representing the percentage the
Contract price specified in the Contract denominated in Indian Rupees.
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance of
--------- (Name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
you on behalf of the Contractor, up to a total of ------------------------------------------
(amount of guarantee) ----------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ----------------------------------------
(amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor
before presenting is with the demand
We further agree that no change or addition to or other modification of the terms of
the Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive notice of any
such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor -----------------------------
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, -------------------------------
------------------- (name and address of Contractor) (hereinafter called “the
Contractor”) shall deposit with --------------------------------------------------------- (name of
Employer) a bank guarantee his proper and faithful performance under the said
Clause of the Contract in an amount of --------------------------- (amount of Guarantee)* -
We, the---------------------------------- (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary
obligator and not as Surety merely, the payment to ----------------------------------------
(name of Employer) on his first demand without whatsoever right of obligation on
our part and without his first claim to the Contractor, in the amount not exceeding ---
We further agree that no change or addition to or other modifications of the terms of
the Contractor or Works to be performed thereunder or of any of the Contract
documents which may be made between --------------------------------- (name of
Employer) and the Contractor, shall in any way release us from any liability under
this guarantee, and we hereby waive notice of any such change, addition or
This guarantee shall remain valid and in full effect from the date of the
advance payment under the Contract until -------------------------------------- (name of
employer) receives full repayment of the same amount from the contractor.
Signature and Seal
Name of Bank/ Financial Institution
* An amount shall be inserted by that Bank or Financial Institution representing the
amount of the Advance Payment, and denominated in Indian Rupees.
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number, as
given in the Instructions to Bidders) for the Contract Price of Rupees
( ) (amount in words and figures) as corrected and modified in
accordance with the Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in
para 34.1 of ITB for an amount equivalent to Rs. within 10 days of the receipt
of this letter of acceptance up to beyond 60 days from the date of expiring of the
Liabilities period. i.e. up to and the Additional Performance Security for an
amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Date i.e. up to and sign the contract, failing which
action as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature
Name and title of Signatory
Name of Employer
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as
corrected and modified in accordance with the Instructions to Bidders, if corrections or
modifications have not been affected.
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause 34.1 and
signing of the Contract for the construction of
at a bid Price of Rs.
You are hereby instructed to proceed with the execution of the said works in
accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory authorized
To sign on behalf of Employer)
This agreement, made on the day of between
_ (name and address of Employer) (Hereinafter called “the
Employer) and (name and address of
contractor) hereinafter called “the Contractor” of the other part.
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the
employer has accepted the Bid by the Contractor for the execution and completion of
such works and the remedying of any defects therein, at a cost of Rs.
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are
respectively assigned to them in the conditions of contract hereinafter referred to
and they shall be deemed to form and be read construed as part of this
2. In Consideration of the payment to be made by the Employer to the contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to
executive and complete the works and remedy any defects therein in conformity
in all aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the
execution and completion of the works and the remedying the defects wherein
contract price or such other sum as may become payable under the provisions of
the Contract at the times and in the manner prescribed by the contract.
4. The Following documents shall be deemed to form and be ready and construed as
part of this Agreement viz
i) letter of Acceptance
ii) Notice to proceed with the works:
iii) Contractor’s Bid
iv) Conditions of contract: General and Special
v) Contract Data
vi) Additional conditions
viii) Bill of Quantities and
ix) Any other documents listed in the Contract
data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be
executed the day and year first before written
The Common seal of
Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
…………………………………………………..……………………………….. would invest a minimum cash up
to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
I, the undersigned do hereby undertake that our firm M/s ……………………………………
……………..……………………………….. agree to abide by this bid for a period ................................... days
for date fixed for receiving the same and it shall be binding on us and may be accepted at
any time before the expiration of that period.
(Signed by an Authorized officer of the firm)
Title of officer
DOCUMENTS TO BE FURNISHED BY BIDDER
DOCUMENTS TO BE FURNISHED BY BIDDER
Documents to be furnished by the Bidder
(A) Minimum requirements for the evaluation of preliminary stage:
Tender Fee/ Bid Document Fee
EMD or Valid Exemption Certificate of Appropriate Class of Registration of
Approved Contractors (The validity of EMD should be 165 days from the
date of uploading of BG/FDR documents on n-code)
Registration Certificate of Class “B and above”.
Note: All the above documents shall be uploaded electronically as
prescribed in tender document, otherwise bid shall be treated as non-
(B) Minimum requirements for the evaluation of Financial Stage:
Form of Bid as specified in Section-6
Annual Financial Turnover Certificate for last 5 years as per format
prescribed as Form-E in Qualification Information certified by CA.
For Value of B in Bid capacity, bidder must submit online a self-
certified copy of statement for existing commitments and ongoing
works in prescribed format
Other Documents, as required
• If necessary, DTP Approving Authority may add any other document in the
above list as per the requirement/ scope of the work.
• Prior Approval from the Competent Authority of SSNNL, must be taken for any
type of deviation in the Approved Standard Bidding Document, if required.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD RBC 1.pdf
Technical Specification.pdf
TYPICAL CROSS SECTION OF BRANCH.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .