| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.3 LAccepted-AOC KUMARAKOM VAIKOM | KOTTAYAM | KERALA | 686001 | ₹51.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹57.3 LRejected-AOC | ₹57.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Joji Joseph L1 | K M DAVID L2 |
|---|---|---|---|---|---|
| 1.00Outer bund strengthening | |||||
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 15 | each | 444.5 ₹6,667.50 | 495 ₹7,425 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 127.8 | cum | 103.13 ₹13,180.01 | 230 ₹29,394 |
| 1.00 | OD30487/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o
material and labour charges etc. complete as per direction of departmental officers at site. | 127.8 | cum | 2,500 ₹3.2 L | 3,190 ₹4.1 L |
| 1.00 | OD30485/2025-2026:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost, conveyance, labour charges etc complete | 474 | metre | 116.4 ₹55,173.60 | 130 ₹61,620 |
| 1.00 | OD30486/2025-2026:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through soft to medium clay soil strata
including all hire charges and labour and all other appliances necessary for pile driving down
after pointing the bottom end. Details for one post of 6m long 15 numbers per day
6X15=90m Details for 90m length. | 395 | metre | 152.5 ₹60,237.50 | 170 ₹67,150 |
| 1.01 | OD30484/2025-2026:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces
of required length and tied to the post with iron wires etc complete as per standard
specification. | 254.1 | metre | 84.18 ₹21,390.14 | 90 ₹22,869 |
| 1.01 | OD30488/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 356.04 | cum | 4,891 ₹17.4 L | 4,605 ₹16.4 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 109.37 | sqm | 311.63 ₹34,083.60 | 340 ₹37,186.48 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.01 | cum | 8,464.44 ₹2.0 L | 9,450 ₹2.3 L |
Tender Value
₹63.6 L
EMD Value
₹50,000
Closing Date
21 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER K D DIVISION THANNERMUKKOM
GENERAL-KP-FMP-Improvement works to Mattom vilanguchira padasekharam in Arppookkara Panchayath in Ettumanoor LACGeneral Civil Work
2026_Irrig_835982_1
33/EE/KD/2025-26
Open Tender
Civil Works - Others
365 days
Arppookara Kottayam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
13 May 2026
12 Feb 2026
24 Feb 2026
12 Feb 2026
21 Feb 2026
12 Feb 2026
Outer bund strengthening
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD30487/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
OD30485/2025-2026:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost, conveyance, labour charges etc complete
OD30486/2025-2026:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD30484/2025-2026:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
OD30488/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
OD46867/2025-2026:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD46868/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
Bund formation
OD34035/2025-2026:Bund formation: Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m:All kinds of soil(2.2.1-2.4-2.5)
OD34454/2025-2026:Strengthening the earthen bund using coir geo-textiles (740GSM) etc complete including conveyance and all other incidental charges as per the directions of the departmental officers at site
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1406792.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Tender Documents • 2.78 MB
BOQ_1406792.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid