Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 212 SUBASHNAGAR HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | Accepted-Technical Qualify |
| 2 | Accepted-Technical 304 MOHLA SOT ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | Accepted-Technical Qualify |
| 3 | Accepted-Technical | Accepted-Technical Qualify |
| 4 | Accepted-Technical | Accepted-Technical Qualify |
Tender Value
₹40.4 L
EMD Value
₹81,000
Closing Date
25 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Civil Circle (Dehradun)
Special M and R of Type-III- 01Nos, Type-II-04 Nos and other misc. civil works at 33/11 KV S/S Syalde (Almora)
2026_UPCL8_102608_1
ECC-57/2026-27
Open Tender
Civil Works
Percentage
120 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
E.E, ECCD Dehradun
₹81,000
25 Nov 2026
18 Nov 2026
25 Nov 2026
18 Nov 2026
25 Nov 2026
20 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.001 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 70.64 | Cum | 214.66 | ₹15,163.15 |
| 1.002 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) for drain | 1.52 | Cum | 9,527.8 | ₹14,510.84 |
| 1.003 | P/laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 149.03 | Cum | 8,238.04 | ₹12,27,698.63 |
| 1.004 | P/ laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size) | 5.55 | Cum | 10,939.4 | ₹60,691.79 |
| 1.005 | Reinforced cement concrete work in beams, suspended floors, roofs havingslope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plainwindow sills, staircases and spiral stair cases up to floor five level, excludingthe cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size).for sunshades | 21.5 | Cum | 13,914.08 | ₹2,99,152.72 |
| 1.006 | Centering and shuttering including strutting, propping etc. and removal ofform for :Suspended floors, roofs, landings, balconies and access platform | 9.56 | Sqm | 1,121.36 | ₹10,720.2 |
| 1.007 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | 12.18 | Sqm | 890.56 | ₹10,847.02 |
| 1.008 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete Cold twisted bars : for sunshades and septic tank soak pit cover | 157 | Kg | 130.43 | ₹20,477.51 |
| 1.009 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand): For septic tank and soak pit | 19.97 | Cum | 8,625.33 | ₹1,72,221.96 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TC.pdf
Tender Documents • 0.28 MB
BOQ_120800.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .