Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Apr 2026, 3:00 pmClosed
NITHIN C S
SM (P and P)-CD
Leak testing of W2 and W5 Heat Exchanger and other miscellaneous mechanical works in SAP, FACT-CD during ATA 2026.
2026_FACT_904169_1
04097/2025-2026/E33343
Limited
Miscellaneous Works
Item Rate
30 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
Yes
8 Apr 2026
31 Mar 2026
15 Apr 2026
31 Mar 2026
14 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Leak testing of W2 & W5 Heat Exchanger and other miscellaneous mechanical works in SAP, FACT-CD during ATA 2026. | |||||
| - | Dummy closing and opening at W2 Outlet:Closing of W2 outlet vent dummy, 800 NB, with proper gasket inorder to have a leak free joint before leak test and then opening it after leak testing. | 1 | LS | - | - |
| - | Providing Slipplates at W5 inlet & Outlet ducts and removal - The work involves cutting of W5 shell inlet duct from IAT,W5 shell outlet to W2 for for providing Slip plates after giving necessary supports as per instruction of the site engineer. Slip plate provided in W5-W2 duct & W5-IAT Inlet duct shall ensure proper isolation of W2 & W5 vessels before testing. After testing slip plates shall be removed and ducts shall be welded back without any leaks as per instruction from Engineer - in charge. Any welding cutting etc involed in the process shall be under the scope of the contractor.All scaffolding and other site arrangements for the execution of the work shall be under the scope of work of the contractor. | 1 | LS | - | - |
| - | Testing arrangements:Assistance for providing / making hose connection with valve and testing of both W2 & W5Heat Exchangers. | 1 | LS | - | - |
| - | Plugging:Plugging the leaky tubes of W2& W5 on both sides with suitable plugs and full welding as per instructions of Engineer-in-Charge. One tube plugging means plugging from both sides. | 100 | No | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_950359.xls
BOQ • 0.30 MB
TenderDocuments.pdf
Tender Documents • 1.03 MB
SpecialConditions.pdf
Tender Documents • 0.22 MB
compliance1.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .