Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹20 L+₹2.5 L (14.3%)Rejected-AOC DHALIWAL | FATEHGARH SAHIB | PUNJAB | 140402 | L2 | Rejected-AOC L2 | |
| 3 | L3₹20.2 L+₹2.7 L (15.2%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹20.3 L+₹2.8 L (16.1%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹21.6 L+₹4.1 L (23.4%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/S Anil Kumar L1 | Yash Pal Sharma L2 | Nishant Puri Govt Contractor L4 | Manjit Contractor L3 | RANJIT KUMAR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Bhakra Makri (Old and New) whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e pump operator/ Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 17,49,100 ₹17,49,100 Lowest | 20,00,000 ₹20,00,000 | 20,30,000 ₹20,30,000 | 20,15,155 ₹20,15,155 | 21,59,170 ₹21,59,170 |
| 2.00Description of main components of the scheme is as under:- Civil works: 5 No pump house, 2 Nos main storage tanks. Rising main: 150 mm dia=8500 Rmt. Distribution System: 100 mm, 180 mm and 65 mm dia=40370 Rmt. Pumping machinerey: LWSS Bhakra Makri (New) 1st stage: 2x75=150 HP, 2nd stage 2x40=80 HP, 1st stage: 2x100=200 HP, 2x100=200 HP, 2x15=30 HP and 2x12.5=25 HP No. of storage tank 4 Nos, 11 Nos of habitation, Total working hours 74 per day: through, 13 Nos persons. Indicators to be mentioned: Average per day Nos of complaints received through different mode such as C.M. Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: ) Pumping hours per day ( ) and energy consumption per day Unit. | ||||||||
Tender Value
Refer Docs
EMD Value
₹37,900
Closing Date
29 Sept 2025, 2:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
A R M O LWSS Bhakra Makri Old and New in Tehsil Sh. Naina Devi Ji District Bilaspur SH Operation of Pumping machinery and distribution system for water supply scheme from sector storage tanks to different habitations for one year
2025_HPIPH_114938_1
5005-5104
Open Tender
Civil Works - Others
Item Rate
Bhakhra
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹37,900
13 Nov 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .