Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC 101 AMRAPALI APPARTMENT RIGHT BHUSARI COLONY KOTHRUD PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | ₹1.3 Cr | 1 | Accepted-AOC Lowest quoted substantially responsive bidder |
| 2 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| Sl No | Description | Qty | Unit | ARKITECHNO Consultants (India) Pvt. Ltd. L2 | AM DATA LAB PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00LOT 3: INCLUDES GOALPARA SUBPROJECT AREAS | |||||
| 1.01 | Sediment monitoring: SS sampling for concentration measurement in mainstream.
1 Transects * 3 locations * 3 depths* 13 times * 3 years | 351 | No. of Samples | 8,800 ₹30,88,800 | 1,500 ₹5,26,500 Lowest |
| 1.02 | Sediment monitoring: SS sampling for concentration measurement in tributaries.
1 Transect * 3 locations* 3 depth* 13 times * 3 years | 351 | No. of Samples | 8,800 ₹30,88,800 | 1,000 ₹3,51,000 Lowest |
| 1.03 | Sediment monitoring: SS sampling for particle size distribution measurement in main stream
1 Transect * 3 Locations * 3 depths* 3 times * 3 years | 81 | No. of Samples | 8,800 ₹7,12,800 | 1,500 ₹1,21,500 Lowest |
| 1.04 | Sediment monitoring: SS sampling for particle size distribution measurement in tributaries.
1 Transect * 3 Locations * 3 depths* 3 times * 3 years | 81 | No. of Samples | 8,800 ₹7,12,800 | 1,500 ₹1,21,500 Lowest |
| 1.05 | Sediment monitoring: Bed sediment sampling for particle size distribution in main stream.
2 Transects * 3 Location * 2 times * 3 years | 36 | No. of Samples | 8,800 ₹3,16,800 | 2,000 ₹72,000 Lowest |
| 1.06 | Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries.
1 Transect * 3 Locations * 2 times * 3 years | 18 | No. of Samples | 8,800 ₹1,58,400 | 2,000 ₹36,000 Lowest |
| 1.07 | River survey: Cross-section measurements (SBES + Total Station) in mainstream
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
83 km (total length of 8 cross sections) * 3 years | 249 | Km | 5,000 ₹12,45,000 Lowest | 9,800 ₹24,40,200 |
| 1.08 | River survey: Cross-section measurements (SBES + Total Station) in tributaries
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
0.2 km (total length of 1 cross sections) * 3 years | 0.6 | Km | 5,000 ₹3,000 Lowest | 10,000 ₹6,000 |
| 1.09 | River survey: Near-field bathymetric/ topographic measurement
(Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years)
[12 km (length of civil works at 3 locations) + 3 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years | 810 | Km | 4,800 ₹38,88,000 Lowest | 9,700 ₹78,57,000 |
Tender Value
Refer Docs
Closing Date
5 Jul 2025, 2:00 pmClosed
Chief Executive Officer, FREMAA
4th Floor of Assam Water Center (AWC), Near Basistha Chariali, Guwahati-781029
Conducting River Surveys (Bathymetry, Flow, Sediment measurement) Lot 3 Goalpara
2025_WREAP_44895_1
568378/1306C
Limited
Miscellaneous Services
Lump-sum
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
Conference Hall FREMAA
13 Jan 2026
20 Jun 2025
5 Jul 2025
20 Jun 2025
5 Jul 2025
25 Jun 2025
20 Jun 2025 - 24 Jun 2025
23 Jun 2025
Amount
LOT 3: INCLUDES GOALPARA SUBPROJECT AREAS
Sediment monitoring: SS sampling for concentration measurement in mainstream. 1 Transects * 3 locations * 3 depths* 13 times * 3 years
Sediment monitoring: SS sampling for concentration measurement in tributaries. 1 Transect * 3 locations* 3 depth* 13 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in main stream 1 Transect * 3 Locations * 3 depths* 3 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in tributaries. 1 Transect * 3 Locations * 3 depths* 3 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in main stream. 2 Transects * 3 Location * 2 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries. 1 Transect * 3 Locations * 2 times * 3 years
River survey: Cross-section measurements (SBES + Total Station) in mainstream (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 83 km (total length of 8 cross sections) * 3 years
River survey: Cross-section measurements (SBES + Total Station) in tributaries (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 0.2 km (total length of 1 cross sections) * 3 years
River survey: Near-field bathymetric/ topographic measurement (Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years) [12 km (length of civil works at 3 locations) + 3 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years
Hydraulics: Discharge, velocity and water level without sediment measurement in mainstream (Specification: Each cross section to be surveyed 3 times annually during June, August, and October for 3 years) 13 km (total length of 2 cross sections) *3 times a year * 3 year
Hydraulics: Discharge, velocity and water level with sediment measurement in mainstream 2 km (length of 1 cross sections) * 13 times a year * 3 years
Hydraulics: Discharge, velocity and water level with sediment measurement in tributaries 0.2 km (length of 1 cross sections) * 13 times a year * 3 years
Float tracking in mainstream 2 tracks (16 km + 18 km) * 2 times a year * 3 years
Site (underwater work) monitoring surveys: MBES measurement (Specification: At each location MBES measurement shall cover the length of ongoing civil works; survey shall take place annually around October month for 3 years) 12 km (length of civil works at 3 locations) *0.15 km * 3 years
ARKITECHNO Consultants (India) Pvt. Ltd. (BID ID -270962)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71238.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .