Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.1 LAccepted-AOC WARD NO 01 AT P O P S BARPALI DIST BARGARH | BARPALI | BARGARH | ODISHA | L-1 | Accepted-AOC Work awarded by Transparent Lottery System | |
| 2 | L-1₹12.1 LRejected-AOC | L-1 | Rejected-AOC Transparent Lottery System | |
| 3 | L-1₹12.1 LRejected-AOC | L-1 | Rejected-AOC Transparent Lottery System | |
| 4 | L-1₹12.1 LRejected-AOC WARD NO 06 PO P S KUCHINDA DIST SAMBALPUR ODISHA PIN 768222 | SAMBALPUR | ODISHA | 768222 | L-1 | Rejected-AOC Transparent Lottery System | |
| 5 | L-1₹12.1 LRejected-AOC | L-1 | Rejected-AOC Transparent Lottery System |
Tender Value
₹14.3 L
EMD Value
₹14,292
Closing Date
6 Mar 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARGARH, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARGARH
CIVIL WORK
2025_EICCL_111106_3
IFB-SE PWD-23 OF 2024-25
Open Tender
Civil Works - Buildings
Percentage
90 days
BARPALI
PLEASE REFER THE TENDER DOCUMENTS
2 documents required · 2 mandatory
₹6,000
₹14,292
Yes
29 May 2025
25 Feb 2025
7 Mar 2025
25 Feb 2025
6 Mar 2025
25 Feb 2025
25 Feb 2025 - 6 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including rank vegitation, grass, bushes, shrubs, sapplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc. all complete as per direction of the Engineer-in-charge. | 1,740 | Sqm | 8.26 | ₹14,372.4 |
| 2 | Earth work in excavation of foundation trenches in all Kindes of soil depositing the excavated materials with all leads and lifts T & P shoring & Shuttering if required etc. complete as directed by the E.I.C. | 34.99 | Cum | 270.9 | ₹9,478.79 |
| 3 | Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T & P required for the work etc. complete | 3.89 | Cum | 721.9 | ₹2,808.19 |
| 4 | Cement concrete (1:3:6) ) in foundation and floors i.e., below the base using crusher broken hard granite chips of 4 cm (1 ½ “) size including cost, conveyance, royalties and cost of all labour with T & P required for the work complete. | 3.89 | Cum | 5,782.3 | ₹22,493.15 |
| 5 | Brick work with Fly Ash bricks of size 23cmx11cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:6) in super stucture including all charges | 57.96 | Cum | 5,542.69 | ₹3,21,254.31 |
| 6 | Reinforced cemnet concrete of M-20 grade as per approved designs and drawing having a minimum compressive strength (in work test) of 200kg/cm2 in 15 cm cubes at 28 days after mixing and test conduct in accordance with I.S 456 and I.S 516 using 12 mm to 20 mm. size black hard crusher broken granite chips (20 mm. size chips not to exceeds 25%) and screened and washed sharp sand for mortar of approved quality from approved quarry to be mixed in concrete mixture including hoisting,lowering, laying and compacting concrete by using vibrators, wateringand curring for 28 days, centering and shuttering then after dismantling and remoing debrish from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete but excluding cost and conveyance of M.S rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S rods or Tor steel tying the grills and placing in proper position as directed by the Engineer in charge.
A) Column base | 18.68 | Cum | 6,095.32 | ₹1,13,860.58 |
| 6.01 | B) Plinth bend | 10.5 | Cum | 6,530.37 | ₹68,568.89 |
| 6.02 | C) Column in Super Structure | 7.29 | Cum | 15,377.87 | ₹1,12,104.67 |
| 6.03 | D) Lintel bend | 5.25 | Cum | 10,474.27 | ₹54,989.92 |
| 7 | 12mm (½”) thick cement plaster (1:6) in finished smooth to outside smooth surface of brick walls after racking out joints including watering and curing etc. complete | 336 | Sqm | 145.42 | ₹48,861.12 |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.82 MB
DTCNHETCCompoundWall.pdf
Tender Document • 2.74 MB
BOQ_531388.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .