Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.5 LAccepted-AOC | ₹6.5 L | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹6.7 L+₹20,976.74 (3.23%)Rejected-Finance | ₹6.7 L+₹20,976.74 (3.23%) | 2 | Rejected-Finance SECOND LOWEST BIDDER |
Tender Value
₹7.1 L
EMD Value
₹10,608
Closing Date
27 Jan 2021, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Roads Sub Division KalpettaAssistant Executive Engineer PWD Roads Sub Division KalpettaAssistant Executive Engineer PWD Roads Sub Division KalpettaAssistant Executive Engineer PWD Roads Sub Division Kalpetta
Flood damage 2020 21Providing retaining wall and drainage between km 0/970 to 1/025 RHS of Muttil Meppadi road
2021_PWD_407293_1
RdDnWYD/RD/2021/17
Open Tender
Civil Works - Roads
Item Rate
60 days
lakkidi section
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,560
Yes
₹10,608
Yes
18 Sept 2021
20 Jan 2021
29 Jan 2021
20 Jan 2021
27 Jan 2021
20 Jan 2021
Amount
Retaining wall
2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
15.9 : Construction of dry rubble flooring at cross drainage works for relatively less important works.Construction of dry rubble flooring at cross drainage works for relatively less important works.
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification <br> Granular materialBack filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
TP SHIJU
Bidder Name
KMKURIAKOSE
TP SHIJU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_578962.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .