| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Agreement executed and work awarded |
| 2 | L2₹1.3 Cr+₹59,794.14 (0.46%)Rejected-AOC | ₹1.3 Cr+₹59,794.14 (0.46%) | L2 | Rejected-AOC Agreement executed and work awarded |
| 3 | L3₹1.3 Cr+₹4.5 L (3.50%)Rejected-Finance | ₹1.3 Cr+₹4.5 L (3.50%) | L3 | Rejected-Finance Lowest bid accepted |
| 4 | L4₹1.3 Cr+₹5.5 L (4.25%)Rejected-Finance | ₹1.3 Cr+₹5.5 L (4.25%) | L4 | Rejected-Finance Lowest bid accepted |
| 5 | L5₹1.4 Cr+₹9.7 L (7.53%)Rejected-Finance 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | ₹1.4 Cr+₹9.7 L (7.53%) | L5 | Rejected-Finance Lowest bid accepted |
| Sl No | Description | Qty | Unit | A.K.VARUN L2 | AK.DINESHAN L6 | P VINAYAKUMAR L1 | Rasheed L5 | JAGADEESH KUMAR V L4 | Santhosh Kumar K.V. L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Ground floor | |||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,200 | sqm | 20 ₹24,000 | 10 ₹12,000 Lowest | 14 ₹16,800 | 14.69 ₹17,628 | 14.2 ₹17,040 | 14 ₹16,800 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 873.7 | cum | 300 ₹2,62,110.3 | 350 ₹3,05,795.35 | 269 ₹2,35,025.57 Lowest | 290.51 ₹2,53,818.88 | 280 ₹2,44,636.28 | 300 ₹2,62,110.3 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 247.74 | cum | 100 ₹24,774.3 | 250 ₹61,935.75 | 98 ₹24,278.81 Lowest | 105.8 ₹26,211.21 | 102 ₹25,269.79 | 110 ₹27,251.73 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 179.13 | sqm | 350 ₹62,697.25 | 300 ₹53,740.5 | 289 ₹51,770.02 Lowest | 311.84 ₹55,861.46 | 301 ₹53,919.64 | 300 ₹53,740.5 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 52.22 | cum | 6,000 ₹3,13,344 | 6,800 ₹3,55,123.2 | 5,939 ₹3,10,158.34 Lowest | 6,406.3 ₹3,34,562.61 | 6,280 ₹3,27,966.72 | 6,100 ₹3,18,566.4 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 16,388.53 | kilogram | 80 ₹13,11,082 Lowest | 90 ₹14,74,967.25 | 84 ₹13,76,636.1 | 90.79 ₹14,87,914.18 | 88 ₹14,42,190.2 | 80 ₹13,11,082 Lowest |
| 1.01 | OD285972/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level(cement content considered in this item is @340/cum.excess or less cement used as per design mix is not payable or recoverable) | 139.43 | cum | 9,500 ₹13,24,594.5 | 9,000 ₹12,54,879 | 8,549 ₹11,91,995.62 Lowest | 9,222.89 ₹12,85,956.78 | 9,000 ₹12,54,879 | 9,975 ₹13,90,824.23 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 459.37 | sqm | 900 ₹4,13,433 | 800 ₹3,67,496 | 755 ₹3,46,824.35 Lowest | 814.46 ₹3,74,138.49 | 780 ₹3,58,308.6 | 787 ₹3,61,524.19 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 58.47 | cum | 8,980 ₹5,25,069.58 | 7,000 ₹4,09,297 Lowest | 7,769 ₹4,54,261.2 | 8,380.7 ₹4,90,027.91 | 8,200 ₹4,79,462.2 | 8,000 ₹4,67,768 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
8 Oct 2025, 3:00 pmClosed
Superintending Engineer
Buildings North Circle PWD Complex Mananchira Kozhikode
Construction
2025_PWD_803169_1
PWD/BLDG/9370/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
540 days
Vellayil kozhikode
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,515
Yes
₹50,000
Yes
25 Oct 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
8 Oct 2025
27 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335228.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .