Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC H NO 1366 3 GALI NO 6 MATA ROAD NEAR HAPPY MODEL SCHOOL RAJIV NAGAR GURGAON 122 001 HARYANA | GURGAON | GURGAON | HARYANA | 122001 | ₹1.1 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.1 Cr+₹72,902 (0.65%)Rejected-AOC | ₹1.1 Cr+₹72,902 (0.65%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.2 Cr+₹8.0 L (7.20%)Rejected-AOC | ₹1.2 Cr+₹8.0 L (7.20%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹1.3 Cr+₹14.1 L (12.6%)Rejected-AOC 54 AKASH DEEP COLONY CHAKRATA ROAD DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.3 Cr+₹14.1 L (12.6%) | L4 | Rejected-AOC Rejected |
| 5 | Rejected-Technical VILLAGE POST KORUWA CHAKRATA DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Rejected-Technical Rejected due to Contractor is not fulfiling eligibility criteria |
| Sl No | Description | Qty | Unit | M/S SURAT SINGH AND SONS L4 | PAWAN KUMAR L1 | AYUSH CONSTRUCTION L2 | P R Constructions L3 |
|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE A PART-I (BUILDING WORK) | |||||||
| 2.00 | Construction of compactor room for record office on permanent specification (Double storey) with reception room, veranda & stair case complete all as specified and as shown on drawings. | 1 | Each Block | 1,02,00,000 ₹1,02,00,000 | 89,89,989 ₹89,89,989 | 86,66,666 ₹86,66,666 Lowest | 96,35,869 ₹96,35,869 |
| 3.00 | SCHEDULE A PART - II (Internal Electrification) for details refer Sch A in pdf folder | 1 | Each | 1,45,000 ₹1,45,000 | 1,10,000 ₹1,10,000 Lowest | 1,26,666 ₹1,26,666 | 1,29,870 ₹1,29,870 |
| 4.00 | S&F LED inverter bulb 9 watt WW retrofit type works on AC normal mode and DC supply in inverter mode with inbuilt battery backup upto 4 hrs, high efficiency high lumens output 2649.47 complete all as specified and directed. | 8 | Each | 2,500 ₹20,000 | 650 ₹5,200 Lowest | 888 ₹7,104 | 2,500 ₹20,000 |
| 5.00 | SCHEDULE A PART - III (Road, Path & Hardstanding) for details refer pdf folder | 1 | Each | 2,85,000 ₹2,85,000 | 2,89,976 ₹2,89,976 | 2,22,222 ₹2,22,222 Lowest | 3,78,525 ₹3,78,525 |
| 6.00 | SCHEDULE A PART - IV (Retaining Wall) for details refer pdf folder | 1 | Each | 14,50,000 ₹14,50,000 | 12,50,000 ₹12,50,000 Lowest | 13,33,333 ₹13,33,333 | 12,54,968 ₹12,54,968 |
| 7.00 | SCHEDULE A PART V (Area Drainage) for details refer pdf folder | 1 | Each | 1,85,000 ₹1,85,000 | 1,78,500 ₹1,78,500 | 1,77,777 ₹1,77,777 | 1,25,333 ₹1,25,333 Lowest |
| 8.00 | SCHEDULE A PART VI (Lighting Conductor) for details refer pdf folder | 1 | Each | 75,000 ₹75,000 | 65,000 ₹65,000 Lowest | 66,666 ₹66,666 | 96,500 ₹96,500 |
| 9.00 | SCHEDULE A PART VII (External Electrification) for details refer pdf folder | 1 | Each | 1,25,000 ₹1,25,000 Lowest | 1,25,800 ₹1,25,800 | 1,33,333 ₹1,33,333 | 1,28,652 ₹1,28,652 |
| 10.00 | Supply & laying of Outer dia of 40 mm and inner dia 32 mm DWC (double Wall corrugated) HDPE polyethiline pipe ISI marked including couplers, bends, cap etc. with smooth internal and profiled external surface for non pressure under ground cable complete all as secified and directed. | 320 | RM | 250 ₹80,000 Lowest | 450 ₹1,44,000 | 1,555 ₹4,97,600 | 600 ₹1,92,000 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
19 Feb 2026, 6:00 pmClosed
CWE Dehradun
HQ CWE Dehradun
CONSTRUCTION OF COMPACTOR ROOM FOR STORAGE OF DOCUMENTS AT RECORDS SFF AT CHAKRATA
2025_MES_728076_2
0127/CHK/E8
Open Tender
Civil Works
Lump-sum
365 days
Chakrata
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
AGE (I) Chakrata
₹1.9 L
Yes
26 May 2026
30 Jan 2026
21 Feb 2026
30 Jan 2026
19 Feb 2026
13 Feb 2026
SCHEDULE A PART-I (BUILDING WORK)
Construction of compactor room for record office on permanent specification (Double storey) with reception room, veranda & stair case complete all as specified and as shown on drawings.
SCHEDULE A PART - II (Internal Electrification) for details refer Sch A in pdf folder
S&F LED inverter bulb 9 watt WW retrofit type works on AC normal mode and DC supply in inverter mode with inbuilt battery backup upto 4 hrs, high efficiency high lumens output 2649.47 complete all as specified and directed.
SCHEDULE A PART - III (Road, Path & Hardstanding) for details refer pdf folder
SCHEDULE A PART - IV (Retaining Wall) for details refer pdf folder
SCHEDULE A PART V (Area Drainage) for details refer pdf folder
SCHEDULE A PART VI (Lighting Conductor) for details refer pdf folder
SCHEDULE A PART VII (External Electrification) for details refer pdf folder
Supply & laying of Outer dia of 40 mm and inner dia 32 mm DWC (double Wall corrugated) HDPE polyethiline pipe ISI marked including couplers, bends, cap etc. with smooth internal and profiled external surface for non pressure under ground cable complete all as secified and directed.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.77 MB
W4.pdf
Additional Documents • 7.42 MB
BOQ_840711.xls
BOQ • 0.31 MB
W5.pdf
Additional Documents • 5.91 MB
W1.pdf
Additional Documents • 9.17 MB
W2.pdf
Additional Documents • 9.06 MB
SITEPLAN.pdf
Additional Documents • 4.26 MB
AluminiumSlidingWindow.pdf
Additional Documents • 8.63 MB
Tenderdoccomproom.pdf
Tender Documents • 4.86 MB
W3.pdf
Additional Documents • 8.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .