| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.1 CrAccepted-AOC | L-1 | Accepted-AOC L-1 bidder |
Tender Value
₹10.5 Cr
EMD Value
₹13.2 L
Closing Date
12 Apr 2022, 5:00 pmClosed
GM (Civil/Ind.)
Office of GM (Civil), CED HQ, BCCL, Koyla Nagar
Construction of causeway/low level bridge over river Khudia near Chirkunda under CV Area of BCCL for plying vehicles for Coal/OB transporting, Approximate Length- 120m
2022_BCCL_240608_1
BCCL/CED/TC/eNIT-53/21-22/1253 DTD 22.03.22
Open Tender
Civil Works - Others
Item Rate
210 days
Nirsa
As per NIT
6 documents required · 6 mandatory
₹13.2 L
25 Jul 2022
23 Mar 2022
15 Apr 2022
23 Mar 2022
12 Apr 2022
23 Mar 2022
23 Mar 2022 - 29 Mar 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A : COST ESTIMATE (BRIDGE) | |||||
| 1.01 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.and in accordance with MoRT&H technical specifications clause No.304
(Excluding cost of dewatering). This rate is inclusive of carriage cost with all leads as per the site. (a) Ordinary soil | 3,190.79 | cum | - | - |
| 1.02 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.and in accordance with MoRT&H technical specifications clause No.304
(Excluding cost of dewatering). This rate is inclusive of carriage cost with all leads as per the site. (b) Soft rock | 1,057.36 | cum | - | - |
| 1.03 | Back filling behind abutment, wing wall and return wall with Granular material complete as per drawing and Technical Specification clause No.710.1.4 of IRC:78 & 2200. This rate is
inclusive of carriage cost with all leads as per the site. | 1,235.96 | Cu.m | - | - |
| 1.04 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. clause No.710.1.4. of IRC:78 & 2200. This rate is inclusive of carriage cost with all leads as per the site. | 202.67 | Cu.m | - | - |
| 1.05 | Providing & laying Plain / Reinforced Cement Concrete M 15 in Open Foundation complete as per Drawing and Technical Specifications. clause 1500,1700 & 2100, using Batching plant, Transit mixer and Concrete pump. This rate is inclusive of carriage cost with all leads as per the site. | 62.07 | Cu.m | - | - |
| 1.06 | Providing & laying Reinforced Cement Concrete M 35 in Open Foundation complete as per Drawing and Technical Specifications. clause 1500,1700 & 2100, using Batching plant, Transit mixer and Concrete pump. This rate is inclusive of carriage cost with all leads
as per the site. | 538.89 | Cu.m | - | - |
| 1.07 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. clause No.1600. This rate is inclusive of carriage cost
with all leads as per the site. | 42.55 | MT | - | - |
| 1.08 | Providing and laying boulders on toe / heel slab of Abutment/Pier upto 1 m height to restrict local scouring near open foundationn of Abutment & pier in the river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. This rate is inclusive of carriage cost with all leads as per the site.Boulder Laid Dry Without Wire Crates. | 526.54 | Cum | - | - |
| 1.09 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification on Embankment slope. This rate is inclusive of carriage cost with all
leads as per the site. | 647.6 | Cum | - | - |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_248541.xls
BOQ Document • 0.32 MB
94944802.pdf
Tender Document • 10.92 MB
94944804.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .