| L183219509109001 2P X 1.31 SQ MM FEP EXTENSION CABLE PACK 1 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 6,400 | 84 days |
| L184219509109001 2P X 1.31 SQ MM FEP EXTENSION CABLE PACK 2 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 6,400 | 84 days |
| L183219509108001 3C X 2.5 MM2 FEP CONTROL CABLE PACK 3 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 12,400 | 84 days |
| L183219509108002 4P X 0.5 MM2 FEP INST CABLE G PACK 3 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 15,600 | 84 days |
| L184219509108001 3C X 2.5 MM2 FEP CONTROL CABLE PACK 4 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 12,400 | 84 days |
| L184219509108002 4P X 0.5 MM2 FEP INST CABLE G PACK 4 | Puvanendran L 620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING -24,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | 15,600 | 84 days |