Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical FLAT NO 207 LUMBINI ENCLAVE OPP NIMS PUNJAGUTTA HYDERABAD 500082 | HYDERABAD | HYDERABAD | TELANGANA | 500082 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹107.7 Cr
EMD Value
₹2.2 Cr
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer Project Swastik
HQ CE (P) Swastik Upper Burtuk Swastik, Gangtok Pin 737101, Sikkim
CONSTR ON EPC MODE OF GREENFIELD ALIGNMENT TO NHDL SPECN WITH PAVED SHOULDERS FROM NAKU KM 0.000 TO NAKULA KM 9.130 OF TOTAL DESIGN LENGTH 9.130 KM ON ROAD CHUNGTHANG-LACHEN MONASTRY LOG BRIDGE MUGUTHANG NAKU SECTION PART OF NH 310 AG IN THE STATE O
2025_BRO_696900_1
CE(P)SWTK/04/2024-25/EPC
Open Tender
Civil Works - Roads
Lump-sum
1095 days
On Road Naku Nakula Km 0.00 to Km 9.130
As per RFP
2 documents required · 2 mandatory
₹20,000
Chief Engineer Project Swastik
₹2.2 Cr
HQ CE (P) Swastik
3 May 2025
7 Feb 2025
2 Apr 2025
7 Feb 2025
1 Apr 2025
10 Mar 2025
8 Feb 2025 - 4 Mar 2025
4 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) | |||||
| 1.01 | Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) | 1 | EPC | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.47 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
MAINREPORTinclEXECUTIVESUMMARY.pdf
Additional Documents • 7.41 MB
ANNEXofMAINREPORT.pdf
Additional Documents • 3.78 MB
DCAandSCH.pdf
Additional Documents • 3.15 MB
BOQ_780354.xls
BOQ • 0.34 MB
DESIGNREPORT.pdf
Additional Documents • 2.58 MB
MATERISLREPORT.pdf
Additional Documents • 2.07 MB
TECHSPECIFICATIONS.pdf
Additional Documents • 1.91 MB
RFP.pdf
Tender Documents • 1.28 MB
DRAWINGS.pdf
Additional Documents • 35.03 MB
Tenderdocument.pdf
Tender Documents • 1.28 MB
Tenderdocument_2.pdf
Tender Documents • 2.07 MB
Tenderdocument_3.pdf
Tender Documents • 35.03 MB
Tenderdocument_4.pdf
Tender Documents • 7.41 MB
Tenderdocument_5.pdf
Tender Documents • 2.58 MB
Tenderdocument_6.pdf
Tender Documents • 3.78 MB
Tenderdocument_7.pdf
Tender Documents • 1.91 MB
Tenderdocument_8.pdf
Tender Documents • 3.15 MB
BOQ.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .