Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr | 1 | Accepted-AOC Lowest quoted substantially responsive bidder |
| 2 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| Sl No | Description | Qty | Unit | ARKITECHNO Consultants (India) Pvt. Ltd. L2 | AM DATA LAB PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00LOT 3: INCLUDES GOALPARA SUBPROJECT AREAS | |||||
| 1.01 | Sediment monitoring: SS sampling for concentration measurement in mainstream.
1 Transects * 3 locations * 3 depths* 13 times * 3 years | 351 | No. of Samples | 8,800 ₹30.9 L | 1,500 ₹5.3 L |
| 1.02 | Sediment monitoring: SS sampling for concentration measurement in tributaries.
1 Transect * 3 locations* 3 depth* 13 times * 3 years | 351 | No. of Samples | 8,800 ₹30.9 L | 1,000 ₹3.5 L |
| 1.03 | Sediment monitoring: SS sampling for particle size distribution measurement in main stream
1 Transect * 3 Locations * 3 depths* 3 times * 3 years | 81 | No. of Samples | 8,800 ₹7.1 L | 1,500 ₹1.2 L |
| 1.04 | Sediment monitoring: SS sampling for particle size distribution measurement in tributaries.
1 Transect * 3 Locations * 3 depths* 3 times * 3 years | 81 | No. of Samples | 8,800 ₹7.1 L | 1,500 ₹1.2 L |
| 1.05 | Sediment monitoring: Bed sediment sampling for particle size distribution in main stream.
2 Transects * 3 Location * 2 times * 3 years | 36 | No. of Samples | 8,800 ₹3.2 L | 2,000 ₹72,000 |
| 1.06 | Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries.
1 Transect * 3 Locations * 2 times * 3 years | 18 | No. of Samples | 8,800 ₹1.6 L | 2,000 ₹36,000 |
| 1.07 | River survey: Cross-section measurements (SBES + Total Station) in mainstream
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
83 km (total length of 8 cross sections) * 3 years | 249 | Km | 5,000 ₹12.4 L | 9,800 ₹24.4 L |
| 1.08 | River survey: Cross-section measurements (SBES + Total Station) in tributaries
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
0.2 km (total length of 1 cross sections) * 3 years | 0.6 | Km | 5,000 ₹3,000 | 10,000 ₹6,000 |
| 1.09 | River survey: Near-field bathymetric/ topographic measurement
(Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years)
[12 km (length of civil works at 3 locations) + 3 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years | 810 | Km | 4,800 ₹38.9 L | 9,700 ₹78.6 L |
Tender Value
Refer Docs
Closing Date
5 Jul 2025, 2:00 pmClosed
Chief Executive Officer, FREMAA
4th Floor of Assam Water Center (AWC), Near Basistha Chariali, Guwahati-781029
Conducting River Surveys (Bathymetry, Flow, Sediment measurement) Lot 3 Goalpara
2025_WREAP_44895_1
568378/1306C
Limited
Miscellaneous Services
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
Conference Hall FREMAA
13 Jan 2026
20 Jun 2025
5 Jul 2025
20 Jun 2025
5 Jul 2025
25 Jun 2025
20 Jun 2025 - 24 Jun 2025
23 Jun 2025
Amount
LOT 3: INCLUDES GOALPARA SUBPROJECT AREAS
Sediment monitoring: SS sampling for concentration measurement in mainstream. 1 Transects * 3 locations * 3 depths* 13 times * 3 years
Sediment monitoring: SS sampling for concentration measurement in tributaries. 1 Transect * 3 locations* 3 depth* 13 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in main stream 1 Transect * 3 Locations * 3 depths* 3 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in tributaries. 1 Transect * 3 Locations * 3 depths* 3 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in main stream. 2 Transects * 3 Location * 2 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries. 1 Transect * 3 Locations * 2 times * 3 years
River survey: Cross-section measurements (SBES + Total Station) in mainstream (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 83 km (total length of 8 cross sections) * 3 years
River survey: Cross-section measurements (SBES + Total Station) in tributaries (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 0.2 km (total length of 1 cross sections) * 3 years
River survey: Near-field bathymetric/ topographic measurement (Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years) [12 km (length of civil works at 3 locations) + 3 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years
Hydraulics: Discharge, velocity and water level without sediment measurement in mainstream (Specification: Each cross section to be surveyed 3 times annually during June, August, and October for 3 years) 13 km (total length of 2 cross sections) *3 times a year * 3 year
Hydraulics: Discharge, velocity and water level with sediment measurement in mainstream 2 km (length of 1 cross sections) * 13 times a year * 3 years
Hydraulics: Discharge, velocity and water level with sediment measurement in tributaries 0.2 km (length of 1 cross sections) * 13 times a year * 3 years
Float tracking in mainstream 2 tracks (16 km + 18 km) * 2 times a year * 3 years
Site (underwater work) monitoring surveys: MBES measurement (Specification: At each location MBES measurement shall cover the length of ongoing civil works; survey shall take place annually around October month for 3 years) 12 km (length of civil works at 3 locations) *0.15 km * 3 years
ARKITECHNO Consultants (India) Pvt. Ltd. (BID ID -270962)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71238.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid