Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.2 LAccepted-AOC 205 2ND FLOOR VARDHMAN CHAMBER LL 0 VIKASPURI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | L1 | Accepted-AOC Lowest Bid Accepted | |
| 2 | L2₹98.9 L+₹2.7 L (2.85%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L2 | Rejected-Finance Not Being Lowest Bidder | |
| 3 | L3₹1.0 Cr+₹7.2 L (7.51%)Rejected-Finance D NO 5 13 24 1 BEHIND SAHUWALA CYLINDERS IDA AUTONAGAR VISAKHAPATNAM 530 012 | VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | L3 | Rejected-Finance Not Being Lowest Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Being approval of OEM by MES not uploaded |
| Sl No | Description | Qty | Unit | Escon Elevators Pvt Ltd L2 | INDUSTRIAL ENGINEERING SYSTEMS L3 | Evaan Elevators Pvt. Ltd L1 |
|---|---|---|---|---|---|---|
| .10Phase-I: Schedule "A" Part - I [Special repairs and Replacement of old unserviceable Lift ]: | ||||||
| 1.00 | Design supplying, installing, testing & commissioning of electrically operated gearless 2000KG capacity Goods lift in GODAVARI bldg 'AB' & 'CD' blocks at NOFRA, NCB(V) to serve 10 floors (i.e. G+9 upper floors) in the existing lift well, confirming to all relevant IS, Speed 1.0 metre/sec with automatic micro stroke button control, microprocessor based controller, simplex selective/ collective control suitable for 3 phase, 415 volts, 50 Hz, AC supply, independent operation with AC Variable Voltage Variable Frequency [AC VVVF] drive control [closed loop] with power saving regenerative drive with suitable gearless motor traction type to serve G+9 floors i.e. 10 stops and 10 landings (Travel/ rise 30M approx) with and without attendant, suitable for synchronised operation, automatic power operated 1700mm centre opening sliding type stainless steel (SS 304) doors 16 gauge haireline finish with vision panel of size 200x800mm covered with 8mm thick toughened plain glass, having full curtain infrared sensor safety (3D infra red sensors for car doors along the full height), UPS based Automatic Rescue Device [ARD] system with [±] 5mm and suitable batteries, Floor position digital indicators in car and all landings with call indicating lights, built in voice announcing system including necessary joists and beams for mounting the machine in machine room including addition/ alteration to existing lift well if any, all necessary civil works required in connection with erection of lift complete all as specified and as directed including dismantling of existing Lifts complete alongwith its accessories of any description and transporting and depositing in MES stores and provision of temporary wooden door shutters at each landing door opening at all floors for safety of the users till installation of new lift complete all as specified and as directed. | 2 | Each Job | 42,64,500 ₹85,29,000 Lowest | 49,00,000 ₹98,00,000 | 43,95,000 ₹87,90,000 |
| 1.10Notes: The lift shall be provided with and including the following: [a] Fireman Switch [b] UPS based Automatic Rescue Device [ARD] during power failure including manual operation provision with suitable capacity of batteries designed for running the lift with full load. The ARD batteries shall be securely housed in a suitable battery box fabricated from 1.5 mm thick mild steel (MS) sheet, duly powder coated for corrosion resistance with an insulating mat provided inside to ensure electrical safety and prevent direct contact between the batteries and the metallic surface with suitable locking arrangemement. [c] Battery operated emergency light [LED Ceiling Fitting] alarm [speaker for emergency alarm system to be fixed] and stop button in car with rechargeable arrangement for battery. [d] LED light fitting 5 Watts x 8 Nos. recessed mounted in false ceiling. [e] Provision of two axial flow fans suitable for recessed mounting in false ceiling. [f] Provision of 5 mm thick aluminium chequered plate in flooring for lift car. [g] Nonstop button/ independent operation. [h] Over load warning indicator in COP with voice announciation and overload protection/ tripping system having relays , etc. [i] Stainless steel sliding doors with front opening for all landings made of 16 gauge 304 grade stainless steel sheet with haireline finish with vision panel of size 200x800mm covered with 8mm thick toughened plain glass. [j] Landing door frames shall be made of 1.5mm thick 304 grade stainless steel sheet. | ||||||
| 1.20[k] All the dimensions of the lift and connected items shall be designed in conformity with IS 14665 standards and the contractor shall submit the design drawing to Accepting Officer for approval before commencementof work. The body shall be SS 304 grade stainless steel of 16 gauge with hairline finish. [l]Provision of built-in voice announciating system for floor announciation, direction of lift movement i.e. going up and going down announciation with background music complete all as specified, directed and approved by Engineer-in-charge/GE. [m] Provision of voice announciating system for ARD operation during power failure complete all as specified, directed and as approved by Engineer-in-charge/GE. [n] Set of three in number limit switches at the bottom and top most position of lift hoist way as specified in IS. [o] A safety instructions plate, duly embossed or laser printed on an SS 304 sheet, shall be riveted inside the lift car at a clearly visible location, displaying the content in English, Hindi, and Telugu with letters of sufficient size to be easily readable by the users as approved by the Enginee-in-Charge [p] Provision of Car Operating Panel (COP) with a dot matrix type display to indicate various information such as floor level, directional arrow, overload, ARD functioning, and other relevant signals, along with push buttons incorporating Braille/raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5 (c) of NBC of India 2016. [q] Provision of suitable phase reversal relays to the controller to protect lift/ equipment against phase reversal, phase failure and low voltage. [r] Provision of 3 way Intercom system with hand set at Ground floor and machine room and built in push to talk(PTT) in COP without hand set. [s] Continuous earthing for machine and equipment with Aluminium strip of size 25x3mm from machine unit and controller panel up to the earth test point provided at the bottom of the bldg. New earth pits-02 Nos shall be provided with 600mmx600mmx6mm GI earth plate electrode and 32x6mm earth strip from earth electrode to test point shall be provided. | ||||||
| 1.30[t] Steel Wire rope of adequate size as per relevant IS and as per manufacturers specification. [u] Other standard fixtures and fittings like guide rails, sheaves, counter weights with guards, buffers, gear unit brakes, control panel, car operational panel, governor, locks, power control and trailing cables complete all as per relevant IS specifications. [v] Main drives and controls shall be high efficient and low power consumption. [w] Lift design, specifications, drawings, manufacturers instructions shall be got approved from Accepting Officer before placing order for procurement. [x] The contractor shall carry third party load testing for each lift installed once in every six months till defect liability period and shall submit staisfactory test results and the rate quoted shall be deemed to included for this provision. [y] Shaft lighting shall be provided in the lift shaft with provision of LED Bulk head light 10W at each floor level with FRLS copper conductor wires drawn through PVC conduit. The wiring for shaft lighting shall be connected and controlled from machine room lighting and it shall be independent from lift supply. [z] Provision of CCTV Camera, 3MP, 2K, made in India with 256GB Micro SD memory card housed in a stainless steel safety grill with small padlock complete fixed in lift car. A separate UPS with battery, suitable to provide a minimum of 15 minutes backup for the CCTV system, shall be installed in the machine room, and the power supply to the CCTV shall be connected from the UPS through an independent cable drawn along with the trailing cable. [aa] Directional signs indicating the location of an accessible lift to transport persons with disabilities at all usable levels shall be provided at a location that is clearly visible from the accessible building entrance. The directional signs shall incorporate a representation of the International symbol of accessibility in compliance with Clause B-6.4.1 of NBC of India 2016. [ab] Provision of Landing Operating Panel (LOP) at all floors with a dot matrix type display to indicate both the floor level and directional arrow, along with push buttons incorporating Braille/raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5 (c) of NBC of India 2016. [ac]Solid Cast Iron blocks only shall be used for Counterweight. No other castings shall be permitted. [ad] The mild steel machined guide rails shall only be permitted.The minimum thickness of guide rails shall be 16 mm for the car and 10 mm for the counterweight. | ||||||
| 1.40Note For Serial Item No. 1 to 1.3: The pre-dispatch factory inspection of the complete material shall be carried out at the manufacturer’s premises by a representative nominated by the Accepting Officer . A report shall be prepared duly signed by the representative of the manufacturer, contractor, and the representative of the Accepting Officer, and shall be approved by the Accepting Officer before dispatching the material from the manufacturer’s factory. The contractor, in liaison with the manufacturer, shall make all necessary arrangements for the inspection and intimate the department at least 15 days prior to the date of inspection. | ||||||
| 2.00Phase-II: Schedule "A" Part – II: [Comprehensive Maintenance of Lifts provided under item No. 1 above after Defect Liability Period]: | ||||||
| 2.10 | Comprehensive Maintenance of Electrically operated Goods Lift of 2000 KG capacity - 02 Nos to serve 10 Floors (i.e G+9 upper floors) as mentioned under revelent item of Phase-I with collective / selective control by carrying out periodical checks, repairs including Replacement of defective spares / accessories etc. and testing as specified and as recommended by the OEM to ensure smooth, safe and efficient functioning during first year after expiry of defects liability period complete all as specified in Particular Specifications and as directed by Engineer-in-Charge. | 24 | Per Month Per Lift | 17,500 ₹4,20,000 | 6,000 ₹1,44,000 Lowest | 11,000 ₹2,64,000 |
| 2.20 | All as per description of item No. 2.1 but for second year after expiry of defects liability period. | 24 | Per MonthPer Lift | 19,000 ₹4,56,000 | 7,500 ₹1,80,000 Lowest | 11,500 ₹2,76,000 |
| 2.30 | All as per description of item No. 2.1 but for third year after expiry of defects liability period. | 24 | Per MonthPer Lift | 20,300 ₹4,87,200 | 9,000 ₹2,16,000 Lowest | 12,000 ₹2,88,000 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
22 Oct 2025, 6:00 pmClosed
Col Shinde SS, Commander Works Engineer
Commander Works Engineers, Station Road, Visakhapatnam - 530 004
SPECIAL REPAIRS FOR REPLACEMENT OF GOODS LIFTS OF GODAVARI BLDG AB AND CD BLOCKS AT NOFRA, NCB AREA UNDER GE U-II VISAKHAPATNAM
2025_MES_731773_1
82596/E8
Open Tender
Civil Works
Item Rate
1260 days
Visakhapatnam
As per NIT
9 documents required · 9 mandatory
₹1,000
Garrison Engineer Utility - II
₹2.2 L
Yes
23 Dec 2025
19 Sept 2025
24 Oct 2025
19 Sept 2025
22 Oct 2025
15 Oct 2025
19 Sept 2025 - 26 Sept 2025
Amount
Phase-I: Schedule "A" Part - I [Special repairs and Replacement of old unserviceable Lift ]:
Notes: The lift shall be provided with and including the following: [a] Fireman Switch [b] UPS based Automatic Rescue Device [ARD] during power failure including manual operation provision with suitable capacity of batteries designed for running the lift with full load. The ARD batteries shall be securely housed in a suitable battery box fabricated from 1.5 mm thick mild steel (MS) sheet, duly powder coated for corrosion resistance with an insulating mat provided inside to ensure electrical safety and prevent direct contact between the batteries and the metallic surface with suitable locking arrangemement. [c] Battery operated emergency light [LED Ceiling Fitting] alarm [speaker for emergency alarm system to be fixed] and stop button in car with rechargeable arrangement for battery. [d] LED light fitting 5 Watts x 8 Nos. recessed mounted in false ceiling. [e] Provision of two axial flow fans suitable for recessed mounting in false ceiling. [f] Provision of 5 mm thick aluminium chequered plate in flooring for lift car. [g] Nonstop button/ independent operation. [h] Over load warning indicator in COP with voice announciation and overload protection/ tripping system having relays , etc. [i] Stainless steel sliding doors with front opening for all landings made of 16 gauge 304 grade stainless steel sheet with haireline finish with vision panel of size 200x800mm covered with 8mm thick toughened plain glass. [j] Landing door frames shall be made of 1.5mm thick 304 grade stainless steel sheet.
[k] All the dimensions of the lift and connected items shall be designed in conformity with IS 14665 standards and the contractor shall submit the design drawing to Accepting Officer for approval before commencementof work. The body shall be SS 304 grade stainless steel of 16 gauge with hairline finish. [l]Provision of built-in voice announciating system for floor announciation, direction of lift movement i.e. going up and going down announciation with background music complete all as specified, directed and approved by Engineer-in-charge/GE. [m] Provision of voice announciating system for ARD operation during power failure complete all as specified, directed and as approved by Engineer-in-charge/GE. [n] Set of three in number limit switches at the bottom and top most position of lift hoist way as specified in IS. [o] A safety instructions plate, duly embossed or laser printed on an SS 304 sheet, shall be riveted inside the lift car at a clearly visible location, displaying the content in English, Hindi, and Telugu with letters of sufficient size to be easily readable by the users as approved by the Enginee-in-Charge [p] Provision of Car Operating Panel (COP) with a dot matrix type display to indicate various information such as floor level, directional arrow, overload, ARD functioning, and other relevant signals, along with push buttons incorporating Braille/raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5 (c) of NBC of India 2016. [q] Provision of suitable phase reversal relays to the controller to protect lift/ equipment against phase reversal, phase failure and low voltage. [r] Provision of 3 way Intercom system with hand set at Ground floor and machine room and built in push to talk(PTT) in COP without hand set. [s] Continuous earthing for machine and equipment with Aluminium strip of size 25x3mm from machine unit and controller panel up to the earth test point provided at the bottom of the bldg. New earth pits-02 Nos shall be provided with 600mmx600mmx6mm GI earth plate electrode and 32x6mm earth strip from earth electrode to test point shall be provided.
[t] Steel Wire rope of adequate size as per relevant IS and as per manufacturers specification. [u] Other standard fixtures and fittings like guide rails, sheaves, counter weights with guards, buffers, gear unit brakes, control panel, car operational panel, governor, locks, power control and trailing cables complete all as per relevant IS specifications. [v] Main drives and controls shall be high efficient and low power consumption. [w] Lift design, specifications, drawings, manufacturers instructions shall be got approved from Accepting Officer before placing order for procurement. [x] The contractor shall carry third party load testing for each lift installed once in every six months till defect liability period and shall submit staisfactory test results and the rate quoted shall be deemed to included for this provision. [y] Shaft lighting shall be provided in the lift shaft with provision of LED Bulk head light 10W at each floor level with FRLS copper conductor wires drawn through PVC conduit. The wiring for shaft lighting shall be connected and controlled from machine room lighting and it shall be independent from lift supply. [z] Provision of CCTV Camera, 3MP, 2K, made in India with 256GB Micro SD memory card housed in a stainless steel safety grill with small padlock complete fixed in lift car. A separate UPS with battery, suitable to provide a minimum of 15 minutes backup for the CCTV system, shall be installed in the machine room, and the power supply to the CCTV shall be connected from the UPS through an independent cable drawn along with the trailing cable. [aa] Directional signs indicating the location of an accessible lift to transport persons with disabilities at all usable levels shall be provided at a location that is clearly visible from the accessible building entrance. The directional signs shall incorporate a representation of the International symbol of accessibility in compliance with Clause B-6.4.1 of NBC of India 2016. [ab] Provision of Landing Operating Panel (LOP) at all floors with a dot matrix type display to indicate both the floor level and directional arrow, along with push buttons incorporating Braille/raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5 (c) of NBC of India 2016. [ac]Solid Cast Iron blocks only shall be used for Counterweight. No other castings shall be permitted. [ad] The mild steel machined guide rails shall only be permitted.The minimum thickness of guide rails shall be 16 mm for the car and 10 mm for the counterweight.
Note For Serial Item No. 1 to 1.3: The pre-dispatch factory inspection of the complete material shall be carried out at the manufacturer’s premises by a representative nominated by the Accepting Officer . A report shall be prepared duly signed by the representative of the manufacturer, contractor, and the representative of the Accepting Officer, and shall be approved by the Accepting Officer before dispatching the material from the manufacturer’s factory. The contractor, in liaison with the manufacturer, shall make all necessary arrangements for the inspection and intimate the department at least 15 days prior to the date of inspection.
Phase-II: Schedule "A" Part – II: [Comprehensive Maintenance of Lifts provided under item No. 1 above after Defect Liability Period]:
All as per description of item No. 2.1 but for second year after expiry of defects liability period.
All as per description of item No. 2.1 but for third year after expiry of defects liability period.
Notes for Serial Item No. 2.1 to 2.3 above: [a] The contractor shall be required to employ Minimum 01 No. of lift Mechanic with sound knowledge and adequate experience Round the Clock. All the manpower employed shall report to Office of AGE [E/M]/ Complaint Cell for day to day maintenance and efficient operation of Lifts. [b] The rate quoted is deemed to be inclusive of supply and fixing of all Major and Minor Spares viz. Mechanical / Electrical / Electronic / LED Lights etc. as and when required for trouble free, smooth and efficient functioning of lifts including overhauling as and when required to all mechanical parts of lifts, Rewinding of Electric Motors, repair/maintenance of Gear Unit, repair / maintenance of Door Drive, Controllers, Pulleys, Limit Switches, Relays etc. complete all as directed by the Engineer-in-Charge. [c] All the safety measures including ARDs shall be ensured for serviceable condition round the clock and nothing extra shall be paid on these accounts. [d] The rate quoted shall be deemed to be inclusive of testing of each lift by Licensed Lift Inspector of Government of Andhra Pradesh twice in a year for worthiness of the Lift in respect of safety. Certificate issued by the Licensed Lift Inspector shall be submitted to the Engineer-in-Charge and a copy of Certificate shall be displayed in all Lift Cabins as directed by Engineer-in-Charge. [e] Emergency Light and necessary tools shall be available in a tool box in the shift for smooth functioning of lifts. [f] Conveyance and communication system like mobile phone etc. shall be provided by the contractor to all Lift Mechanics and Helpers. [g] The contractor shall abide by the latest Labour Rules and Minimum Wages Act. [h] Wages paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State / Central Government from time to time whichever is higher. [i] The contractor is responsible for making subscription towards Insurance, EPF, ESI, Labour Welfare Cess etc., as applicable and shall pay Gratuity, Bonus etc to the Workmen as per existing Labour Rules / Acts / Regulations and rate quoted shall be deemed to be included for the same.
[j] The contractor shall provide the workmen with Dark Blue Colour Uniform [Formal Pant & T-Shirt] with labels showing / printed i.e. "Name of the Firm and Designation" on Front and "GE [U-II][V] on the back of the T-Shirt along with protective clothing / gear. The contractor shall also provide shoes to the workers and no person shall be allowed to enter the work site without wearing shoes. [k] The contractor shall be responsible for all Accidents / Injuries happening to the workmen. Any accident causing Minor / Fatal Injury, Partial Disability due to any untoward incident or non-adherence to Safety and IE Regulations or fault in maintaining of Lifts System / Safety Mechanism or on account of any mishandling / wrong operation / lack of knowledge of safety precautions or on account of any circumstances beyond his/their control, the contractor shall be solely responsible for settling all claims of compensation to the deceased, failing which department will have a right to recover any sum indicated / claimed by Labour Commissioner / Court authorities. No claim whatsoever will be entertained in this regard. No compensation is payable by the department on this account. Contractor shall provide first aid boxes to meet any emergency situations. [l] Fortnight, Quarterly maintenance registers shall be maintained and signed by the site engineer and contractor. [m] Load testing shall be arranged by the contractor to the Lift for which repairs were carried out as and when directed by Engr -in-Charge.
Note for Item Nos. 1 to 2.3: The Bidder shall upload a Memorandum of Understanding (MoU obtained from OEM of Lift)alongwith Valid Product Approval letter of the OEM of the lift by MES (i.e E-in-C’s Branch / any Command HQs/ADG, for the Design, Supply, Installation, Testing, Commissioning, and future maintenance of the lift. The MoU and Valid Product Approval letter from the OEM are required to be uploaded online alongwith Technical Bid, failing which the bid will be summarily rejected and the Financial Bid shall not be opened. No representation or correspondence in this regard shall be entertained.
Escon Elevators Pvt Ltd (BID ID -3457044)
INDUSTRIAL ENGINEERING SYSTEMS (BID ID -3457266)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
82596tender.pdf
Tender Documents • 1.16 MB
BOQ_819286.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .