Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
| 4 | Admitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | Admitted-Finance |
| 5 | Admitted-Finance 1 212 V P ROAD AZHEEKKAL ERNAKULAM KERALA 682508 | ERNAKULAM | KERALA | 682508 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Aug 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Admiral Superintendent
Naval Ship Repair Yard NSRY, Naval Base Karwar 581 308
SHORT REFIT (SR) OF FC KUMTA
2021_NAVY_461705_1
YCM/SR20/FC KUMTA
Open Tender
Marine Services
Item Rate
90 days
Naval Ship Repair Yard Naval Base Karwar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY ,KARWAR
19 Oct 2021
21 Jul 2021
11 Aug 2021
21 Jul 2021
10 Aug 2021
22 Jul 2021
28 Jul 2021
180 days
Amount
Erection of fixed staging/scaffolding in way of steel renewal work and survey purpose (Based on Volume Basis, LXBXH). Staging material to be provided by Contractor. Quote for Service and Material.
Fire sentry for minimum 10 hot work locations /day Note:- Fire sentries with adequate knowledge of fire fighting and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident. Payments on Actuals. Material and Service to be provided by contractor.
Cleaning and Gas free certification i.a.w NO 09/12 of Fuel / Oil Tanks. Qty - 04 Material and Service to be provided by contractor.
Pressure Testing of Underwater tanks/void spaces/cofferdams Including repairs/blanking of manhole covers( with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor. Ballast Tank (qty 02), Fuel Tank (qty 04), FW Tank (qty 02), Peak Tank (qty 01), Sea Tube (qty 03). Material and Service to be provided by contractor.
Sea Tubes - (a) Renewal of sea tubes to be undertaken as per hull survey report using DMR249A steel. Total Sea Tubes (Qty 03). (b) Clean and examine the sea tubes for internal corrosion, excessive pitting, cracks etc. In addition carry out endoscopy of sea tubes. Repair / renew as necessary. Air pressure test is to be carried out of repaired sea tubes. (c) Sea tubes which cannot be preserved by painting are to be galvanised and spray coated with paint scheme. Material and Service to be provided by contractor.
Bollard and Fairlead - Carry out surface preparation by hydrojet blasting up to bare metal to WJ 2 Standard. Prior application of paint after repairs surface to be prepared to SA 2.5 standard using vaccum grit blasting. Repairs to be undertaken as per hull survey report of bollards / fairleads and stiffening members in the vicinity. Double Bollard (qty 04), Single Bollard (Qty-07), 150NB Roller fairleads (Qty 02), Mooring Eye (Qty 04), Cowel Vent (Qty 02), 200 NB Aft Mooring Bit (Qty 02), 250 NB Side Mooring Bit (Qty 04). Note:- After hydrojet blasting, primer application to be undertaken to prevent flash rusting, the same is to be put up for inspection prior to repair / renewal or painting to QC team for inspection. DPT and Bollard Pull Test (25T) to be undertaken. Firm to provide OEM warrenty for paint as per existing norms. Material (Bollards, fairleads and others as required) and Service to be provided by contractor.
Underwater Plating - (a) Remove marine fouling and complete old paint to bare metal from hull using hydrojet blasting to WJ 2 standard. Prior application of paint after repairs surface to be prepared to SA 2.5 standard using vaccum grit blasting. Defects to be rectified as per hull survey report. Job involves opening and cleaning on gratings. (b) Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored post SA 2.5 standard. Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship (iii) Aft. Renew defective draught marks. Note:- Navy approved paint scheme Akzonobel to be applied. Painting to be carried out as per NO 53/16, with approved warrenty from Paint OEM. Intergard 269 (1 X 50 microns dft), Intershield 300 AL (1 X 150 microns dft),Intershield 300 Bronze (1 X 150 microns dft), Intergard 263 Light Grey (1 X 125 microns dft), Intersmooth 360 Dark Brown (1 X 150 microns dft), Intersmooth 360 Dark Red (1 X 150 microns dft), Intersmooth 360 Dark Brown (1 X 150 microns dft). Material and Service to be provided by contractor.
Above Water Area and Weather Deck Area - (a) Carry out surface preparation by hydro jet blasting up to bare metal to WJ 2 standard. Defects to be rectified as per hull survey report. (b) Carry out painting of above water area and super structure with high performance advanced hybrid coating system as per navy approved paint scheme Akzonobel mentioned below and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Akzonobel mentioned below. (c) Paint scheme for above water area (ship side, deck, Aft & Fwd Bulwark (Internal) & super structure)(Area - 810 Sqm) :- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns. Material and spares to be provided by contractor . (d) Paint scheme of weather deck area (upper deck, boat deck and bridge top deck)(Area - 430 Sqm):- (i) 01 coat primer coat - dft 50 microns, (ii) 01coat anti corrosive intermediate coat - dft 200 microns, (iii) 01 coat non skid top coat - dft 800 microns, (iv)Total dft - 1050 microns. Material and Service to be provided by contractor
Machinery Spaces - (a) Clean all bilges, machinery foundation and surface preparation as per ST 3 standard and painting of the entire area/ compartment including bulkheads. (b) Machinery pipeline painting as per colour coding post surface preparation. (c) All equipment/ machinery to be painted as per existing paint scheme. (d) Clean all limber holes and drain holes. Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. (e) Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paint to be provided by Firm with warrenty. Material and Service to be provided by contractor
Machinery Vibration Mounts - (a) Manually clean and apply Nicole lacquer on the vibration mounts of all equipment including engine room. Material to be provided by refitting firm. (b) 25% of the total mounts are to be replaced post undertaking grouping of mounts based on SPM Checks. To be paid on actuals, Qty -32 nos. (Note- Mount replacement barring MEs, DAs and Gear Box). Material and Service to be provided by contractor.
Lagging - Renew damaged / perished lagging at various places using pin method. Renew / restore in case of existing areas, paint scheme of affected areas before renewal of lagging. Mat - MWMB Grade Insulation Material, Thickness - 75 mm. Material and Service to be provided by contractor.
Mast and Riggings - (a) Carry out surface preparation by manual chipping up to bare metal (Area - 20 Sqm). Repair mast structure and the surrounding structure on deck, eye plates, load carrying members and intermittent welded structure as per hull survey report. (b) Hoisting and lowering motor along with wire rope (16 mm) to be overhauled and mast to be proved for safe and satisfactory operation. Paint to be restored as per existing paint scheme. (i) 02 coats of primer to achieve 80 microns dft (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness (iii) Total dft 320 microns. Paint as per existing paint scheme to be provided by refitting firm. (c) Replace all existing standing & running riggings fitted on mast structure along with associated fittings with new one. Wire rope specifications - Dia : 16 mm, Qty - 03, Length - 20 mtr each, Replace all SS bottle screw (Qty -06). Mast to be rigged up and proved. Material and Service to be provided by contractor.
Cathodic Protection Sacrificial Anodes - Replace all sacrificial anodes (Indium free Aluminium anode) fitted to underwater hull, rudders, rope guard, shaft tunnel, stern tubes, inlets and outlets, sea chest, bilges and coffer dams and ring anodes as per existing fitted anodes. (MK III). Anode quality certificate to be provided prior fitment. Payment on actuals. Quote for Service and Material.
Steel Renewal- All machinery / equipment, switchboard/ control panels, electronic and communication equipments , all light fittings, pipe lines and support brackets, valves, electrical cables, junction boxes, lagging, panelling, obstructions, protrusions, foundation etc in way of steel renewal will be removed and refitted. (a) Renew steel (if required) along with structural sections of following locations: - (i) Underwater Hull (ii) Underwater compartments (iii) Fuel, Fresh Water, Ballast and Misc tanks (iv) Superstructure (v) Masts (vi) Weather deck, bridge deck, funnel deck and deck fittings (vii) internal compartments. (b) Job also involves degutting / regutting works like lagging, tiling, underlay / cementing, panelling, pipes electrical wires minor eqpts. Brackets, wooden fittings. (c) New plates / stiffeners to be blasted to SA 2.5 and primer should be applied before erection. (d) Prepare surface and apply one coat of primer immediately after completion of hot work. (e) Record section wise report of steel renewal and forward report in 03 sets of hard copy and 01 set of soft copy to navy / ship staff. Steel plates supplied by Yard. All consumables material supplied by contractor. Quote for Service and Yard consumables.
Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS, thickness - 50 mm, B15 Type. Material and Service to be provided by contractor
Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS, thickness - 50 mm, B15 Type. Material and Service to be provided by contractor
Anchor, Chain Cable and Cable Locker - (a) Remove and lay out Anchor, chain cables and accessories and carry out surface preparation up to bare metal for survey. (b) Repairs to be under taken as per hull survey report (NO 2/21 relevant). Dismantle anchor and chain cable , clean and grease all joining shackles. Strip and grease slip in cable locker. (c) Re-arrange cable length to ensure equality of wear. Re-mark cable length. (d) Examine hull associated fittings. Clean and grease trunion pin and housing. Grease to be used:- LG-280 Patt No 0474/910-0502. The machined surface of the joints of lugless joining shackles are to be examined for corrosion. (e) All Anchor, chain cables and accessories are to be stripped, greased and re-assembled and all defective lugless joining shackles, swivel piece to be replaced asper existing fitment. (f) Anchor, chain cable and cable locker to be painted as per existing paint scheme post surface preparation and restore in cable locker. Paint to be provided by refittng firm. (Qty: Anchor - 02, chain length- 165 mtr, Swivel piece - 04, Lug less Joining shackles - 10, D Shackles - 04). Material and service to be provided by contractor.
Overhauling- Anchor Winlass (Mfd- Geeta Eng. Works) - Following work to be carried out:- (a) Overhauling of anchor winch along with motor assembly (415V, 10HP), rollers and anchor windlass accessories. Changing of oil and insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. Undertake survey of structure post load testing. Structural defects to be rectified, if any. (b) Replace all high speed bearings (6208.2zr). (c) Rewinding of all motor with same grade of copper wire. (d) Clean and varnish dirty and oily windings. (e) Motor to be overhauled, both bearing to be replaced & load tested (subject to QC checks). (f) Replace all brake mechanism. (g) Overhaul the control panel, and replacement of defective components, starters and cables, including cable glands to prove satisfactory performance of equipment. (h) System to be proved for designed operation and load trials to be offered. (j) Carry out surface prepaeation of foundation and structure by buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Note:- Vendor to cater for all consumables, spares/ material including POLs. Material and Service to be provided by Contractor.
Sewage Treatment Plant (Mfd - EVAC, Model-ORCA III 50) - Undertake following routines: (a) Functioning of level switches of V-1 tank. Carryout de-sludging of V-2 tank by backflushing line and painting of both tanks to be undertaken as per existing paint scheme post surface preparation. Clean the seawater ‘y’ type strainer at the inlet to bookcell. Lub oil to be replaced. Replace all air supply filter/ regulator element in solvent. Drain, inspect & clean the ‘bookcell’. Remove large deposits of hard material with diluted hydrochloric acid. Post completion of routines, operate system and inspect for leaks and proper cell amperage. (b) Inspect the tightness of belt and check leakage from gland of discharge pump. Repack the gland with new one. (c) Carry out following on Macerator pump:- (i) Check to ensure there are no leakages from the main seals. Replace all drive end bearing and seals. (ii) Ensure impeller is free for rotation with no vibration. (iii) Ensure overload units operating correctly. (iv) Remove drain plugs provided at each end of the bracket of the electric motor and allow any accumulated moisture to drain away. Replace damaged plugs. (d) Clean and lubricate all plug cock valves. Lubricate valves in fully opened or fully closed position only. (e) Post repairs, STP to be proved for operation as per designed parameters. (f) Undertake effluent test from NABL accredited lab and check compliance to MARPOL norms. (g) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of MARPOL 73/78. (h) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate. (j) Dismantle all system lines and repairs/ renewal Pressure Testing of all defective system lines. (k) Carry out functional checks of Instrumentation/ control panel and replace defective components to prove satisfactory operation. Material and Service to be provided by contractor.
Ventilation Trunking - (a) Mechanical cleaning of Ventilation trunking to be undertaken and earthing strips on upper deck and mess to be replaced. Restore paint scheme as per existing paint scheme. (Job involves removal and fitment of all light fittings, pipe lines, valves, electrical cables, junction boxes, lagging, panelling, obstructions, protrusions, foundation etc as required). (b) All wire mesh of different sizes to be replaced (approx. no - 15 nos). (c) Replacement of defective/ damaged trunking to be carried out. (c) Replacement of wire mesh/ Punkah Louvers/ Inspection covers to be undertaken. Material and Service to be provided by contractor.
Following works to be undertaken:- (a) Grease filters inside exhaust trunking in galleys to be replaced, Qty- 02. (b) Galley supply fan motor defective, motor to be overhauled and all bearings and motor winding to be replaced. Qty- 01. (c) Hot Plate coils (08 nos), Hot water Kettle coils (04 nos), microwave oven (21Ltrs) to be replaced. Material and Service to be provided by contractor.
Serviceability checks of natural exhaust and supply vent in various location to be carried out. Damaged part (wire mesh, Louvers, operating mechanism etc. ) to be replaced. All consumables/ spares required for optimal functioning of the equipment as per the original design to be replaced. (Qty - 16). Material and Service to be provided by contractor.
Life raft - (a) Replace Hydrostatic Release Gears by NABL accredited agency (Qty 16). (b) Life raft stowing brackets (Qty 16) damaged/ broken/ corroded. To be renewed and proved operational. Job involves renewal of life raft securing straps, slips and shackles and rubber padding. Material and Service to be provided by contractor.
Ladders - (a) Carry out mechanical surface preparation of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps and handrails. Damaged area to be renewed. Paint to be restored as per existing navy approved paint scheme Akzonobel. (Qty - 15). (b) Footsteps at various places are damaged and the same are to be renewed. (Qty - 10) Mat - MS. Material and Service to be provided by contractor.
01 Ton Motor Driven Radial Boat Davit (02 Nos), MFD - The Shalimar Works (1980) Ltd (a) Complete overhauling of boat davit, boat release hook, gear box along with motor assembly. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. During trials motor parameters are to recorded and same to be cleared by qc. (b) Replacement of all bearings, brake mechanism, lubricating oil, limit switches, wire rope, spare gear, hooking arrangement, and other associated lifting gears to be undertaken. (c) Carry out load testing with davit fully rigged up. After completion of load test. Examine the complete davit structure and associated lifting gears for flaws, distortion, defecation etc. Flaws must be examined and repairs to be carried out. After renewal trials of davit to be undertaken and proved. (d) Carry out surface preparation of foundation and structure by buffing up to bare metal (ST 3). Clean and restore paint post surface preparation. (e) System to be proved for designed operation including maual operation. Material and Service to be provided by contractor.
Gemini craft (02 Nos) – Carry out following:- (a) Gemini craft keel, bottom board, boat collar, transom, transom plate for OBM fittment and eye for securing OBM damaged. To be replaced with new one. (b) Lifeline, air filling valve, safety release valve, securing pockets, paddles and lifting arrangement to be replaced. (c) Replace polyester webbing boat sling for lowering and hoisting purpose. SWL 1.5 ton. Load test certificate to be provided. Trials to be carried out alongwith weighing of boat with accessories post repairs. Test certificate to be provided. (d) Boat chocks to be repaired and cushion to be renewed. Renewal of all seating arrangements of boat. (e) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester. (f) 02 in nos oar and 02 in nos boat hook for gemini craft damaged/ broken. To be renewed. (g) OBM to be completely overhauled with all spares. Boat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by Contractor.
Sanitary System - (a) Replace WC and urinal flushing valves, reducing valves and reducer (Qty 12). (b) Replace WC, bathroom fittings, mirror, towel stand and drain pipelines. Pressure testing to 1.5 times working pressure (kg/cm2), undertake fitment onboard and prove for satisfactory performance. Re-galvanize where required (Length - 60 mtr, Pipe dia - 65NB). Job involves removal and fitment of all light fittings, lagging, panelling, obstructions, protrusions, foundation etc. Material and Service to be provided by Contractor.
Domestic fresh water system - Strip, clean and overhaul domestic fresh water system valves in WCs and bathrooms. Stop cock (qty 18), basin beep cock (pillar) (qty 07), sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). Material and Service to be provided by contractor.
Following accessories in the WC and bathroom to be renewed:- (a) Shower - 09, (b) Water tap - 12, (c) Urinal with full fittings and accessories - 04, (d) Commode with full fittings and accessories - 04, (e) 02 wash basin - 04 (f) Basin drain pipe - 06. Material and Service to be provided by contractor.
Tiling work in WC and bathroom damaged at various location. To be carried out. Area- 40 Sqm. Material and Service to be provided by contractor.
Doors-water tight and non wt doors - (a) WT Doors - (i) Carry out surface preparation of foundation and structure by buffing up to bare metal (ST 3). (ii) Replace clips, hinges for looseness and associated fittings. Replace washers, toridal sealing rings and rubber sealing. Replace worn out parts and rubber beading. (iii) Carry out chalk test of all W/T doors. (iv) Paint to be restored as per existing navy approved paint scheme Akzonobel. (Qty - 16, Size - 1800X800). (b) NWT Doors - (i) Repair NWT doors hinges and deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, hydraulic door closing mechanism and rubber beading. Job involves removal & fitment, repair of coaming of door, structural coaming, frames). Renew 05 hydraulic doors closer for NWT doors. Curtain to be provided made of fire retardant cloth. NWT doors - 24 {Ordinary Steel Door - 11, Bathroom door - 13, (Size -1800X600)}. Material to be provided by refitting firm. Material and Service to be provided by contractor.
Scuttles & windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Replace worn out parts and rubber beading. Curtain to be provided made by fire retardant cloth. Material to be provided by refitting firm. (Fixed scuttle with dead light: Qty - 13, Glass Thickness- 8-12 mm, Size - 230 mm). (Fixed windows - 20, Openable window - 28, Size - 900X900 - 39, 900X1080 - 06, 900X1065 - 02, 1300X1065 - 01). Material and Service to be provided by contractor.
WT Hatch - (a) Carry out surface preparation of foundation and structure by buffing up to bare metal (ST 3). (b) Repairs and overhauling of WT Hatches. (Including surface preparation of hatch body and primer application, repairs to coaming of hatches, Structural coaming, frames and straightening of bent hatches by removal & fitment, replacement of locks, auto locks, hinge pins, hinge assembly, rubber beading and removal & fitment). (c) Carry out chalk test post repairs and renew worn out parts as necessary. (Qty - 04). Material and Service to be provided by contractor.
Manholes - (a) Renewal of manhole covers to be undertaken of various tanks. (b) Replacement of rubber gasket and fastners (SS) to be undertaken. Maholes Qty - 22. Material and Service to be provided by contractor.
Guardrails and Stanchions -(a) Renew guardrail stanchions and securing foundations. Renew all the earthing connection of guard rails / stanchions and ensure grounding . Paint scheme of the stantions to be restored as per navy approved paint scheme Akzonobel. Length - 80 Rmtr (b) Safety chain for guardrail damaged/ broken along with bottle screw (Mat -SS). To be renewed. Mat - SS, Dia - 10 mm, Length - 30 mtr, Bottle screw - 30. Material and Service to be provided by contractor.
Paint Scheme Renewal Water Ballast Tank and Fresh Water Tank - (a) Carry out complete surface preparation to bare hull (SA 2.5 standards). (b) Structual defects to be rectified as per hull survey report thereafter Paint to be restored as per existing navy approved paint scheme Akzonobel for the following tanks:- (i) Water Ballast Tanks - 03, (ii) Fresh Water Tanks - 02. Paint to be supplied by contractor. Material and Service to be provided by contractor.
Internal Portion of Super Structure - (a) Carry out complete surface preparation up to bare metal (ST 3 standard). (b) Repair plating, structures, deck, bulkhead and fittings and replace damaged/ broken panels of various compartments as per hull survey report. (c) Carry out painting as per existing navy approved paint scheme Akzonobel. Paint to be supplied by contractor. Material and Service to be provided by contractor.
Misc Structure - DADO area in wet compartment corroded / damaged. To be repaired / renewed. (Job involves removal and fitment of lagging, panelling, obstructions, protrusions, foundation etc. as required). Post repair paint scheme to be restored as per existing Paint scheme (as per NO 53/16). Material and Service to be provided by contractor.
Rubbing Stake - Rubber fenders (rubbing stake) all around the ferry craft damaged/ perished. Fenders to be renewed. Job involves removal of old fender and fitment of new fender along with new 'C' channels and securing fastners. Type - D type, Thickness - 8" X 6", Length- 110 mtr. Material - EBDM/NBR/Natural rubber. Specification:- (a) Tensile strength - 16 MPa (min) (b) Elongation 350% (c) Change in tensile strenth - 20% (max) (d) Ozone Resistance - 50 PPHM/40C/24 hr/ no strain (e) Tear Resistance - 450 N/cm2. Material and Service to be provided by Contractor.
Fenders - (a) Renewal of tyre fenders (Qty- 15) (Aircraft tyres with outer dia 90 cm). Job involves fabrication of two hook brackets along with securing plate for securing tyre with chain. (b) Renewal of eye pads associated with rubber fenders (qty 30). (c) Renewal of 20 mm galvanised chain (qty - 60 mtr). (d) Renewal of D shackle 20 mm (Qty - 60). Note:- (i) Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders. (ii) Job involves degutting/ regutting works like lagging, underlay, panelling, electrical wires minor eqpts. Brackets if required for welding of eye pads. Material and Service to be provided by contractor
Pneumatic side fenders (Size- L 1160 mm, Dia - 660 mm) to be replaced. Qty - 04, Mat-Neoprene Blended Rubber having 65% min Neoprene Content, Colour- Black, Tensile strength- 180 Kgf/cm2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength - Min 40 Kgf/cm2, Compression set- 30% max, Abrasion resistance- 0.5 CC Max. Material and Service to be provided by contractor.
Life Saving Appliance - Stretcher for life saving equipment damaged. To be replaced with neil Robinson stretcher. Size - standard. Material to be provided by contractor.
Life Saving Appliance - First aid kit stowing wooden locker damaged at scattered location. To be renewed and fitted on specific locations. Material and Service to be provided by contractor.
Life Saving Appliance. Renewal of following:- (a) Lifebuoy with self igniting light and smoke signal (MOB marker) quick release type to be renewed on bridge deck and quarter deck. (Qty 03) (b) Lifebuoy with life line (30m long) to be renewed on 01 deck (Qty 04) (c) Ordinary lifebuoy damaged. To be renewed on main deck (Qty 06) (d) Lifebuoy with self igniting light and 30m buoyant life line to be renewed on 01 deck (qty 04). Note:- Items as LSA code in SOLAS Convention. Material to be provided by contractor.
Life Saving Appliance - Embarkation rope ladder (Pilot Ladder) broken. To be renewed. Dimesion as SOLAS Convention (Rope dia - 20 mm PP, Length - 03 Mtr). Anti twist spreader at ladder to be provided around 1.8 mtr in length. Material and Service to be provided by contractor.
Accommodation and offices - Renewal of wooden furniture and wooden fittings including table, chairs and wooden cupboards in compartment and accommodation spaces. Dining table (qty 02) (1200x700x750h), center table (qty 01) (850x500x450h), locker (qty 06) (600x400x1800h), book shelf (qty 02), table with drawer (qty 02), sofa (qty 01 (5 men sofa), upholstered chair (qty 08) (500x450), Bunk lockers with sliding arrangement (qty 10), Door handles to be replaced, qty - 10 nos, Proper door sealing arrangement to be undertaken. Material and Service to be provided by contractor.
Renewal of bunks cover, mattress and their securing arrangements. Defects to be rectified for renewal as necessary. Bunk cover (qty 16), mattress (Density 5 LBS) (qty 16*6 inches) (single type mattress). Mat to be provided by refitting firm. Material and Service to be provided by contractor.
Chairs in dining hall, master cabin, ED cabin and mess decks damaged. To be replaced. Dinning Chair (qty 06), Executive Chair (qty 04) to be replaced. Material and Service to be provided by contractor.
Deck covering damaged at various location. Removal of old deck covering to be undertaken. Surface preparation to be carried out for hull survey. Defects to be rectified as per survey report of yard. Deck covering to be renewed post application of primer on deck. Mfg-J.D. Jones, colour - Light Grey. Material and Service to be provided by Contractor.
9 Mtr aluminum gangway damaged / broken. To be replaced as per existing gangway. Should be capable of Load Tested (4000 Nm2 for 15 mins) as per INBR 1552. Maximum deflection shall not exceed 1/75 of Length of brow. Mat - Al, length - 09 mtr. Load Testing to be carried out. Material and Service to be provided by contractor.
Renewal of Name Board - Ships illumination name box on mast damaged/ defective. To be renewed. Job involves securing arrangement and electrical fittings and lights. Mat - MS (Qty 01) Box dimensions - 770 mm X 470 mm, Font Size - 150 mm. Material and Service to be provided by Contractor.
Ships name board on Port and Stbd side to be renewed. Mat - Wood (Qty 02) with name engraved by steel electroplating. Size - 1090 mm X 780 mm, Font Size - 230 mm (Hindi and English Fonts). Material and Service to be provided by Contractor.
Rope reel on quarter deck jammed. To be eased for free movement. Material and Service to be provided by Contractor.
Executive chairs for VIP room damaged. To be replaced. Job involves removal of old chairs and fitment of new chairs on existing location. Material and Service to be provided by Contractor.
Covers for VIP executive chairs worn out. To be replaced. Mat - Cotton fabric. Material and Service to be provided by Contractor.
MS chairs on upper deck damaged/ broken. To be replaced. Job involves removal of old chairs and fitment of new chairs on existing location with SS fasteners and base securing shoes. Material-stainless steel. Material and Service to be provided by Contractor.
Fire extinguisher brackets damaged/ corroded at scattered locations. To be renewed. Mat - MS. Material and Service to be provided by Contractor.
Ensign staff on quarter deck damaged/ corroded from base and securing brackets damaged. To be repaired/ renewed. Job involves welding and cutting assistance as restring of paint thereafter. Material and Service to be provided by Contractor.
Electroplating of ships bell to be undertaken. Qty - 01. Material and service to be provided by contractor.
Water accumulated on quarter deck (port and stbd). Scuppers to be provided. Mat – MS. Qty – 02. Material and service to be provided by contractor.
Port and Stbd Main Engine, M/s Cummins India Ltd, Model- KTA-38-M2 (1500 hourly routines) (Running hour- Port: 824, Stbd: 816) :- Carry out following routines/works on both Main engine :- (a) Change fuel filters. (b) Clean breather of float tank. (c) Change engine oil (15W40) and hydraulic governor oil. (d) Change engine full flow oil filter. (e) Change by-pass filter element. (f) Clean crankcase breather out let pipe. (g) Check air piping, hoses and clamps for tightness. (h) Clean sea water strainer. (j) Change zinc plugs in the system. (k) Replace the coolant filters. (l) Clean the float tank internally. (m) Check the end clearance of crankshaft and Auxiliary Drive. (n) Check the turbocharger radial and axial clearance. Renew ‘o’ ring and gasket. (p) Clean the magnetic pick up. (q) Carry out overhauling of Sea water pumps. (r) Change air filter. (s) All flexible hoses to be renewed. (t) Tighten all mounting bolts. (u) Change all ‘v’ belts. (v) Adjust valves and injectors. (w) Change the tappet cover gaskets. (x) Renew injector screen filter, fuel pump magnetic screen filter and magnetic screen filter (fitted beneath fuel valve). Quote for Service
Kit for 1500 hourly routines of both Main engines. Quote for Material (Refer Encl. VIII of RFP)
Both Main Engines lub oil cooler and fresh water heat exchangers to be dismantled, chemically cleaned, seals to be replaced and pressure test upto 1.5 times of working pressure. Quote for Service and Material.
Carry out overhauling of both Main engines air starting motors and required defective spares to be replaced. Quote for Service and Material.
Carry out SDC checks of both Main engines local control panel and wheel house control panel, rectify all defects including replacement of sensors and gauges. Additionally, local throttle lever to be replaced. Quote for Service and Material.
Replacement of HMI Display Panel of both Main engines and system to be proved all display parameters. Display make - M/s Schneider (HMI GTO2310). Quote for Service and Material.
Cleaning and buffing of shaftline and propellers to be undertaken and preservation to be carried out post cleaning. Quote for Service and Material.
Stbd Main Engine exhaust cooling sea water pipe corroded. Pipe to be renewed. Dia -65mm, Length-03 Mtrs, Mat-Cu Ni (90:10). Quote for Service and Material.
Both Main engine sea water line rubber bellows perished. Bellows to be replaced as per sample. (a) Dia-45, Qty - 04 (b) Dia-65 mm, Qty-02. Mat - EBDM. Quote for Service and Material.
Air system flexible hoses of both Main engine damaged, to be replaced. Suitable Moisture trap to be provided in system. Quote for Service and Material.
Both Main engine Air starter reducers to be renewed & calibrated. Range (30 bar - 10 bar). Quote for Service and Material.
Port & Stbd Diesel Alternator, Make- M/s Cummins India Ltd, Model- 6 CTA-8.3 D(M), (3000 hourly routines) (Running hrs: Port- 728, Stbd- 1640):- Carry out following routines/works on both DA :- (a) Remove injectors. Clean, inspect, repair & calibrate with new spares. (b) Remove lub oil and fresh water heat exchangers. Clean & pressure test upto required pressure. (c) Remove turbocharger. Clean, inspect & repair with new repair kit (check turbocharger end play and radial clearance). (d) Tighten nut & cap screw of air inlet and exhaust system. (e) Replace belts for accessories. (f) Carry out tappet settings. (g) Check vibration damper visually. (h) Check all cut-out and safety controls. (j) Check crankshaft end play. (k) Replace air cleaner element. (l) Clean engine breather. (m) Replace lub oil and lub oil filter. (n) Flush cooling system. Run engine to bring it to operating temperature. Stop the engine reflush cooling system with potable water 2-3 times. Refill cooling system with required coolant. (p) Post completion of routines, start the engine and check for any oil/fuel/ water /exhaust leakage, rectify deefcts, stop the engine and recheck engine oil level, top up if require. (q) Post completion of routines, carry out load trails. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service.
Kit for 3000 hourly routines of both Diesel Alternators. Quote for Material (Refer Encl. VIII of RFP)
Abnormal noise observed from Port DA idler pulley. Pulley bearing to be renewed and proved for Satisfactory operation. Quote for Service and Material.
Carry out SDC checks of both DA local control panel (at Engine Room) and wheel house display panel, Electronic Governor calibration to be undertaken. Rectify all defects with required spares. Quote for Service and Material.
Carry out following works on both DA:- (a) Serviceability checks of alternator, post completion of routines, start the engine and check all gauges/ sensors, replace all defective guages/ sensors. (b) Carry out calibration of AVR, undertake voltage control test, over voltage protection unit and reverse power relay . (c) Replace existing RRA. (d) Sea water system purging plug and anodes to be replaced. (e) External Load Bank trials to be undertaken. Quote for Service and Material
Both DA Sea water pump to be replaced. Quote for Service and Material
Pressure gauge lines of various system perished. System line to be replaced with end fittings. Dia-5 mm. Mat-Copper. Quote for Service and Material.
Sea water Pressure gauge line flexible hose and adaptors of both Main engine and DA damaged, to be renewed as per sample. Quote for Service and Material.
Pressure gauge isolating cocks of various system to be renewed. Size-15 mm. Mat- Brass. Quote for Service and Material.
Both DA sea water line rubber bellow perished. Bellows to be replaced as per sample. (a) Dia-45, Qty.-04. (b) Dia-65 mm, Qty-02. Quote for Service and Material.
Port and Stbd Gear box, Make- ZF Marine, Model- ZF 3055 (1000 hourly routines):- Carry out following routines on both Gear boxes:- (a) Re-tighten all bolt connections. (b) Turning of oil filter handle to be carried out. (c) Visual inspection/ check of both Gear box to be carried out, rectify all defects. (d) Check shift settings, calibrate if required. (d) Lubricate all external moving parts. (e) Renew lubricating oil. (f) Renew oil filter, clean gap filter and filter housing inspection. (g) Carry out visual inspection of flexible clutch, rectify all defects. (h) Carry out visual inspection of flexible clutch and flexible engine transmission support, rectify all defects. (j) Carry out visual inspection of clutch discs and running gears, rectify all defects. System to be proved for satisfactory performance. Quote for Service
Kit for 1000 hourly routines of both Gear boxes. Quote for Material (Refer Encl. VIII of RFP)
Both Gear box lub oil cooler to be dismantled, chemically cleaned and pressure tested upto 1.5 times of working pressure. Quote for Service and Material.
Carry out SDC checks of both Gear box assembly, rectify all defects. Defective sensors and cable to be replaced. Quote for Service and Material.
Renew both sea water pressure guage(0- 6 Kg/cm2) and temperature guage of both Gear box. Quote for Service and Material.
Fuel/Lub oil Centrifuge (Make –Alfa Laval, Model- MAB 103B-24) (5 Yearly routines):- Undertake following routine/works :- (a) Inlet device:- (i) Clean flow indicator and sight glass. (ii) Change reducing valve (iii) Overhauled the non-return valve. (b) Dismantle and clean separator bowl assembly thoroughly. Clean all components and carry out following routine: - (i) Check disc stack pressure (ii) Check for corrosion, erosion and cracks (iii) Galling of guide surface (iv) renew oil in gear housing. Check the teeth of worm wheel and worm for wear. Replace if defective. (c) Horizontal drive: - (i) Check axial play of coupling disc. (ii) Renew bearings of worm wheel shaft. (d) Vertical drive: - (a) Clean and check bowl spindle and nave for impact marks. (b) Check radial wobble of bowl spindle. Replace if defective. (c) Clean and check buffer and ball bearing housing. Renew if required. (d) Renew ball bearings and top bearing springs. (h) Clean spring and brake shoe. Renew friction pad/brake plug. (j) Clean and check friction coupling. Renew friction pads and lipseal ring. (k) Dismantle pump assembly. Clean bushings, and replace wear gaskets, flexible coupling, and Calibrate relief/safety valve. Renew lipseal ring. (l) Renew frame feet rubber cushions/vibration dampers. (m) Carry out overhauling of Starting Control panel. Post completion of routine, system to be proved for satisfactory performance. Quote for Service
Kit for 5 yearly routines of Fuel and Lub oil Centrifuge. Quote for Material
OWS, Make-Suyash, Model-SD 0.25:- Carry out complete overhauling (Major overhauling) of the separator and renew all worn out parts including instrumentation guages. Post completion of routines, OWS trials to be undertaken and system performance to be proved for Satisfactory operation. Quote for Service
Kit for Major overhauling of OWS, Make-Suyash, Model-SD 0.25. Quote for Material (Refer Encl. VIII of RFP)
MD Air Compressor (Make - Elgi (Model:- HP05 300) :- Carry out following routines:- (a) Replace pressure gauges (range- 0 to 17.5 kg/cm2) (Qty 02), (b) Carry out complete overhaul of compressor including motor part and replace all bearings and spares. (c) Carry out overhauling of Starting control panels. (d) Carry out SDC checks post completion of routine. Replace all defective pressure switches/sensors.Trials to be conducted and system to be proved for satisfactory performance. Quote for Service and Material.
MD air Compressors, Make- Elgi (Model:- HP05 301) - Kit, Complete overhaul Quote for Material
CO2 Fire Fighting System - Carry out following routines:- (a) Renew all flexible hoses. (b) Blow out all distributing piping with air to make sure that it is not blocked. (c) Overhaul non-return valves and safety stop valves, (c) Remove and inspect cylinder operating heads, test for correct functioning, (d) Renew bursting discs fitted in piping system, (e) Carry out pressure testing of all 10 CO2 cylinders. (f) Refill CO2 gas in all cylinders upto required volume. (g) Overhauling of CO2 remote control panel. (h) Carry out audio visual alarm test.System to be proved for satisfactory performance. Quote for Service and Material
Portable Gensets (Make- Honda, Petrol engine, Model- EX2400) - Overhaul Emergency generator set including calibration of instrumentation. Proved for satisfactory operation. Quote for Service and Material
AC Plant, Make-ACCEL/REFCOM (Model-SMC-4-100-S/SRC-S-183) (1000 hourly routines):- Carry out following routines/works on both AC plant compressors:- (a) Replace filter cartidges. (b) Check and adjust Oil presuure regulator. (c) Check compressor for any abnormal noise or vibration, rectify all defects. (d) Check and clean Suction filter with petrol. (e) Check sight glass, covers for leakage. (f) Replace Valve ring plates and valve spring. (g) Check suction and discharge stop valve for leakage. (h) Check solenoid valve. Clean solenoid valve filters. (j) Check controls, gauges for proper functioning. (k) Check piston rings, replace all defective rings. Quote for Service (Note-Replace the parts not confirming to the clearance limits).
Kit for 1000 hourly routines of both AC Plant compressors {Make-ACCEL/REFCOM (Model-SMC-4-100-S/SRC-S-183)}. Quote for Material (Refer Encl. VIII of RFP)
AC Plant, Make-ACCEL/REFCOM (Model-SMC-4-100-S/SRC-S-183):- Carry out following routines/works on both AC plants:- (a) Carry out mechanical/chemical cleaning of both condenser using water jet. Renew corrosion plugs and carry out pressure testing of the condenser. (b) Clean the shock/ vibration mounting of Compressor and Condensor and apply Nicole lacquer. (c) Carry out calibration of following:- (i) L.P cut out (ii) H.P cut out (iii) Differential cut out (iv) Cooling water pressure cut out (v) Anti freeze (vi) Oil pressure regulator. (d) Replace oil and oil filter of compressor. (e) Overhaul all isolating valve on gas system and cooling water system and renew valves, if required. (Renew all Nylon washer and sealing). (f) Renew drier agent. (g) Calibrate all pressure and temperature gauges in the system. (h) Calibrate pressure relief valve fitted on condensor.qty-02. (j) Carry out Nitrogen pressure testing of Gas system, rectify all defects in the system. (k) Carry out Vacuumisation of gas system and refil (Freon-R143A) in the system. Prove both the AC plant for satisfactory operation. (l) Renew thermal expension valve qty -02 (m) Renew cold lagging (running lenght - 15 mtr) Quote for Service and Material
Shafting:- Carry out following works/ routines on both Shafts and propellers:- (a) Clean, polish and grease both propellers and Shaft line. (b) Examine both shaft and propeller for any damage, cracks and wear down, repair as necessary. (c) Locking mechanism of both shaft to be overhauled. (d) Undertake sample inspection of one Plummer block bearings on each shaft line for scoring/corrosion. In case any abnormality is observed, carry out inspection of balance Plummer bearings on the both shaft line. Rectify all defects. (e) Rope guards to be removed and examine ‘A’ bracket bushes/ bearing clearance for wear down. Replace defective bushes/ bearings if wear down not within limit. (f) Dismantle complete deep sea seal and examine parts. All worn out parts to be renewed. (g) Examine the shaft bearings clearances for wear down of both ‘A’ bracket and Stern tube, renew bearings if not within limit. (h) Renew Lub oil of all Plummer blocks. (j) Both Shaft RPM indicator at Wheel house Non-ops, to be renewed. (k) Shaft cooling system for both Stern gland defective. Suspect blockage in cooling line, defect to be rectified. (l) Post completion of routines, Trials of shafting to be undertaken. System to be proved for satisfactory operation. Quote for Service and Material
Sea water hydrophore tank air inlet pipe corroded. Pipe to be manufactured as per sample. Dia-15 mm. L- 05 mtr, Mat-Cu-Ni. Quote for Service and Mat.
Steering Gear (Make - Geeta Engineering, Model-TR2C-2 x 2.1.35(LG-02100) (SR routines):- Carry out following work/routines. (a) Adjust safety valve on rudder motor and pump unit as per manual i.e. 62.5 bar. (b) Calibrate all pressure and temperature gauges. (c) Remove and clean magnetic filters mounted to the pump tanks. (d) Drain hydraulic oil, clean all filter and tanks, charge with fresh oil.(e) Rudder angle indicator back light not working and sluggish response at wheel house. Defect is to be rectified. (f) Surface preparation to be undertaken for survey of both Rudder structure including hull plating in the vicinity of rudders, fitting upto the rudder head, for signs of corrosion, defects and damage. Defects to be rectified as per survey report. (g) Check clearances of lower and upper beaings. Renew the bearings if clearances exceed permissible limit. Bearing will be provided by the firm. (h) Paint to be restored on rudder and hull plating in the vicinity of rudder shaft and brackets, Rudder fittings up to rudder head and keel as per existing paint scheme. (j) Renew all packings of both Rudders. System to be proved for satisfactory operation. Quote for Service
Kit for SR routines on Steering gear. Quote for Material (Refer Encl. VIII of RFP)
Carry out checks of Steering gear control system from wheel house and local control panel and prove the system for correct operation from both places. Defective components to be replaced. Quote for Service and Mat.
Engine room Main Sea Chest Valves not holding, to be replaced. (i) Dia-250 mm, Type-Gate valve, Qty-02. Mat- Gun Metal. Pressure testing of valves to be proved. (ii) Dia-250 mm, Type- Butter fly valve, Qty-02. Pressure testing of valves to be proved. Quote for Service and Material.
AC Sea water Pump, Make- Roysons, Model- (RSP65-160):- Following works to be carried out:- (a) Motor drive end and driven end bearings to be replaced. (b) Motor load trials to be undertaken prior assembly, followed by SPM checks. (c) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (d) Motor windings to be fabricated with high temperature cut out. (e) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Any control components defective to be replaced. (f) Renew mechanical seal and bearings. (g) Replace suction and discharge pressure gauge and pressure switch (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (h) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance. Quote for Service and Material
Aft fuel transfer pump pressure gauge line adapter damaged. Adapter to be renewed as per sample. Mat-Brass. Quote for Service and Material
Fresh Water Hydrophore Pump, Make- Roysons, Model- (R3101-06-MS):- Following works to be carried out:- (a) Motor drive end and driven end bearings to be replaced. (b) Motor load trials to be undertaken prior assembly, followed by SPM checks. (c) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (d) Motor windings to be fabricated with high temperature cut out. (e) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Any control components defective to be replaced. (f) Renew mechanical seal and bearings. (g) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (h) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance. Quote for Service and Material
Bilge/ GS/ Fire Pump, Make-Roysons, Model- (RSP-65-170):- Following works to be carried out:- (a) Motor drive end and driven end bearings to be replaced. (b) Motor load trials to be undertaken prior assembly, followed by SPM checks. (c) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (d) Motor windings to be fabricated with high temperature cut out. (e) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Any control components defective to be replaced. (f) Renew mechanical seal and bearings. (g) Calibrate suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (h) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance. Quote for Service and Material
Fuel Oil Transfer Pump, Make-Roysons, Model- (RGB-4 MF):-Following works to be carried out:- (a) Motor drive end and driven end bearings to be replaced. (b) Motor load trials to be undertaken prior assembly, followed by SPM checks. (c) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (d) Motor windings to be fabricated with high temperature cut out. (e) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Any control components defective to be replaced. (f) Renew mechanical seal, bearings and seals of pump. (g) Inspect gears and casing of pump for wear down, replace if required. (h) Renew suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 . (j) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance. Quote for Service and Material
Hinges to be provided on chequred plates of Engine room for operating system valves. Quote for Service and Mat.
Sea water suction strainers to be manufactured as per sample. Paint with epoxy coating. Mat- SS. Quote for service and material
Fuel System Pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Carbon Steel Steel - 40mm). Quote for Service and Material
Fuel System Pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Carbon Steel Steel - 32mm). Fuel filling point to be renew Quote for Service and Material
Bilge, Fire & Cooling system Pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu-Ni- 65mm). Quote for Service and Material
Bilge, Fire & Cooling system Pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu-Ni- 250 mm). Quote for Service and Material
Bilge, Fire & Cooling system Pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu-Ni- 50 mm). Quote for Service and Material
Compressed Air sytem pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (M.S-25 mm). , Air pipe line to be renewQuote for Service and Material
Compressed Air sytem pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Therefafter undertake fitment onboard and prove for designed performance (M.S., 15 mm). Quote for Service and Material
Lub Oil sytem pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Seamless Steel, 25 mm). Quote for Service and Material
Domestic Sea Water system pipelines:- Removal,repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu-Ni, 32 mm). Pressure Switch to be replaced (range - 2 to 4 Kg/cm2). Quote for Service and Material
Domestic Fresh water & Sea Water system Valve:-Removal, overhauling, pressure testing, painting and fitment of following Valve to be carried out:- (i) 32 mm SD Valve. (Qty-02, Mat- Gun Metal) (ii) 32 mm SDNR Valve. (Qty-04, Mat- Gun Metal) Quote for Service and Material
Bilge, Fire & Cooling system Valve:-Removal, overhauling, pressure testing, painting and fitment of following Valve to be carried out:- (i) 250 mm Butter fly Vlve. (Qty-02, Mat- Gun Metal) (ii) 250 mm Globe Valve. (Qty-02, Mat- Gun Metal) (iii) 80 mm Gate valve. (Qty-01, Mat- Gun Metal) (iv) 65 mm Butter Fly Valve. (Qty-03, Mat- Gun Metal) (v) 65 mm SDNR valve. (Qty-03, Mat- Gun Metal) (vi) 65 mm SDNR angle type over board balve. (Qty-03, Mat- Gun Metal) (vii) 50 mm SDNR Valve. (Qty-01, Mat- Gun Metal) (viii) 40 mm Gate Valve. (Qty-02, Mat- Gun Metal) (ix) 80mm Reducers (qty 02) Quote for Service and Material
Compressed Air system valve:- Removal, overhauling, pressure testing, painting and fitment of following Valve to be carried out:- (i) 25 mm SDNR valve. (Qty-05, Mat- Bronze) (ii) 15 mm SDNR Valve. (Qty-05, Mat- Bronze) (iii) 50 mm SDNR valve (Qty- 03, Mat- Bronze) Quote for Service and Material
Fuel and Lub oil System Valve:-Removal, overhauling, pressure testing and fitment of following Valve to be carried out:- (i) 25 mm QSD valve. (Qty-03, Mat-Gun Metal) (ii) 65 mm QSD Valve. (Qty-02, Mat- Gun Metal) (iii) 32 mm QSD valve. (Qty-01, Mat- Gun Metal) (iv) 40 mm QSD Valve. (Qty-01, Mat- Gun Metal) Quote for Service and Material
General Purpose Valve:-Removal, overhauling, pressure testing, painting and fitment of following Valve to be carried out:- (i) 32 mm Ball valve, Qty-02 (ii) 20 mm Ball Valve, Qty-02 (iii) 15 mm Ball valve, Qty-04 Quote for Service and Material
Renewal of hot lagging for DA and Main engine exhaust trunking. Thickness-25mm, Mat- MWMB. Quote for Service and Material.
Suction and Discharge pressure gauges of various system lines to be renewed as given bellow:- (a) Range-(-1 to 2 kg/cm2), Qty-7 (Vertical mounted) (b) Range- (1 to 6 kg/cm2), Qty-12 (Vertical mounted) (c) Range- (1 to 6 kg/cm2), Qty-06 (Back mounted) (d) Range- (1 to 30 kg/cm2), Qty-06 (Vertical mounted) (e) Range- (1 to 10 kg/cm2), Qty-05 (Vertical mounted). Quote for Service and Material.
Overhauling of Fire hydrants to be carried out. Brass coupling to be renewed. Quote for Service and Material.
Digital Flow meter at both fuel filling points to be renewed. System to be proved for satisfactory operation. Quote for Service and Material
Fresh water and Sea water Hydrphore tank (260 Ltr):- Carry out following works:- (i) Renewal the coating of Hydrophore tank. (ii) Calibrate pressure gauges. Range - (0 to 7) kg/cm2. (iii) Minor air leakage observed in system, to be rectified. (iv) Replace pressure Switch. (v) Associated isolating cocks(20mm, Qty-04) and adaptors to be renewed. System to be proved for satisfactory operation. (vi) Fresh water level indication and sensor to be renew Quote for Service and Material
Air Cylinders:- Air cylinders to be pressure tested upto 1.5 times of working pressure. Cap- 250 ltrs, Test Pr.- 49 Kg/cm2. Associated 03 in no. relief valves to be overhauled. Size- 20mm. Quote for Service and Material.
Level Guage glass to be provided for both Hydrophore tanks, both fuel RU tanks and D/S Lub oil tank . Tank fuel level indication and sensor to be replaced. Quote for Service and Material.
Remote operation of fuel shut off valves (Emergency stop) observed to be sub-optimal. The same is to be overhauled alongwith fittings. Renew defective components. Trials to be undertaken post work completion. System to be proved for satisfactory performance. Quote for Service and Material
Main engine Exhaust leakage at 02 locations in Steering compartment to be rectified, Job involves removal of Hot lagging, defect rectification and replacement of compensators and re-lagging thereafter. Quote for Service and Material.
Portable Submersible Pump(Make-Mody Pumps, Model-M504 T, 20TPH) - Overhauling of portable submersible pump to carried out alongwith startor and motor part. Defective components to be replaced. Quote for Service and Material
Portable Submersible Pump (Make-Mody Pumps, Model-M504 T, 40TPH) - Overhauling of portable submersible pump to carried out along with startor and motor part. Defective components to be replaced. Quote for Service and Material
DD Non submersible pump (Make- Mody, 37 TPH):- Overhaul pump including engine part and replacement of instrumentation gauges. Rubberised suction and discharge hoses damaged, to be renewed (Length - 15mtrs each). Proved for satisfactory operation. Quote for Service and Material
Main Switch Board- Following works to be carried out: - (a) Clean SWBD cables/ wiring, lugs and connectors and other components. Replace damaged insulators and Re-crimp lugs. Qty - 10. (b) Remove panel instrument/ Meters for calibration. Qty-17. Defecctive meters to be replaced. (c) Fuse box of lighting transformer to be checked and fuses to be replaced as per existing ratings. (d) Handles of all breaker to be checked and defective handles to replaced. Quote for Service and Material.
Main Switch board - under voltage relay (240V 10VA) Quote for Material
Schneider push button (230V AC). Quote for Material
Indicating lamp ( 230V AC) Quote for Material
Aux contactor relay Quote for Material
Control MCB ( 24 VDC) Quote for Material
24V DC relay Quote for Material
Control transformer (415V-(110V-220V), 200 VA) Quote for Material
Group starter panel. Following works to be carried out:- (a) Clean starter cables/wiring, lugs and connectors and other components to be replaced. (b) Remove panel protection relay for calibration. Qty - 10. (d) Tighten all connections and terminal screws and place Silica gel for preservation. Existing Group Starter Panel - 02 nos. Quote for Service and Material
Group starter M/s Electronic Control Corporation- Green indicating lamp. Quote for Material
Red indicating lamp Quote for Material
Yellow indicating lamp Quote for Material
HRC fuse 2A Quote for Material
Contactor 16A Quote for Material
Echo Sounder (F-2000), JMC, Japan- Echo sounder showing erratic reading. Carryout calibration of the system and prove for designed performance. Quote for Service and Material
EPIRB, (RLB-37) to be renewed. Quote for Material
Search & Rescue Transponder SART-3(Pathfinder) ACR Electronics - to be renewed. Quote for Material
Window Wiper(Make-Rakmee Engg. Marine Equipment) Window wipers control panel defective. Defective motors to be overhauled. All rubber beading to be renewed. Quote for Service and Material
Clear view screen (Rakme)- Clear view screen motor in wheel house defective. Motor to be replaced. Quote for Service and Material
Speed Log, Japan Marine, JAPAN- Log showing error speed. Carry out calibration of the system and prove for designed performance. Replace defective components. Quote for Service and Material
Call bell/ General alarm system (ECC) - Call bell control panel Non-ops. Carry out repair of the panel. Replace defective components and prove system for optimum performance. Quote for Service and Material
SPT fitted onboard at various locations found defective, to be renewed. Quote for Service and Material
Gyro & Repeater (SIMRAD)-Carry out calibration of the system. Repair defective components and prove system for designed performance. Quote for Service and Material
Transformer Rectifier Unit (ELECTRICAL CONTROL CORPORATION) - Carry out upgradation of existing Transformer rectifier unit to latest version and prove system for satisfactory operation. Quote for Service and Material
Air Whistle not working. To be repaired. Quote for Service and Material
Search light(1000W) not working, to be renewed. Rotating mechanism of both search light Non-ops, fittings and glass to be replaced. Quote for Service and Material
03 Split AC not working onboard. To be replaced. (capacity – 1.5 TR). Quote for Service and Material
Split AC (Cap- 2.5 TR) Non-ops in Wheel house and crew cabin, suspect PCB card faulty and gas leakage in the system. To be replaced. Quote for Service and Material
Magnetic compass Non-ops due to dimmer unit and lamp defective. Carry out repair of the same, replace defective components. Carry out calibration of the system. Quote for Service and Material
Engine order Telegraph (Panel type) ('ISHARA' EC-2400) not working, suspect control failure. Carry out repair of units. Replace defective components and system to be proved for satisfactory operation. Quote for Service and Material
Exhaust fan & blowers:- Carry out overhauling of following Ventillation blower motors along with overhauling of respective Starting control panels:- (a) E/R ventilation blower, 7.5 KW, Qty- 02 (b) Galley ventilation blower, 2.5 KW, Qty- 01 (c) E/R exhaust blower, 5 KW, Qty- 02 (d) Galley exhaust blower, 2.5 kw, Qty-01 (e) AC compartment ventilation blower, 2.5 KW, Qty-01. Quote for Service and Material
60 nos CFL (25W), 60 nos Tubelight (Pin type, 20W), 36 nos Portable Fans (14 inch) & 60 nos Pin type lamp (60W) at various locations to be replaced. Quote for Service and Material
Shore supply panel to be overhauled and all meters (05 Nos) to be replaced and calibrated. Panel box to be renewed. Quote for Service and Material
Engine room lighting system to be replaced with LED lighting (18W, Yellow) arrangement. Quote for Service and Material
Deck light (60W) not working at various locations, to be renewed alongwith fittings. Quote for Service and Material
Voltmeter (0-50V DC) in transformer rectifier unit faulty. To be replaced. Quote for Service and Material
Portable Battery charger (415V, 3 PH, 50Hz, 50A). Quote for Material
Flood light (250W) at various locations to be replaced. Quote for Service and Material
Embrication light control panel non-ops, suspect control supply failure. To be repaired. Quote for Service and Material
Emergency light(24VDC, 1W) at various locations to be replaced. Quote for Service and Material
Following batteries to be replaced:- (a) 12V, 180AH, 18 nos. (b) 12V,7AH, 08 nos. Quote for Service and Material
Following domestic equipment to be renewed:- (a) Hot water Boiler (20 Ltrs). (b) Heavy duty Vaccum cleaner. (c) RO Purifier (20 Ltrs). (d) Deep Freezer(300 Ltrs). (e) Refrigerator (300 Ltrs). Quote for Service and Material
PA system (Ahuja)- Portable PA system unit defective. To be replaced. Quote for Service and Material
Radar (Furuno), Japan- Carry out calibration of the system. Quote for Service and Material
GPS(GPS-170), Furuno, Japan- Carry out calibration of the system. Quote for Service and Material
Fire detection alarm system- Alarm system control panel malfunctioning. To be repaired. Carry out checks of all sensors, replace all defective sensors. System to be integrated with General alarm system. Quote for Service and Material
Shore supply cable (150sqmm, 3 core) Quote for Material
Shore supply connector (male and female) as per sample, Qty- 04 Quote for Material
Tube light Starter and Electronic choke. Quote for Material
Tube light side holder. Quote for Material
63 Amps fuse Quote for Material
32 Amps fuse Quote for Material
16 Amps fuse Quote for Material
100 Amps fuse Quote for Material
Under voltage release coil (240V AC) Quote for Material
Shunt coil (240V AC) Quote for Material
Switch 5A (On/Off) Quote for Material
Following required:- (a) Portable Hand pump for fuel/ lub oil transfer, Qty - 04 nos. (b) 20 ltr Jerry can for lub oil storage, Qty - 16 nos. (c) Oil can (Cap- 250 ml), 12 nos. d) Allen key set Qty - 02 nos (e)Open Spanner and ring spanner set (6mm- 32mm), Qty- 02 nos each (f) Screw Spanner (Size- Small, Medium, Large) Qty- 02 each (g) Box Spanner set with Rachet assmbly. (46 Pc. 1/4") (h) Tool Box (medium), Qty - 02 nos. (j) Combination plier, Qty -15 nos. (k) Nose plier, Qty -05 nos. (l) Wire stripper, Qty -10 nos. (m) 12-13 ring spanner, Qty -15 nos. (n) Insulation tape RYB- 10 each (p) Electrician knife, Qty-10 nos. (q) Screw driver set (TAPARIA), Qty-10 nos, (r) Pneumatic & Electric Impact Wrench, Qty- 02 each, Working Torque 311 Nm. Quote for Material
Wall mounted Fans (Size- 14 inch) at various locations to be renewed. Quote for Material
Dynamo Battery charger defective, to be replaced. Quote for Service and Material
1HP Portable discharge pump with single phase supply (Type- Positive displacement, 02 nos) and Double Diaphragm Portable Pneumatic pump (10 TPH, 02 nos) along with associated flexible hoses (30 mtr each). Quote for Material
Engineering and Electrical log books with covers as per sample to be printed. Quote for Material
Cotton rags. Quote for Material
Cleaning and application of Nicole Lacquer on all SV mounts of all machinery. (Approx -96 SV mounts) Additionally, 20 ltrs Nicole Lacquer to be supplied. Quote for Service and Material
Metallic Locker/ cupboard with lock and key arrangement for Stowage of Log books and POL Records, Height- 1.8 mtrs, Qty -03 nos. Quote for Material
Replacement of portable shore supply box with sepaerate male female connection. Note- Each portable shore supply box to have five male female connection with all safety protection. Quote for Service and Material
Preservation of Steel plates post surface preparation using ST3 Standard. (Note :- payment will be as per actual)
Mercury Ship Repairs Pvt Ltd
SEABLUE SHIPYARD LTD
YEOMAN MARINE SERVICES PVT. LTD.
GOA SHIPYARD LIMITED
CARE MARINE AND ALLIED SERVICES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .