Loading…
Loading…
Tender Value
₹9.5 Cr
EMD Value
₹6.2 L
Closing Date
11 Mar 2026, 11:00 amClosed
Standardization of Cess in Mavelikkara (MVLK) P.Way - Section
3-TVC-1-2026~SR
3-TVC-1-2026
Open
Works - General
12 Months
Thiruvananthapuram, Kerala
₹0
₹6.2 L
11 Mar 2026
16 Feb 2026
25 Feb 2026
B-Items of works that are not covered by the Indian Railway unified
c-Items of works that are covered by the Indian Railway unified
Item- 1 SW-I Cess making
S No. Item Description of Item Unit Qty Rate Amount
1 011020 Benching of existing embankment manually Kilometre 6.47 387812.38 2509146.10
in steps of 30 cm height for
doubling/tripling works in running line to
provide proper amalgamation between the
old and new embankments as per RDSO
latest Specifications and guidelines
RDSO/2020//GE: IRS-0004 to the entire
satisfaction of Engineer in-charge. The item
includes uprooting and disposing of all the
vegetation, all lift, descends, ascends and
additional earthwork required for filling due
to removal of earth in benching in existing
bank. Note: (1) The benching Work shall be
done for a maximum height of 0.90 m at
any time based on the progress of
earthwork starting from toe of the
embankment. (2) Benching work shall be
certified and recorded before starting the
earth work. (3) Unit for payment shall be
km per metre height of the Bank. Height
here means representative average height
of the bank in the specified km taken from
cross sectional measurements for
earthwork. (4) Since the rate includes
earthwork in steps, payment under this
item shall be made after completion of
earthwork to that level. (5) Cut soil from
bank shall not be used in embankment
construction and disposed off away from
bank as per the direction of Engineer-in-
Earthwork in filling in embankment, guide
bunds, around buried type abutments,
bridge gaps, trolley refuges, platforms etc.
with contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as applicable,
benching in existing banks wherever
required, spreading in layers with motor
grader, bringing the moisture content to
OMC, mechanical compaction to specified
density and dressing of bank to final profile
as per RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips. Note:
1) Foundation preparation, Benching
including additional earthwork on account
of this, wherever required, shall be paid
extra under relevant schedule item for
benching. 2) Payment for Earthwork under
this item shall be made based on the cross
section measurements calculated (i) with
original ground profile of existing bank
based on initial ground levels before doing
benching and (ii) final profile of the bank
worked out with final levels as per
prevailing guidelines.
Item- 2 SW-II-Removing /Re-erecting existing Gradient Post / Kilometre Post
THIRUVANANTHAPURAM DIV-ENGG/SOUTHERN RLY
S No. Item Description of Item Unit Qty Rate Amount
Removing /Re-erecting existing Gradient
Post / Kilometre Post, duly demolishing
concrete foundation, fixing the post in
cement concrete foundation as per drawing
with 1:3:6 mix using 20mm hard aggregate,
as directed (Cost of concrete work will be
paid under relevant item separately).
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].