| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.9 LAccepted-AOC | L-1 | Accepted-AOC L1 FOUND | |
| 2 | L-2₹9.7 L+₹43,397.90 (4.68%)Rejected-AOC | L-2 | Rejected-AOC L2 FOUND | |
| 3 | L-3₹12.2 L+₹2.9 L (31.3%)Rejected-AOC | L-3 | Rejected-AOC L 3 FOUND |
Tender Value
₹9.9 L
EMD Value
₹24,742
Closing Date
3 Aug 2021, 11:00 amClosed
SR.EXECUTIVE ENGINEER HPSEB KARSOG
KARSOG
Tender for providing 2 Nos. 63kVA Sub-Station stage 1st at Kashpadi at Jujer Khad and 2nd stage at Paboo (Kaluatha) with its 22kV HT line and LT Line in Electrical Section Mahun Nag under Electrical Sub- Division , HPSEBL , Churag. ( NIT- 20/2021-2
2021_HPSEB_50353_1
184619/21221891-97DT 12721
Open Tender
Electrical Works
Item Rate
45 days
CHURAG
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹24,742
11 Aug 2021
26 Jul 2021
3 Aug 2021
26 Jul 2021
3 Aug 2021
26 Jul 2021
Erection Part of Distribution Transformer
Excavation of earth in all kinds of soil for pole pits (size1800 x1200 x 1500mm), stay set pit (size 900 x700 x 1900mm) ,Earthing set pit (2 Mtr. Dia &3 Mtr. Depth), drilling of holes in poles and x-arms, preparation of plateform, structure members, CI/AI x-arms , erection of double poles with RCC muff with concrete filling, erection of plateform for transformer, x-arms, G O switch, dropout fuse unit, lightening arrestor, etc., erection of stay set, erection of 63kVA, 22/.4kV transformer,LT Panel box, LT cable, Trivector meter, filling and ramming of pits, erection of jumpers, LT earthing and fixing of barbed wire and painting of sub-station structure(Duoble coat) complete in all respect as directed by Engineer-in charge .
Mannual carriage of 25 KVA, 22/.4 KV Sub-station alongwith material for an avrage lead of 1.000 KM from road head to site of work. (Rate to be quoted for 1 KM lead only) 1 Km each Transformer.=1x1=2
Supply Part of Distribution Transformer
Prov. RCC Muff 2000 mm with c.c 1:2:4 (1 cement :2 sand : 4 aggregate 20 mm)
Prov. C I X-arm (2800x100x50x6 mm) for T/F base main channel
Prov. C I X-arm (2800x75x40x6 mm) for fuse unit AB switch
Provinding C.I. (460x100x50 mm) for supporting main channel of Transformer.
Provinding A.I. (460x35x35 mm) for Transformer belting.
Provinding A.I. (2800x50x50x6 mm) for Transformer belting.
Provinding A.I. x-arm (2800x50x50x6 mm) for Lightening Arrestor.
Prov. GO AB SwitchUnit(22KV,400A,25 KV)
Prov. DO Fuse Unit.
Disc Insulators Set ( Comprising 1no. Disc Procilain,BS 12 KV 90Kn) ie dead and clamp.
Dead and Clamp
Bend Stapple
Prov. Pipe Earthing
Prov. HT stay set complete
Prov. LT Distribution Panel Box with MCCB(100 A,25 KA,4P,1 No.) and SFU(16A,4 No, rewirable)
Prov. Surger arrestor 18 kV station class (Porcilain Type) LA
Full Clamp made of M.S. Flat 50x6mm suitable for 9/8 mtr ST ple as per the standard specification of HPSEBL
Prov. AI Thimble
Prov. Copper Thimble
Prov. Lead Tin solder 60:40
Prov. Solder flux
Prov. M.S.Nut & Bolts off sizes.
Prov. Barbrd wire.
Provinding Alluminium paint of superior quality.
Erection Part of 22 kV HT Line
Erection of HT steel tubular pole 9 mtr. Long(Double pole structure):- Excavation of earth in all kinds of soil for making two numbers pits of size (1.5x1x1x)M each, suitable for installing STP 9 mtr long, erection of S.T.P 9 M long with RCC muff in the excavated pit, refilling of pit with excavated soil including watering and ramming etc. as required, disposing off surplus soil at the dumping site of local bodies, fixing of M.S clamps , stay clamps, stay wire, M.S channel cross arms, AI bracings,barbed wire, danger plats, isulators, nut & bolts,continuous earth wire with MS clamps, including drilling,bending welding etc.as required, filling of RCC muff with Cement concrete in ratio 1:2:4 (1cement:2 sand :4 concrete 20mm nominal size) from bottom to top painting of all steel parts and STP with two coats of aluminium paint superior grade and fixing of any other item required to complete the job, as per standard practice of HPSEBL/REC, as per the direction of Engineer-in -charge
Erection of HT steel tubular pole 9 mtr. Long Single Pole structure):- Excavation of earth in all kinds of soil for making pits of size (1.5x1x1x) mtr. suitable for installing S.T.P. 11 M long, erection of S.T.P 11 M long with RCC muff in the excavated pit refilling of pit with excavated soil including watering and ramming etc. as required, disposing off surplus soil at the dumping site & local bodies, fixing of M.S clamps , stay clamps, stay wire,M.S channel cross arms,AI bracing,barbed wire danger plats, isulators nut & bolts including drilling,bending welding etc.as required, filling of RCC muffwith Cement concrete in ratio 1:2:4 (1cement:2 sand :4 concrete 20mm nominal size) from bottom to top painting of all steel parts and STP with two coats of aluminium paint A grade fixing of any other item required to complete the job, as per standard practice of HPSEBL as per the direction of Engineering in charges.
Erection of HT earthing Set Excavation of earth in all kinds of soil for making pits of size (2.5x1x1mtr) fixing of HT earthing set with GI wire in pit refilling of pit with alternate layer of charcoal 40 Kg, salt 40Kg and soft soil, including ramming watering etc. as required, disposing of surplus soil at dumping site of local bodies, earthing of structure and allied material such as stay wire, isolators channels etc. with GI wire 6 SWG and P/fixing any otherpetty Items to complete the job as per satisfaction & direction of Engineer in Charges, complete in all respect.
Erection of HT stay set :- Excavation of earth in all kinds of soil foor making stay pit of size 1.2x1x1M, fixing of HT stay set ,nozelling and tightening of stay wire complete, refilling of pit with excavated soil including watering and rammining of soil,disposing off all surplus soil at dumping site of local bodies, fixing of any other material required to complete the job, complete in all respects as per standard practice of HPSEBL and as per satisfaction & direction of Engineer in Charges, complete in all respect.
Fixing of Jumper
Laying, stringing and sgging of ACSR 6/1/2.59 mm(30 mm) of 22 KV HT line:- Unrolling, laying of conductor, stringing and sagging, binding with insulator,jumpering etc, as required as per satisfaction & direction of Engineer in Charges, complete in all respect.(Rate to be quoted per Km line)2.261*3=6783
Laying, stringing and sgging of G.I. earth wire(2wire) of 22 KV HT line:- Unrolling, laying of GIwire 8SWG, stringing and sagging, binding with insulator,jumpering etc, as required as per satisfaction & direction of Engineer in Charges, complete in all respect (Rate to be quoted per Km line)
Mannual carriage of all 22 KV HT line material including STP etc, for an average lead of 1 kM from road head to site of work.
Supply Part of 22 kV HT Line
Providing RCC Muff 2000 mm with CC 1:2:4 (1 cement :2 sand : 4 aggregate 20 mmnomonal size)
Providing C I X-arm (2800x100x50x6 mm)
Providing A I X-arm (2100x50x50x6 mm)
Providing C I X-arm (1800x100x50x6 mm)
Providing A I X-arm (3000x50x50x6 mm)
Providing CI X-arms (1500x100x50x6mm)
Providing Knee bracing set 2x(850x50x50x)mm
Providing Belt set (X- bracing set) 2(1500x50x50x5)
Providing Belt set (X- bracing set) 2(2700x50x50x5)
Providing Bend stapple
Providing Dead end clamp
Providing DO Fuse unit
Providing GO Switch complete
Providing Top Clamp (MS Flat 50x6 mm)
Providing Half Clamp made of M.S. Flat 50x6mm suitable for 9/8 mtr ST pole as per the standard specification of HPSEBL
Providing Full Clamp made of M.S. Flat 50x6mm suitable for 9/8 mtr ST ple as per the standard specification of HPSEBL
Providing M.S.Nut & Bolts off sizes.
Providing Barbrd wire
Erection Part of LT Line
Erection of Steel tubular pole 9 mtr. Long :-Digging of pit for poles, drilling of holes in poles,erection of poles, erection of RCC muff,erection of Angle iron bracket,D-iron, shackle insulator,earth hook filling of pit and ramming, Painting etc, of pole complete in all respect.
Stay set(LT):- Digging of pit(0.8x1.2x1.35m),fixing of stay rod, filling and ramming of pit, nozzelling and tightening, . complete in all respect.
Earthing set(LT):- Digging of pit (0.8x1.2x1.5m),fixing of G.I wire to earth system, filling and ramming of pit, etc. complete in all respect.
Laying, stringing and sagging of ACSR 6/1/3.35mm, (50 mm) of 3 Ø LT line and1 wire for Netural :-Laying of conductor, stringing and sagging, binding with insulator, making jumpers on dead poles etc. complete in all respect.
Laying, stringing and sagging of G.I. earth 8 SWG (1wire) :-Laying of GI wire, stringing and sagging complete in all respect.
Mannual carriage of LT line material for an average lead of 1.000Km. from road head to site of work.
Supply Part of LT Line
Prov. RCC Muff 2000 mm with c.c 1:2:4 (1 cement :2 sand : 4 aggregate 20 mm)
Prov. Aluminium Paint .
Prov. MS Nuts & Bolts off size.
Shackle Insulator with D-ron
LT Stay Set
LT Stay Clamp
Eye Hook Bolt
Egg Insulator
LT Earthing Set
M/s M.S. Electrical and Engineering works
Shivalik.inc
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .