| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 18 1 CHANDI CHARAN GHOSH ROAD BARISHA KOLKA 700008 | KOLKATA | WEST BENGAL | 700008 | ₹1.2 L | L1 | Accepted-AOC lowest |
| 2 | L2₹1.3 L+₹2,617.74 (2.10%)Rejected-AOC 1087 LASKARHAT KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | ₹1.3 L+₹2,617.74 (2.10%) | L2 | Rejected-AOC higher than lowest |
| 3 | L3₹1.3 L+₹3,988.93 (3.20%)Rejected-Finance | ₹1.3 L+₹3,988.93 (3.20%) | L3 | Rejected-Finance higher than L2 |
Tender Value
₹1.2 L
EMD Value
₹2,600
Closing Date
19 Jun 2026, 5:00 pmClosed
DY.CE(M)/(S_D)
5, s.n bannerjee road. kolkata-700013
De-clogging of DWF pump unit with other allied works at joka DPS under GRBU
2026_KMC_1026636_1
KMC/GRBU/JOKA/03/26-27
Open Tender
Support/Maintenance Service
Percentage
153 days
GRBU
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,600
9 Sept 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. BUILDING (B) LABOUR RATES PER DIEM : 17)FITTER MECHANIC. NOTE: (I)THE ABOVE RATES OF LABOUR ARE EXCLUSIVE OF 10% CONTRACTORS PROFIT AND 1% LABOUR WELFARE CESS WHICH WOULD BE ADMISSIBLE TO THE CONTRACTORS, BUT CONTRACTUAL PERCENTAGE WILL NOT BE APPLICABLE. (II) THE WORKERSEMPLOYED ON HIGH RISE BUILDING OR ANY STRUCTURE OVER 30 FT IN HEIGHT AND ALSO WORKERS ENGAGED IN TUNNEL SHALL BE PAID 20% EXTRA WAGES.(PWD.BLDG SCHEDULE_WEF 01.11.2017)
Considering 4nos. operation per month for 6 nos DWF pumps.
1.Manpower involved per operation =3mechanic + 4Helper + 12Mazdoor
=3*326+4*270+12*296=5610/-
Total cost including 10% agency profit=5610*1.1/-
=6171/-
Total no of operation for 5 months= 4operations per months * 5 months=20 nos operation. | 60 | number | 358.6 | ₹21,516 |
| 2 | MATERIALS AND LABOUR 1. BUILDING (B) LABOUR RATES PER DIEM : 18)FITTER MECHANIC (HELPER). NOTE: (I)THE ABOVE RATES OF LABOUR ARE EXCLUSIVE OF 10% CONTRACTORS PROFIT AND 1% LABOUR WELFARE CESS WHICH WOULD BE ADMISSIBLE TO THE CONTRACTORS, BUT CONTRACTUAL PERCENTAGE WILL NOT BE APPLICABLE. (II) THE WORKERSEMPLOYED ON HIGH RISE BUILDING OR ANY STRUCTURE OVER 30 FT IN HEIGHT AND ALSO WORKERS ENGAGED IN TUNNEL SHALL BE PAID 20% EXTRA WAGES.(PWD.BLDG SCHEDULE_WEF 01.11.2017 | 80 | number | 297 | ₹23,760 |
| 3 | MATERIALS AND LABOUR 1. BUILDING (B) LABOUR RATES PER DIEM : 2)MASON (ORDINARY). NOTE: (I)THE ABOVE RATES OF LABOUR ARE EXCLUSIVE OF 10% CONTRACTORS PROFIT AND 1% LABOUR WELFARE CESS WHICH WOULD BE ADMISSIBLE TO THE CONTRACTORS, BUT CONTRACTUAL PERCENTAGE WILL NOT BE APPLICABLE. (II) THE WORKERSEMPLOYED ON HIGH RISE BUILDING OR ANY STRUCTURE OVER 30 FT IN HEIGHT AND ALSO WORKERS ENGAGED IN TUNNEL SHALL BE PAID 20% EXTRA WAGES.(PWD.BLDG SCHEDULE_WEF 01.11.2017 | 240 | number | 325.6 | ₹78,144 |
| 52 | Sub Total | - | - | - | - |
| 54 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
td.pdf
Tender Documents • 0.88 MB
BOQ_2522091.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .