| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.5 L+₹30,758.01 (4.97%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹6.5 L+₹31,764.28 (5.13%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹6.6 L+₹36,576.05 (5.91%)Rejected-Finance CHATHANNOOR VENDOR S JAYASHANKAR | PALAKKAD | KERALA | 678001 | 4 | Rejected-Finance L4 | |
| 5 | 5₹6.9 L+₹69,829.24 (11.3%)Rejected-Finance | 5 | Rejected-Finance L5 |
Tender Value
₹7.5 L
EMD Value
₹18,641
Closing Date
23 Sept 2023, 6:00 pmClosed
Assistant Engineer
AE LIDEW
Compound Wall Construction
2023_LSGD_602447_1
300/PVR/23-24
Open Tender
Civil Works - Others
Item Rate
180 days
Paravur Municipality
Please refer to tender documents
7 documents required · 7 mandatory
₹1,645
Yes
₹18,641
Yes
23 Nov 2023
13 Sept 2023
25 Sept 2023
13 Sept 2023
23 Sept 2023
13 Sept 2023
Amount
Compound wall construction
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
15.17.2:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
50.9.15.1:Supplying and fixing 200 mm Aluminium aldrop
MUKESH M
GANESH
Thottathil Engineering Construction
Bidder Name
ANIL KUMAR G
MUKESH M
GANESH
Thottathil Engineering Construction
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_896098.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .