Loading…
Loading…
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
10 Aug 2026, 3:00 pm
FOREST OFFICE
Tirupathi
Development of Gardens, Lawns, Edges, and Plantations of miscellaneous plants at SV POLYTECHNIC, TTD, Tirupati in SVM Range.
968594
19/ DyCF/TTD-TPT/2026-27
OPEN - NCB
Others
TIRUPATHI
6 documents required · 6 mandatory
₹707
₹20,000
25 Jul 2026
25 Jul 2026
25 Jul 2026
Earthwork excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all Operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work Note: Cost of dewatering may be added, where required,up to 5% of labour cost. Assessment for dewatering shall be made as per site condition.
Filling of foundations and basement with best red soil in layers of not more than 15 cms. thick each well watered to saturation and consolidated including cost and conveyance of all materials, incidental charges etc., complete.
Bed preparation for Korean/Mexican:Dressing the surface to the desired shape, laying of 150 mm. (6”) thick fine red garden soil, covered with a thin layer of 10 mm thick sand, watering, rolling (compacting to 4" thickness by hand roller), including the cost of red garden soil, sand and labour charges etc., for complete bed preparation and laying and ramming of lawn mats / rolls in proper position on existing prepared bed by internal transportation from dumped place,including cost of labour for laying, ramming by hand roller / demesha, internal transportation and watering etc., and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work. excluding cost of grass, fertilizers and chemicals etc., for 1 Sqm (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
Hedge / shrub planting: Digging the trench in ordinary soils of size 0.3 mtrs depth, refilling with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc.,including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*12 No./Sqm of plants) and bag size shall be arrived based on the spacing.
Supply & delivery of specified plants as per directions of officer in charge at site including cost of plants, loading and delivery at Site for plants
Supply of Branded 1" Hose pipe including cost and converyance etc for watering (approved rate)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ-19.xlsx
TENDER_DOCUMENT • 0.18 MB
NIT -19 Tender Schedule.docx
TENDER_DOCUMENT • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].