| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L-1 |
Tender Value
₹2.3 L
EMD Value
₹4,591
Closing Date
31 Aug 2024, 6:00 pmClosed
Executive Engineer (C)
BSNL Civil Division 107 MG Raod Ambala Cantt
Repair maintenance and painting of Substation Block in Telephone Exchange Compound Ambala Cantt
2024_BSNL_205740_1
16/EE/BSNL/CD/AB/2024-25
Open Tender
Civil Works
Item Rate
30 days
TE Compound Ambala Cantt
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
Accounts Officer (Cash) Ambala BA
₹4,591
24 Feb 2025
22 Aug 2024
3 Sept 2024
22 Aug 2024
31 Aug 2024
22 Aug 2024
Amount
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).
15 mm cement plaster on rough side of single or half brick wall of mix :
1:4 (1 cement: 4 coarse sand)
Distempering with 1st quality acrylic distember (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade :
Old work (one or more coats)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
One or more coats on old work.
Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground , all complete as per directions of Engineer-In-Charge.
With cement mortar 1:4 (1cement: 4 fine sand).
Renewing glass panes, with putty and nails wherever necessary including racking out the old putty:
Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm).
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter.
The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.
Note :- (1) The elevational area of the scaffolding shall be measured for payment purpose.
(2) The payment will be made once only for execution of all items for such works.
Uprooting of peepal or other vegetation growth by uprooting the roots of vegetation growth from within brick work and tile terracing, applying acid on the affected surface to check further growth of vegetation & necessary repairs to the terrace all complete as per site requirement and the direction of Engineer-in-charge.
Grouting with cement mortar 1:3 (1 cement : 3 Coarse sand) mixed with water proofing chemical of pidilite, Dr. Fixit or equivalent in required proportion for flat brick tiles on the top of mud phaska in terrace of buildings including clearing of grass, vegetation etc. before grouting all complete as per direction of Engineer in Charge.
With F.P.S. brick tiles
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .