Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹13,636
Closing Date
11 Jun 2026, 11:00 am5d left
The Managing Director
Kerala SIDCO Limited Housing Board Building, 6th floor Santhi Nagar, Thiruvananthapuram - 695 001
GENERAL-Construction of Compound wall at SIDCO IE-Varkala-SIDCO Industrial Estate-General Civil Work
2026_SIDCO_841156_5
SIDCO/PROC/CONS/IEV/2025-26
Open Tender
Civil Works - Others
120 days
varkala
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,287
₹13,636
3 Jun 2026
3 Jun 2026
12 Jun 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Appendix A- Construction of Compound wall | ||||||
| 1.001 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - | item2 |
| 1.002 | 2.33.2
Felling trees of the girth (measured at a height of 1 m above ground level) including
cutting of trunks and branches, removing the roots and stacking of serviceable
material and disposal of unserviceable material.Beyound 60 cm girth up to and
including 120 cm girth | - | each | - | - | item3 |
| 1.003 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 1 | cum | - | - | item4 |
| 1.004 | OD94398/2025-2026
Dry rubble masonry with hard stone in foundation and plinth including levelling up
with up to plinth level | - | cum | - | - | item5 |
| 1.005 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1 | cum | - | - | item6 |
| 1.006 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | - | kilogram | - | - | item7 |
| 1.007 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - | item8 |
| 1.008 | 6.4.1
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation
7.5 in superstructure above plinth level up to floor V level in all shapes and sizes
in:Cement mortar 1:4 ( 1 cement : 4 coarse sand) | - | cum | - | - | item9 |
| 1.009 | 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 0.6 | sqm | - | - | item10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
varkala5.pdf
Tender Documents • 0.87 MB
BOQ_1443464.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid